Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 CrAccepted-AOC | ₹1.2 Cr | 1 | Accepted-AOC As per financial evaluation |
| 2 | 2₹1.4 Cr+₹21.3 L (18.3%)Rejected-AOC 47 C MODEL TOWN EXTENSION LUDHIANA PB | LUDHIANA | PUNJAB | 141001 | ₹1.4 Cr+₹21.3 L (18.3%) | 2 | Rejected-AOC As per financial evaluation |
| 3 | 3₹1.4 Cr+₹24.3 L (20.9%)Rejected-AOC 1 APEX ENTERPRISES SAHIMJRA PHASE 5 MOHALI PUNJAB 160055 UDYAM PB 20 0100677 | S A S NAGAR | PUNJAB | 160055 | ₹1.4 Cr+₹24.3 L (20.9%) | 3 | Rejected-AOC As per financial evaluation |
| 4 | 4₹1.4 Cr+₹28.1 L (24.1%)Rejected-AOC 01 ENTERPRISES | ₹1.4 Cr+₹28.1 L (24.1%) | 4 | Rejected-AOC As per financial evaluation |
| Sl No | Description | Qty | Unit | RUPINDER SINGH CONTRACTOR L4 | MANMOHAN SINGH CONTRACTOR L3 | surya constructions L1 | APEX ENTERPRISES L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in soil (any Type) using hydraulic excavator
CK 90, Excavation with hydraulic excavator of 0.9 cum
bucket capacity i/c cutting, trimming bottom and side
slopes in accordance with requirement of lines, grades and
x-sections, i/c all lifts and combined lead up to 30 mtr | 158.58 | cum | 27 ₹4,281.58 | 36 ₹5,708.77 | 30 ₹4,757.31 | 25 ₹3,964.43 Lowest |
| 2.00 | Supply of boulder stone as per departmental specifications
i/c digging, collection, all taxes, loading, unloading, from
Govt. approved quarry to stack site | 67.96 | cum | 1,650 ₹1,12,137.3 | 1,545 ₹1,05,001.29 | 1,280 ₹86,991.36 Lowest | 1,603 ₹1,08,943.09 |
| 3.00 | Rehandling of boulders with avg. lead 1km i/c loading,
unloading manually | 317.15 | cum | 145 ₹45,987.48 | 105 ₹33,301.28 Lowest | 124.5 ₹39,485.8 | 140 ₹44,401.7 |
| 4.00 | Weaving wire netting for wire crates including binding
sides and partitions to make a crate of 15 cm x 15 cm mesh | 624.29 | cum | 185 ₹1,15,493.28 | 190 ₹1,18,614.72 | 158.5 ₹98,949.65 Lowest | 180 ₹1,12,371.84 |
| 5.00 | Filling boulder stone into wire crates, hand packing | 303.23 | cum | 330 ₹1,00,064.58 | 300 ₹90,967.8 | 254.3 ₹77,110.37 Lowest | 329 ₹99,761.35 |
| 6.00 | Tipping wire crates including equipment charges | 1,581.53 | cum | 115 ₹1,81,875.95 | 130 ₹2,05,598.9 | 108 ₹1,70,805.24 Lowest | 110 ₹1,73,968.3 |
Tender Value
₹1.6 Cr
EMD Value
₹3.1 L
Closing Date
30 Jun 2025, 10:00 amClosed
Executive Engineer
ROPAR
Flood Risk Mitigation along 3L Band of Satluj River from Upstream of RD 41000 near Villages of Fassa and Sarangpur Distt Ropar
2025_WR_141419_1
5843
Open Tender
Civil Works
Item Rate
90 days
Ropar
AS PER DNIT
3 documents required · 3 mandatory
₹0
₹3.1 L
19 Aug 2025
28 May 2025
30 Jun 2025
28 May 2025
30 Jun 2025
28 May 2025
Amount
Excavation in soil (any Type) using hydraulic excavator CK 90, Excavation with hydraulic excavator of 0.9 cum bucket capacity i/c cutting, trimming bottom and side slopes in accordance with requirement of lines, grades and x-sections, i/c all lifts and combined lead up to 30 mtr
Supply of boulder stone as per departmental specifications i/c digging, collection, all taxes, loading, unloading, from Govt. approved quarry to stack site
Rehandling of boulders with avg. lead 1km i/c loading, unloading manually
Weaving wire netting for wire crates including binding sides and partitions to make a crate of 15 cm x 15 cm mesh
Filling boulder stone into wire crates, hand packing
Tipping wire crates including equipment charges
APEX ENTERPRISES (BID ID -656518)
MANMOHAN SINGH CONTRACTOR (BID ID -656553)
RUPINDER SINGH CONTRACTOR (BID ID -656519)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .