| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.5 LAccepted-AOC | ₹29.5 L | L1 | Accepted-AOC accepted |
| 2 | L2₹29.8 L+₹29,556.21 (1.00%)Rejected-AOC | ₹29.8 L+₹29,556.21 (1.00%) | L2 | Rejected-AOC rejected |
| 3 | L3₹30.1 L+₹59,053.42 (2.00%)Rejected-AOC | ₹30.1 L+₹59,053.42 (2.00%) | L3 | Rejected-AOC rejected |
Tender Value
₹29.5 L
EMD Value
₹29,497
Closing Date
31 Jul 2026, 5:00 pmClosed
Executive Engineer (RWS), kunthebag, alibag tal- a
Executive Engineer (RWS), kunthebag, alibag tal- alibag dist- raigad
Construction of Protoection Wall for River Side at Gavanwadi in V.P.Khandas Tal.Karjat Dist.Raigad
2026_RAIGA_1319345_1
RAIGAD/RWSS/41/2026-27
Open Tender
Civil Works - Water Works
Percentage
180 days
Tal.Karjat Dist.Raigad
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,180
₹29,497
17 Sept 2026
19 Jul 2026
3 Aug 2026
19 Jul 2026
31 Jul 2026
19 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Item No. 1:-Cleaning grass and removal of rubbish up to a distance of 50 meters outside the periphery of the area as directed. | 450 | Sqm | 4.66 | ₹2,097 |
| 2 | Item No.2 - Excavation in hard murum including boulders up to 0.6 m diameter (0.113 cum) for canal, seating of embankment, filter drains / catch water drains etc., and placing the excavated stuff neatly in dump area or for formation of service road / embankment including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc., complete with lead up to 15 m and all lifts as directed.. | 76.95 | cum | 54.28 | ₹4,176.85 |
| 3 | Item No.3 - Excavation in soft rock without blasting including boulders up to 0.6 m diameter (0.113 cum) for canal, seating of embankment, filter drain / catch water drains etc., and placing the excavated soft rock neatly in dump area or for formation of service road including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc. complete with lead up to 15 m and all lifts as directed | 76.95 | cum | 70.6 | ₹5,432.67 |
| 4 | Item No.4 Excavation in hard rock of all toughness by blasting including boulders above 0.6 m dia.(0.113Cum) minimizing damage to side slopes of excavation in water prism area by adopting any one or combination of line drilling /pre-splitting /smooth blasting techniques and placing the excavated rock neatly in approved dump area including cost of all materials, machinery, labour, leveling bed etc., complete with lead up to 15 m and all lifts as directed | 51.3 | cum | 449.61 | ₹23,064.99 |
| 5 | Item No.5 Providing and laying rubble soling below foundation in layers including fillinf with rubble chips murum etc. complete (Excluding royalty material) | 25.65 | cum | 2,316.98 | ₹59,430.63 |
| 6 | Item No.6 Providing and laying in situ cement concrete of grade M-10 of trap / granite / quartzite / graded metal for foundation and bedding with Concrete Mixer including placing, compacting, curing etc. complete with an initial lead of 1 km & all lifts as directed. | 17.1 | cum | 5,623.26 | ₹96,157.75 |
| 7 | Item No. :- 7 Drilling holes of 25mm dia and 0.75m depth in hard rock including all labpur charges | 45 | Nos | 500 | ₹22,500 |
| 8 | Item No. 8:- Providing and laying in situ cement concrete of grade M-15 of trap / granite / gneiss / quartzite / graded metal for PCC with or without surface reinforcement/ RCC concreting requiring heavy or special type of shuttering for works of gallery, sluice, spillway crest, spillway downstream face, energy dissipating structures, intake structures, training walls, piers, abutments etc. with Concrete Mixer with shuttering and scaffolding, placing, compacting, curing with an initial lead of 1 km and all lifts etc. complete as directed. | 310.5 | cum | 6,885.33 | ₹21,37,894.97 |
| 9 | Item No.9 Providing & laying in position TOR steel reinforcement including Cutting bending binding including cost of reinforcement binding wire etc complete with a lead of 50 m & lift of 1.50 m | 1.55 | MT | 61,817.89 | ₹95,972.27 |
| 10 | Item No.10 Providing and laying weep holes of 80 mm dai. AC/PVC pipe as per drawing for Walls Including cost of all material and labour etc.complete | 46.5 | Rmt | 254.1 | ₹11,815.65 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.12 MB
BOQ_2261106.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .