Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAccepted-AOC | ₹3.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.5 L+₹3,513 (1.01%)Rejected-Finance | ₹3.5 L+₹3,513 (1.01%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹3.5 L+₹5,252 (1.51%)Rejected-Finance LOWER KAFFER KALIMPONG | KALIMPONG | ₹3.5 L+₹5,252 (1.51%) | L3 | Rejected-Finance Rejected |
Tender Value
₹3.5 L
EMD Value
₹6,957
Closing Date
19 Jun 2026, 6:55 pmClosed
BLOCK DEVELOPMENT OFFICER
OFFICE OF THE BLOCK DEVELOPMENT OFFICER, LAVA DEVELOPMENT BLOCK
CONSTRUCTION OF PARK WASTE TO WEALTH GARDEN AT GITKOLBONG, LAVA-GITBEONG GRAM PANCHAYAT UNDER LAVA DEVELOPMENT BLOCK, ALGARAH.
2026_DMK_5015114_2
BDO/NIeTNo.37/2025-26
Open Tender
CIVIL WORKS
Percentage
LAVA GITBEONG
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,500
₹6,957
17 Aug 2026
11 Jun 2026
22 Jun 2026
11 Jun 2026
19 Jun 2026
11 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation of foundation trenches or drains in all sorts of soils(Including mixed soils but excluding laterite or sandstone), including removing, spreading or stacking the spoils within a lead of 75 m as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. | 71.67 | m3 | 119.27 | ₹8,548.08 |
| 2 | (A) Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming and preparing the bed to proper level and filling up all joints with sandy clay or earth. | 99.81 | m2 | 64 | ₹6,387.84 |
| 3 | (B) Cost of Boulders | 14.97 | m3 | 1,526.4 | ₹22,850.21 |
| 4 | Cement Concrete with graded jhama khoa(30 mm size excluding shuttering in ground floor and foundation | 1 | m3 | 5,396.94 | ₹5,391.54 |
| 5 | Ordinary Cement Concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any in ground floor as per relevant IS Codes. | 0.92 | m3 | 6,996.56 | ₹6,414.45 |
| 6 | Reinforcement for reinforced concrete in all sorts of structures including distribution bars,stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction | 0.28 | MT | 74,432.93 | ₹20,841.22 |
| 7 | Hire and labour charges for shuttering with centering and necessary staging upto 4m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns,lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (a)25mm to 30mm thick wooden shuttering as per decision & direction of
Engineer-In-Charge. | 60.1 | m2 | 400.8 | ₹24,088.08 |
| 8 | Plaster to (wall floor ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and racking out joints including throating, nosing and drip course scaffolding /staging, where necessary (Ground floor). Excluding cost of chipping over concrete surface. | 123.6 | m2 | 241.92 | ₹29,901.31 |
| 9 | Neat Cement Punning about 1.50mm thick in wall, dado, window sill,floor etc. | 40.5 | m2 | 40.8 | ₹1,652.4 |
| 10 | Plum Concrete work with 40% cement Concrete with 30mm down graded stone metal and 60 % of stone boulder of size 150 mm and above,placed in position as directed excluding shuttering if any | 19.8 | m3 | 3,912.56 | ₹77,468.69 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.40 MB
BOQ_5084129.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .