Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.2 LAccepted-AOC VILL PO CHINCHURIA BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | 1 | Accepted-AOC Eligible L-1 bidder | |
| 2 | 2₹4.5 L+₹26,220.76 (6.24%)Rejected-Finance CHINCHURIA MORE P O BAHULA DIST PASCHIM BARDHAMAN PIN 713322 W B | BAHULA | PASCHIM BARDHAMAN | WEST BENGAL | 713322 | 2 | Rejected-Finance Quoted more than L-1 bidder | |
| 3 | 3₹5.1 L+₹94,011.76 (22.4%)Rejected-Finance VILL BAHULA C I JAMBAD COLLIERY BAHULA SIDULI ROAD PANDAVESWAR WEST BENGAL INDIA 713322 | PANDAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713322 | 3 | Rejected-Finance Quoted more than L-1 bidder |
Tender Value
₹4.0 L
EMD Value
₹5,000
Closing Date
11 Feb 2023, 5:00 pmClosed
AE EnM
ECL Sonepur Bazari Area
Erection/Diversion of feeder-09 for installation of transformer near dragline view point along F-09 near UCC camp at S.B. Project
2023_ECL_269254_1
GM/SBA/Enm/e-tender/2022-23/ 703
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
ECL Sonepur Bazari Area
please refer tender documents
6 documents required · 6 mandatory
₹5,000
24 Mar 2023
31 Jan 2023
13 Feb 2023
1 Feb 2023
11 Feb 2023
1 Feb 2023
1 Feb 2023 - 4 Feb 2023
Amount
Item Description/ Heading
Material Cost
Material cost for erection 13/16 mtrs long steel tubular pole with cement concrete
Material cost for fabrication, hoisting, erection of phase and earth bracket and painting with red oxide primer
Meterial cost for supply and erection of nuts,bolts febrication and erection of clamps
Meterial cost for supply & installation of 11 KV disc insulator & haedware
Meterial cost for supply & installation of 11 KV pin insulator & haedware
Material cost for supply, fixing and erection of HT stay set complete with stay plate, stay insulator, and stay wire for required dimensions and specification
Material cost for Supply and fixing of 7/14 SWG GI wire for earth continiuity and 6/8 SWG for making and erection of cradle guard
Material cost for stringing of ACSR DOG/WOLF conductor
Material cost for making of chemical earth pit with supply of all required materials
Material cost for installation of transformer.
Material cost for making of drop wire with insulator, bracket clamp etc.
Labour Cost:-
Labour cost for erection 13/16 mtrs long steel tubular pole with cement concrete
Labour cost for fabrication, hoisting, erection of phase and earth bracket and painting with red oxide primer
Meterial cost for supply and erection of nuts,bolts febrication and erection of clamps
Labour cost for installation of 11 KV disc insulator & haedware
Labour cost for installation of 11 KV pin insulator & haedware
Labour cost for fixing and erection of HT stay set complete with stay plate, stay insulator, and stay wire for required dimensions and specification
Labour cost for fixing of 7/14 SWG GI wire for earth continiuity and 6/8 SWG for making and erection of cradle guard
Labour cost for stringing of ACSR DOG/WOLF conductor
Labour cost for making of chemical earth pit with supply of all required materials
Labour cost for installation of transformer.
Labour cost for making of drop wire with insulator, bracket clamp etc.
P. F. amount for labour cost
Total impact of GST for the purpose of CTC
PINAK RANJAN SADHU
BAKSI ENTERPRISE
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_278545.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .