Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAdmitted-Finance 2 947 NELLAI NAGAR DHARMAPURI | DHARMAPURI | DHARMAPURI | TAMIL NADU | 636701 | ₹2.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.1 Cr+₹5.9 L (2.81%)Admitted-Finance 7 145 MALLIKUNDAM PO MECHARI VIA MALLIKUNDAM VIA METTUR TK SALEM DT | ₹2.1 Cr+₹5.9 L (2.81%) | L2 | Admitted-Finance |
| 3 | L3₹2.5 Cr+₹40.6 L (19.5%)Admitted-Finance MIG 354 4TH CROSS STREET MOGAPPAIR ERI SCHEME CHENNAI 37 | CHENNAI | ₹2.5 Cr+₹40.6 L (19.5%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical OLD NO 36 NEW NO 16 7TH EAST MAIN ROAD GANDHI NAGAR VELLORE 632 006 | VELLORE | VELLORE | TAMIL NADU | 632006 | - | - | Rejected-Technical BQR not satisfied |
| 5 | Rejected-Technical NO 15A NETHAJI NAGAR 8TH STREET ENNORE HIGH ROAD CHENNAI 600057 | CHENNAI | CHENNAI | TAMIL NADU | 600057 | - | - | Rejected-Technical BQR not satisfied |
| Sl No | Description | Qty | Unit | MANICKAVASAGAM L1 | M s Kumaresan and co L2 | ULTRAPOWER BUILDERS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all soils for Foundation with initial lead, lift, etc., complete. Levelling the site | 990 | m3 | - | - | - |
| 2.00 | Earth work excavation in all soils for Foundation with initial lead, lift, etc., complete Hard Gravelly soil | 1,165 | m3 | - | - | - |
| 3.00 | Earth work excavation in all soils for Foundation with initial lead, lift, etc., complete SDR not requiring blasting | 291 | m3 | - | - | - |
| 4.00 | Earth work excavation in all soils for Foundation with initial lead, lift, etc., complete MR & DMR not Requiring blasting | 194 | m3 | - | - | - |
| 5.00 | Earth work excavation in all soils for Foundation with initial lead, lift, etc., complete Hard requiring blasting | 194 | m3 | - | - | - |
| 6.00 | Earth work excavation in all soils for Foundation with initial lead, lift, etc., complete Hard rock requires wedging & chessling | 97 | m3 | - | - | - |
| 7.00 | Supplying and filling with good river sand for foundation including cost of sand, all labour, lead,lift, consolidation etc. complete. | 29 | m3 | - | - | - |
| 8.00 | Plain cement concrete 1:3:6 using 20mm HBG metal for foundation including cost of all materials, labour, lead, lift, etc., complete in all respects. | 385 | m3 | - | - | - |
| 9.00 | RCC 1:1.5:3 using 12 to 20mm HBG metal including cost of all materials, labour, lead, lift, curing, etc., but excluding cost of steel reinforcement complete in all respects. | 280 | m3 | - | - | - |
| 10.00 | RCC 1:1.5:3 using 12 to 20mm HBG metal for works including cost of all materials, form work, shuttering centering mixture, machine vibrating, curing, lead and alift, etc., complete but excluding cost of reinforcement. | 101 | m3 | - | - | - |
Tender Value
₹2.0 Cr
EMD Value
₹2.0 L
Closing Date
28 Nov 2019, 2:30 pmClosed
CE/TP-I/CHN
A-10, Thiru-Vi-Ka-Indl Estate, Guindy, Chennai -32
Providing plinth for 110KV yard, RCC retaining wall, Compound wall with RR masonry and Chain link fencing with Y angle at Sathumadurai
2019_EB_147297_1
TP1-062/2019-20
Open Tender
Civil Works
Works
120 days
Sathumathurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2.0 L
Yes
2 Jan 2020
16 Nov 2019
29 Nov 2019
16 Nov 2019
28 Nov 2019
16 Nov 2019
Amount
Earth work excavation in all soils for Foundation with initial lead, lift, etc., complete. Levelling the site
Earth work excavation in all soils for Foundation with initial lead, lift, etc., complete Hard Gravelly soil
Earth work excavation in all soils for Foundation with initial lead, lift, etc., complete SDR not requiring blasting
Earth work excavation in all soils for Foundation with initial lead, lift, etc., complete MR & DMR not Requiring blasting
Earth work excavation in all soils for Foundation with initial lead, lift, etc., complete Hard requiring blasting
Earth work excavation in all soils for Foundation with initial lead, lift, etc., complete Hard rock requires wedging & chessling
Supplying and filling with good river sand for foundation including cost of sand, all labour, lead,lift, consolidation etc. complete.
Plain cement concrete 1:3:6 using 20mm HBG metal for foundation including cost of all materials, labour, lead, lift, etc., complete in all respects.
RCC 1:1.5:3 using 12 to 20mm HBG metal including cost of all materials, labour, lead, lift, curing, etc., but excluding cost of steel reinforcement complete in all respects.
RCC 1:1.5:3 using 12 to 20mm HBG metal for works including cost of all materials, form work, shuttering centering mixture, machine vibrating, curing, lead and alift, etc., complete but excluding cost of reinforcement.
Plain cement concrete M 15 using 20mm HBG machine crushed metal with form work including cost of all materials, cement, all labour, lead, lift, etc. complete. (Chimney,PCC walls)
Providing shoring and shuttering with country wood scantling at the time of excavation for foundation of towers including cost of all materials, labour, lead, lift, etc. complete.
Providing and placing in position of steel reinforcement for all RCC works for office building and septic tank with labour charges for cutting, bending, tying and binding, placing, etc., including cost of binding wire, steel, etc., complete in all respects.
Dewatering during the earthwork excavation including cost of all material,labour, lead, lift etc.,
Random rubble Masonry in CM 1:5 for compound walls including cost of all materials, curing,lead, lift, etc., complete.
Random rubble Masonry in CM 1:5 for compound walls including cost of all materials, curing,lead, lift, etc., complete. Super Structure
PCC M 15 with 12 to 20mm HBG m/c metal with form work including cost of all materials, cement, all labour, lead, lift, etc. complete.
Plastering with CM 1:5-12mm thick for RR masonry drain including cost of all materials lead lift etc complete.
Plastering with CM 1:3, 12mm thick for RCC works including cost of all materials, curing, labour, lead, lift, scaffolding, etc., complete.
Flush pointing with CM 1:3 for RR Masonry including cost of cement and all materials, labour, lead, lift etc., complete
Colour washing two coats with best quality of cement paint with suitable colour pigments as directed by the engineer including cost of all materials, labour, lead, lift etc., complete
Fabrication and supplying of 56 dia M28 / M20 foundation Bolt and nut of length 1.80m,threading for a length of 15 cm at top and hot dip galvanising of bolt including supply of 2 nos of GI nuts and washers and fixing in the position as directed by the engineer at site including assembling of template etc., cost of template, all material, labour, lead, lift etc., complete
Suplying, fabricating and fixing in position of MS angle 50x50x6mm & 65x65x6mm making Y angle to fix the Chain link fencing including cost of all materials, all labour,lead, lift, etc. and cost of red-oxide primer and two coats of approved enamel paint etc., complete as directed by the engineer at site.
Providing Anchor /Grip rod for foundation in the rock surface with drilling of 40 mm dia holes and fixing of 25 mm dia RTS rod 1.m length inside the holes and 1m length out side the holes with L shape bending including cost of all materials labour lead lift etc complete.
Supply and Fabrication and fixing of template for as per specification and drawing including cost of all materials,labour,lead,lift etc., complete
Labour charges for fixing of Template for as per specification and drawing including cost of all materials,labour,lead,lift etc., complete
Fabriaction, galvanising and supply of foundation bolts of various sizes and nuts with 2 nos. washer in Galvanized Steel including 10 cm L at bottom and 15 cm threading with 2 nuts and washers at top including cost of all materials, labour, lead, lift etc. complete.as directed by the dept. Engineer at site
Suplying and labour for unwinding, laying and tensioning of 7.5x 2.5 cm 10 guage weldmesh fencing to a height of 1.80m as per standard specification and as instructed by the engineer at site including cost of all materials, G.I binding wire, J bolt etc., all labour,lead, lift, etc. complete.
Supplying and labour charges for winding, tensioning and binding with binding wire of GI barbed wire of 6 rows of horizontally as instructed by the engineer at site for fencing including cost of hot dip galvanised 4 fly 12 g barbed wire of all labour, lead, lift etc. complete.,
Fabrication, supplying and erection of M.S. grill for ornamental gate, windows as per standard specification approved by the engineer at site including cost of all materials, welding, painting with two coats of enamel paint over one coat of red oxide primer including cost of all materials, labour, lead, lift, etc. complete.
Engraving the name of Substation over entance wing wall in both Tamil and English using cement plastering and providing borders, colouring with emulsion paints etc., including cost of all material, labour, lead, lift etc., complete
Providing projected border of 10cm width alround the compound wall including cost of all materials,labour,lead,lift etc., complete
Brick work in CM 1:3 using II class chamber burnt bricks for partition wall, including cost of all materials, all labour charges, lead, lift, etc. complete.
Supply and fixing RCC spun pipe NP 3 for road crossing drains wherever necessary including cost of all material, labour for laying, lead, lift, etc., complete as directed by the engineer at site. 600 mm dia
Supply and fixing RCC spun pipe NP 3 for road crossing drains wherever necessary including cost of all material, labour for laying, lead, lift, etc., complete as directed by the engineer at site. 300 mm dia
Supplying and fixing of GI chain link fencing of size 50x50mm using 10 Gauge Galvanised Iron Wire, 1.80m ht including cost of all materials, labour, lead, lift etc.complete and as directed by the Engineer-in-charge at site.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
M s Kumaresan and co
ULTRAPOWER BUILDERS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
BOQ_177303.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .