| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-AOC | L1 | Accepted-AOC AWARD OF WORK TO L1 BIDDER AND REJECT L2 AND L3 BIDDER DUE TO NOT L1 BIDDER | |
| 2 | Rejected-Technical JAITPUR JAYANT SINGRAULI PIN 486890 | JAYANT | SINGRAULI | MADHYA PRADESH | 486890 | - | Rejected-Technical NOT L1 BIDDER | |
| 3 | Rejected-Technical 521 UBI ROAD SINGRAULI SINGRAULI SINGRAULI MADHYA PRADESH 486889 | SINGRAULI | MADHYA PRADESH | 486889 | - | Rejected-Technical NOT L1 BIDDER |
Tender Value
₹2.4 L
EMD Value
₹3,000
Closing Date
6 Apr 2024, 11:00 amClosed
GENERAL MANAGER EXCAVATION, NCL KHADIA PROJECT
NCL KHADIA PROJECT, SHAKTINAGAR, SONBHADRA, U.P.
Repairing of EOT Crane of Dumper Section, New Workshop of Khadia Project.
2024_NCL_305861_1
KHD/G.M. (Excv)/E-Tender/23-24/1280
Open Tender
Excavation Department Work
Item Rate
18 days
NCL KHADIA PROJECT, SHAKTINAGAR
Please refer Tender documents.
6 documents required · 6 mandatory
₹3,000
5 Jun 2024
26 Mar 2024
8 Apr 2024
26 Mar 2024
6 Apr 2024
27 Mar 2024
26 Mar 2024 - 30 Mar 2024
Amount
Scope of Work : 1. Cleaning of all dirt, grease, lubricants of overhead crane system. 2. Repairing of gear box of hoist system. 3. Repairing of gear box of forward and reverse operation system. 4. Repairing of gear box of side movement system. 5. Fitting of all repaired gear box in respective assemblies. 6. Rail line grinding and alignment. 7. Rail line clamping & nut, bolt tightening. 8. Cleaning of power rail path and electrical panel box. 9. Fitting of new hoist brake liner & CT brake liner. 10. Fitting of new auxiliary contractors, oil seals.
Dismantling of gear box of hoisting system, forward & reverse system, side movement system.
Labour Charges for Dismantling of gear box of hoisting system, forward & reverse system, side movement system including Contractor's Profit. . Note : It includes a group of 01 No. Skilled Fitter, 01 No. Skilled Welder, 01 No. Skilled Grinder Man & 01 No. Semi-Skilled manpower in 02 Shifts per day for 06 days.
Hiring Charges of Welding Machine.
Hiring Charges of Welding accessories and gas cutting set.
Hiring Charges of Grinder Machine.
Cost of Grinding Stone.
Material required for changing of old, deteriorated material with new one for smooth and safe working of over head crane.
Cost of Oil Seal.
Cost of Hoist brake liner.
Cost of Delay Relay timer.
Cost of LT brake liner.
Cost of CT Brake liner.
Cost of H. L. C. auxilliary contactor.
Cost of Auxilliary contactor (3TA-22-100A-110AC).
Fitment and completing work of changing of old, deteriorated material with new one for smooth and safe working of overhead crane as per design and technical specification of overhead crane.
Labour Charges for Fitment and completing work of changing of old, deteriorated material with new one for smooth and safe working of overhead crane as per design and technical specification of overhead crane including Contractor Profit. . . Note : It includes a group of 02 Nos. Skilled Fitter & 01 No. Skilled Electrician Manpower in 01 Shift per day for 12 days .
Total impact of GST for the purpose of CTC
M/s Bright Engineering
Sandeep and Co.
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_316950.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .