Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.2 LAccepted-AOC 24 25 MANGAL ARCADE TELCO ROAD OPP HOTEL DOUBLE TREE MOHAN NAGAR CHINCHWAD PUNE 411019 | PUNE | MAHARASHTRA | 411019 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹34.0 L+₹1.9 L (5.76%)Rejected-Finance | L2 | Rejected-Finance Second lowest | |
| 3 | L3₹35.1 L+₹2.9 L (8.89%)Rejected-Finance | L3 | Rejected-Finance Third lowest | |
| 4 | L4₹36.1 L+₹3.9 L (12.1%)Rejected-Finance | L4 | Rejected-Finance Fourth lowest | |
| 5 | L5₹38.0 L+₹5.8 L (18.0%)Rejected-Finance | L5 | Rejected-Finance Fifth lowest |
| Sl No | Description | Qty | Unit | metro electrical services L1 | ASHIRWAD ELECTRICALS L8 | M/s.GOODWILL ELECTRICALS L5 | MONA GENERATOR SEVICES PVT. LTD. L7 | M/s. VIJAY ELECTRICALS L4 | DHAIRYASIL RAMAKANT DESAI L6 | L-7 Primewave Communications L9 | star freeze service L2 | SHREE SWASTIK ENTERPRISES L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Supply, install, testing and commissioning of Centrifugal pump sets of capacity 7.5 HP, three phase, 415 Volt suitable for 50mm/80mm dia pipe for suction and delivery head range 30m to 32m, discharge 8 to 16 LPS including provision of suitable PCC foundation for fixing of Pump Sets including taking down exisitng old unserviceable pumpset and depositing to AGE(E/M) Store yard complete all as specified and directed. | 6 | Each Job | 48,000 ₹2,88,000 Lowest | 62,812 ₹3,76,872 | 78,800 ₹4,72,800 | 55,420.94 ₹3,32,525.62 | 68,000 ₹4,08,000 | 95,000 ₹5,70,000 | 63,000 ₹3,78,000 | 80,000 ₹4,80,000 | 88,600 ₹5,31,600 |
| 1.01Note: 1. Standard test certificate for pump and motor has to be submitted by the contractor cost for the same is deemed to be included in the quoted rate. 2. Test results like routine test/Pump performance test/Motor performance/material of construction etc shall be submitted by the contactor after installing the pump sets cost for the same is deemed to be included in the quoted rate. | ||||||||||||
| 2.00 | Supply, install, testing and commissioning of Centrifugal pump sets of capacity 10 HP, three phase, 415 Volt suitable for 50mm/80mm dia pipe for suction and delivery head range 30m to 32m, discharge 15 to 22 LPS including provision of suitable PCC foundation for fixing of Pump Sets including taking down exisitng old unserviceable pumpset and depositing to AGE(E/M) Store yard complete all as specified and directed. | 1 | Each Job | 63,000 ₹63,000 Lowest | 78,720 ₹78,720 | 97,000 ₹97,000 | 69,226.33 ₹69,226.33 | 85,000 ₹85,000 | 1,25,000 ₹1,25,000 | 77,000 ₹77,000 | 1,00,000 ₹1,00,000 | 1,08,350 ₹1,08,350 |
| 2.01Note: 1. Standard test certificate for pump and motor has to be submitted by the contractor cost for the same is deemed to be included in the quoted rate. 2. Test results like routine test/Pump performance test/Motor performance/material of construction etc shall be submitted by the contactor after installing the pump sets cost for the same is deemed to be included in the quoted rate. | ||||||||||||
| 3.00 | Supply, install, testing and commissioning of acoustic proof diesel engine driven generating set, fully wired, 415 Volts, AC, 3 phase 4 wire, 50Hz having capacity 100KW/125 KVA CPCB IV Norms continous rating at power factor 0.8 (lagging) as per IS-4722 and connections as per IE rules complete with liquid cooled 4 stroke Diesel engine with electric start with 12V DC battery, developing minimum 155 BHP at 1500 RPM under NTP prevailing at Sambra area, Belagavi considering derating factor and shall conform to IS:10000/150 3026/BS-5514 with provisions of 10% over loading for 1 hour for every 12 hours running with A1 class governing and all standard safety type, screen protected, revolving field, self excited, self regulated alternator conforming to BSEN-60034 with IP 23 protection complete with integrated AMF control panel with microprocessor based relays/MCCB/MCB's/Contactors, multifunction meter showing KWH, KVA, PF, Amps, Volts, frequency, indicating lamps, 12 Volt battery charging unit including 12 Volts battery etc required asper latest standard engineering practices including sound proof canopy designed to meet MoEF/CPCB Norms of 75 dBA at 1mtr at 75% load, fabricated from CRCA sheet and a structural/sheet metal base frame, with high quality noise absorbent and fire retardant grade acoustic insulation material conformity to IS : 8183 and integrated fuel tank of capacity not less than minimum 8 hrs running fuel filling arrangement from inside duly painted after necessary pre treatment process including necessary PCC platform including taking down exisitng old unserviceable DG set and depositing to AGE(E/M) Store yard complete all as specified and directed. | 1 | Each Job | 16,90,000 ₹16,90,000 | 18,14,800 ₹18,14,800 | 18,50,000 ₹18,50,000 | 16,77,201.53 ₹16,77,201.53 | 17,50,000 ₹17,50,000 | 17,75,000 ₹17,75,000 | 17,95,000 ₹17,95,000 | 14,50,000 ₹14,50,000 Lowest | 16,28,000 ₹16,28,000 |
| 3.01Note: (i) The cost of PCC foundation as per the recommendation of OEM shall be deemed to be included in the quoted rate. (ii) Cost of fuel and other expenses for carrying out acceptance test of the DG set shall deemed to be included with the quoted rate. | ||||||||||||
| 4.00 | Supply, install, testing and commissioning of acoustic proof diesel engine driven generating set, fully wired, 415 Volts, AC, 3 phase 4 wire, 50Hz having capacity 16KW/20KVA CPCB IV Norms continous rating at power factor 0.8 (lagging) as per IS-4722 and connections as per IE rules complete with liquid cooled 4 stroke Diesel engine with electric start with 12V DC battery, developing minimum 24 BHP at 1500 RPM under NTP prevailing at Sambra area, Belagavi considering derating factor and shall conform to IS:10000/150 3026/BS-5514 with provisions of 10% over loading for 1 hour for every 12 hours running with A1 class governing and all standard safety type, screen protected, revolving field, self excited, self regulated alternator conforming to BSEN-60034 with IP 23 protection complete with integrated AMF control panel with microprocessor based relays/MCCB/MCB's/Contactors, multifunction meter showing KWH, KVA, PF, Amps, Volts, frequency, indicating lamps, 12 Volt battery charging unit including 12 Volts battery etc required asper latest standard engineering practices including sound proof canopy designed to meet MoEF/CPCB Norms of 75 dBA at 1mtr at 75% load, fabricated from CRCA sheet and a structural/sheet metal base frame, with high quality noise absorbent and fire retardant grade acoustic insulation material conformity to IS : 8183 and integrated fuel tank of capacity not less than minimum 8 hrs running fuel filling arrangement from inside duly painted after necessary pre treatment process including necessary PCC platform including taking down exisitng old unserviceable DG set and depositing to AGE(E/M) Store yard complete all as specified and directed. | 1 | Each Job | 5,30,000 ₹5,30,000 Lowest | 6,54,200 ₹6,54,200 | 6,80,000 ₹6,80,000 | 6,67,219.64 ₹6,67,219.64 | 6,50,000 ₹6,50,000 | 8,50,000 ₹8,50,000 | 6,80,000 ₹6,80,000 | 6,50,000 ₹6,50,000 | 6,68,000 ₹6,68,000 |
| 4.01Note: (i) The cost of PCC foundation as per the recommendation of OEM shall be deemed to be included in the quoted rate. (ii) Cost of fuel and other expenses for carrying out acceptance test of the DG set shall deemed to be included with the quoted rate. | ||||||||||||
| 5.00 | M&L for cutting /breaking of cement concrete path of any thickness with or without reinforcement for taking up/down of Pipes / Cables and connection and making good to match existing surface by PCC (1:2:4), type B1 (Using 20 mm graded stone aggregates) complete all as specified as directed. | 18 | RM | 1,100 ₹19,800 | 850 ₹15,300 | 800 ₹14,400 | 578.97 ₹10,421.53 | 450 ₹8,100 | 200 ₹3,600 | 180 ₹3,240 Lowest | 600 ₹10,800 | 610 ₹10,980 |
| 6.00 | Taking up Cast iron / GI / MS water main of size 100mm bore including all fittings for spigot and socket ends and lead joints including burning out lead joint and recovering lead complete all as specified as directed. | 33 | RM | 25 ₹825 | 50 ₹1,650 | 20 ₹660 Lowest | 2,158 ₹71,213.86 | 25 ₹825 | 25 ₹825 | 300 ₹9,900 | 45 ₹1,485 | 42 ₹1,386 |
Tender Value
₹39.5 L
EMD Value
₹80,000
Closing Date
4 Oct 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE AF Sambra
GE AF Sambra ATS Sambra Belgaum 591124
REPLACEMENT OF BER EM APPLIANCES AT ATS UNDER GE(AF) SAMBRA
2025_MES_729678_1
GE(AF)/SAM/TOK-34 OF 2025-26
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
GE AF Sambra
Please refer Tender documents
9 documents required · 9 mandatory
₹500
GE AF Sambra
₹80,000
Yes
1 Nov 2025
6 Sept 2025
11 Oct 2025
6 Sept 2025
4 Oct 2025
22 Sept 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .