Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.5 LAdmitted-Finance | -16.00% | ₹2.5 L | L1 | Admitted-Finance |
| 2 | L2₹3.0 LAdmitted-Finance | +1.00% | ₹3.0 L | L2 | Admitted-Finance |
| 3 | L3₹3.1 LAdmitted-Finance | +2.00% | ₹3.1 L | L3 | Admitted-Finance |
| 4 | L4₹3.2 LAdmitted-Finance | +5.00% | ₹3.2 L | L4 | Admitted-Finance |
Updated dates
Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
10 Mar 2026, 6:55 pmClosed
Executive Engineer REW Division Poonch
Executive Engineer REW Division Poonch
Please refer to Boq
2026_RDPR_304951_8
e-NIT 267 of REW Poonch 2025-26 Date 02-03-2026
Open Tender
Civil Works
30 days
Poonch
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Division Poonch
₹6,000
12 Mar 2026
2 Mar 2026
11 Mar 2026
2 Mar 2026
10 Mar 2026
2 Mar 2026
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 30% stones
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases of columns etc. for mass concrete.
Centering and shuttering including strutting, propping etc. and removal of form for: Lintel, beams, plinth beams, girders, bressumers and cantilevers.
Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms.
Centering and shuttering including strutting, propping etc. and removal of form for: Edges of slabs and breaks in floors and walls Above 20 cm wide
Filling with available excavated earth and stones both 50%
Carriage of sand/Agg. by 08 km MT
Carriage of stone by 50 metre by HL
Add Cost of CIB
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
BOQ_990579.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid