Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAccepted-AOC | ₹9.9 L | L1 | Accepted-AOC In order |
| 2 | L2₹10.4 L+₹47,615.40 (4.81%)Rejected-Finance | ₹10.4 L+₹47,615.40 (4.81%) | L2 | Rejected-Finance Not in order |
Tender Value
₹10.6 L
EMD Value
₹21,162
Closing Date
30 Jul 2026, 12:00 pmClosed
Executive Engineer Roads Division No 2 MC Chd
Executive Engineer Roads Division No 2 MC Chd
Repair of boundary wall of Community Centre, Sector 33, Chandigarh
2026_MCC_94218_1
2026/R2/115
Open Tender
Civil Works
Percentage
60 days
work
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹21,162
18 Sept 2026
23 Jul 2026
30 Jul 2026
23 Jul 2026
30 Jul 2026
23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling & repair of existing M.S Jaffery including straightening, cutting, welding, and placing in position complete in all respect and to the entire satisfaction of the Engineer-in-charge. (N.S) | 75.61 | Rmt | 310 | ₹23,439.1 |
| 2 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar (DSR 15.7.4) | 68.43 | Cum | 1,468 | ₹1,00,455.24 |
| 3 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kind of soil (DSR 2.8.1) | 84.07 | Cum | 250 | ₹21,017.5 |
| 4 | Providing and laying in position cement concrete 1:5:10 (1 cement : 5 coarse and : 10 graded stone aggregate, mixed with mechanical mixer complete in all respect to the entire satisfaction of the Engineer - in - Charge. (4.1.10) | 8.78 | Cum | 3,830 | ₹33,627.4 |
| 5 | Re-laying old bricks work in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) including cleaning and removal of cement mortar from old bricks complete in all respect to the entire satisfaction of the Engineer - in - Charge. (N.S) | 34.22 | Cum | 3,627 | ₹1,24,115.94 |
| 6 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) (DSR 6.1.1) | 6.73 | Cum | 5,750 | ₹38,697.5 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for foundations, footings, bases of columns, etc. for mass concrete (DSR 5.9.1) | 21.75 | Sqm | 257 | ₹5,589.75 |
| 8 | Centering and shuttering including strutting, propping etc. columns, pillars, piers, Abutments, posts and Struts (DSR 5.9.6) | 83.36 | Sqm | 639 | ₹53,267.04 |
| 9 | Centering and shuttering including strutting, propping etc. lintels, beams, plinth beams, girders, bressumers and cantilevers (DSR 5.9.5) | 69.14 | Sqm | 530 | ₹36,644.2 |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level: 1:1½:3 ( 1 Cement: 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) DSR 4.1.2 | 13.49 | Cum | 6,522 | ₹87,981.78 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 21.76 MB
BOQ_115530.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .