Tender Value
Refer Docs
EMD Value
₹1.0 Cr
Closing Date
20 Nov 2019, 3:00 pmClosed
THE PROJECT DIRECTOR DRDA, DINDIGUL
THE PROJECT DIRECTOR DRDA, DINDIGUL
Dindigul Dist - TNRRIS 2019-2020 - Reddiarchatram block road works TN-05-04
2019_RDTN_145255_1
DIPR/3969/TENDER/2019 RDC N-05-04
Open Tender
Civil Works - Roads
180 days
DINDIGUL
Dindigul Dist - TNRRIS 2019-2020 - Reddiarchatram block road works TN-05-04
4 documents required · 4 mandatory
₹0
₹1.0 Cr
THE PROJECT DIRECTOR DRDA, DINDIGUL
3 Feb 2020
11 Nov 2019
20 Nov 2019
11 Nov 2019
20 Nov 2019
14 Nov 2019
14 Nov 2019
Amount
Part 1:RDC Kannivadi road to Melapatty KM 0/0-2/48 Estimate Amount Rs.101.51 lakhs
Clearing the scrub jungle by uprooting including all cutting charges and depositing disposing of the products and clearing as directed by the Departmental Officers including all incidential charges etc., complete in charges etc complete
Picking the existing metal surface and sectioning undulations including all incidential charges etc., complete in charges etc complete
Earthwork excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated
Providing and laying Gravel to 100mm compacted thick includng all labour charges for spreading watering and leveling to camber forundulation forundulation of surface etc complete 100% compaction
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACL COAT over WMB/ WMM surface at 3.00Kg Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying Bituminous macadam 50mm thick using 26.50 to 13.20mm 0.20 cum of 13.20-2.36mm 0.43cum , 0.08 cum of 2.36mm and below with 37kg of VG30/VG 40 bituminous for premixing per 10 sqm including cost and conveyance of all materials etc completed.
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Supply of Kilometre Stone of size 1.65mx0.45x0.15metre
Supply of Hectametre Stone of size 0.90x0.15x0.15metre
Provision for Name Board
Provision for sign Board
Construction of RCC slab culvert At Ch 0/0-1/0
Earthwork excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth etc.,
Plain cement concrete 1:4:8 using 40mm ISS HBG metal including cost and conveyance of all materials to site including formwork and centering, labour charges, transporting and placing in position, compacting, finishing and curing, working at depths, Tools etc., complete
Plain cement concrete 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials to site including formwork and centering, labour charges, transporting and placing in position, compacting, finishing and curing, working at depths, Tools etc., complete - Below sill
Plain cement concrete 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials to site including formwork and centering, labour charges, transporting and placing in position, compacting, finishing and curing, working at depths, Tools etc., complete - Above sill
Supplying and fabrication and placing in position mild steel or ribbed tor steel and all reinforced cement concrete works asper the design given including cost of steel and binding wire in all floors etc., complete complying with standard specification.
Supply and Erection and centering of sides and soffits including supports and strutting up to 3.29m height for place surfaces in all floors with all cross bracing using mild steel sheets of size 90cmX60cm and 10 gauge stiffened welded with mild steel angles of size 25mmX3mm for boarding laid over silver oak ( country wood) poists of size 10cm X6.5cm dia spaced at about 90cm centre to center etc., complete complying with standard specification - Sub Structure
Supply and Erection and centering of sides and soffits including supports and strutting up to 3.29m height for place surfaces in all floors with all cross bracing using mild steel sheets of size 90cmX60cm and 10 gauge stiffened welded with mild steel angles of size 25mmX3mm for boarding laid over silver oak ( country wood) poists of size 10cm X6.5cm dia spaced at about 90cm centre to center etc., complete complying with standard specification Super Structure
Plain Cement concrete 1:2:4 using 20mm ISS HBG metal including cost and conveyance of all materials to site including formwork and centering, labour charges, transporting and placing in position, compacting, finishing and curing, working at depths, Tools etc., complete
Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal including cost and conveyance of all materials to site including formwork and centering, labour charges, transporting and placing in position, compacting, finishing and curing, working at depths, Tools etc., complete
Back filling with Earth behind the abutment & inbetween the wings including all labour charges etc., complete
Providing Weep holes in Abutments & wings reinforced CC with 100mm dia AC pipe extending through the full width of the struction with standard specificaito
Provision for Expansion joint inbetween the dirt wall & deck in pier in standard specification
Provision and laying Kraft paper barrying between deck slab and bed block to the full width of seating
Construction of RCC slab culvert At Ch 1/0-2/0
Earthwork excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth etc.,
Plain cement concrete 1:4:8 using 40mm ISS HBG metal including cost and conveyance of all materials to site including formwork and centering, labour charges, transporting and placing in position, compacting, finishing and curing, working at depths, Tools etc., complete
Plain cement concrete 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials to site including formwork and centering, labour charges, transporting and placing in position, compacting, finishing and curing, working at depths, Tools etc., complete - Below sill
Plain cement concrete 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials to site including formwork and centering, labour charges, transporting and placing in position, compacting, finishing and curing, working at depths, Tools etc., complete - Above sill
Supplying and fabrication and placing in position mild steel or ribbed tor steel and all reinforced cement concrete works asper the design given including cost of steel and binding wire in all floors etc., complete complying with standard specification.
Supply and Erection and centering of sides and soffits including supports and strutting up to 3.29m height for place surfaces in all floors with all cross bracing using mild steel sheets of size 90cmX60cm and 10 gauge stiffened welded with mild steel angles of size 25mmX3mm for boarding laid over silver oak ( country wood) poists of size 10cm X6.5cm dia spaced at about 90cm centre to center etc., complete complying with standard specification - Sub Structure
Supply and Erection and centering of sides and soffits including supports and strutting up to 3.29m height for place surfaces in all floors with all cross bracing using mild steel sheets of size 90cmX60cm and 10 gauge stiffened welded with mild steel angles of size 25mmX3mm for boarding laid over silver oak ( country wood) poists of size 10cm X6.5cm dia spaced at about 90cm centre to center etc., complete complying with standard specification Super Structure
Plain Cement concrete 1:2:4 using 20mm ISS HBG metal including cost and conveyance of all materials to site including formwork and centering, labour charges, transporting and placing in position, compacting, finishing and curing, working at depths, Tools etc., complete
Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal including cost and conveyance of all materials to site including formwork and centering, labour charges, transporting and placing in position, compacting, finishing and curing, working at depths, Tools etc., complete
Back filling with Earth behind the abutment & inbetween the wings including all labour charges etc., complete
Providing Weep holes in Abutments & wings reinforced CC with 100mm dia AC pipe extending through the full width of the struction with standard specificaito
Provision for Expansion joint inbetween the dirt wall & deck in pier in standard specification
Provision and laying Kraft paper barrying between deck slab and bed block to the full width of seating
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
R SIVALINGAM
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid