| Sl No | Description | Qty | Unit | A.M.Rajagopal L2 | BALAMURUGAN ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling of RCC Work including all cost of materials and labour charges etc complete as directed. | 2.5 | m3 | 5,500 ₹13,750 | 5,071 ₹12,677.5 Lowest |
| 2.00 | Dismantling of PCC Work including all cost of materials and labour charges etc complete as directed. | 3.5 | m3 | 600 ₹2,100 | 572 ₹2,002 Lowest |
| 3.00 | Conveying the excavated earth from the site to the distance of 15kms out side of the city limit including all initial lead, lift, loading and unloading with transportation charges etc complete as per the direction of departmental officers. | 3 | m3 | 104 ₹312 Lowest | 104 ₹312 Lowest |
| 4.00 | Supply and erecting centering for sides and soffits including supports and strutting upto 3.29m high for plane surfaces such as RCC slabs, Rectangular beems, Tee (or) ECC Beam, Lintel, Bed Block, Staircase waist and landing slabs landing beams, canopy etc., in all floor with all cross bracings using mild steel sheets of size 90cm X 60cm and BG 10 stiffened with welded mild steel angles of size 25mm X 25 X 3mm for boarding laid over country wood joinsts of size 10cm X 6.50 cm spaced at about 90cm C/C and supports by Causrina props of 10cm to 13cm dia spaced at 75cm C/C etc., completed as directed. Sl.No.123 | 17 | m2 | 1,181 ₹20,077 Lowest | 1,181 ₹20,077 Lowest |
| 5.00 | Supply and fabrication of R.T.S. rods in various dia including cutting bending placing in position and tying etc.complete as per the direction of the departmental officer in charges. | 2.5 | Qtl | 9,542 ₹23,855 Lowest | 9,542 ₹23,855 Lowest |
| 6.00 | Reinforced Cement concrete 1:1.5 :3 (one cement, one and half sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 2.5 | m3 | 9,744 ₹24,360 Lowest | 9,744 ₹24,360 Lowest |
| 7.00 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 2.45 | m3 | 5,962 ₹14,606.9 Lowest | 5,962 ₹14,606.9 Lowest |
| 8.00 | Cement concrete 1:2:4 (one cement, two sand and four aggregate) using 20mm hard broken granite stone jelly for all RCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing, finishing etc., complete and also including fixing fan clamps and fixtures in RCC works wherever necessary as directed by departmental officer etc., complete. | 35.5 | m3 | 7,500 ₹2,66,250 | 7,266 ₹2,57,943 Lowest |
| 9.00 | Providing Groove Cutting CC flooring of full depth and filling the depth using Tar including hire of machiners and Tar charge and Labour charges etc complete as per the direction of the depaartmental officer. | 150 | m | 189 ₹28,350 Lowest | 189 ₹28,350 Lowest |
| 10.00 | Chipping of concrete and roughening the surface including cost of machinery and labour charges etc complete as directed. | 350 | m2 | 90 ₹31,500 | 43 ₹15,050 Lowest |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
20 Jan 2026, 3:00 pmClosed
Assisstant Commissioner-West Zone
West Zone, Coimbatore Corporation
Restoration of Cement Concrete Flooring at Muniyappan Kovil Street in Ward no 73 of West Zone
2026_MAWS_642372_18
E8/WESTZONE/2025-26
Open Tender
Civil Works
Works
90 days
West Zone, Coimbatore Corporation
As per the tender document attached
4 documents required · 4 mandatory
₹0
₹5,000
30 Apr 2026
12 Jan 2026
21 Jan 2026
12 Jan 2026
20 Jan 2026
12 Jan 2026
Dismantling of RCC Work including all cost of materials and labour charges etc complete as directed.
Dismantling of PCC Work including all cost of materials and labour charges etc complete as directed.
Conveying the excavated earth from the site to the distance of 15kms out side of the city limit including all initial lead, lift, loading and unloading with transportation charges etc complete as per the direction of departmental officers.
Supply and erecting centering for sides and soffits including supports and strutting upto 3.29m high for plane surfaces such as RCC slabs, Rectangular beems, Tee (or) ECC Beam, Lintel, Bed Block, Staircase waist and landing slabs landing beams, canopy etc., in all floor with all cross bracings using mild steel sheets of size 90cm X 60cm and BG 10 stiffened with welded mild steel angles of size 25mm X 25 X 3mm for boarding laid over country wood joinsts of size 10cm X 6.50 cm spaced at about 90cm C/C and supports by Causrina props of 10cm to 13cm dia spaced at 75cm C/C etc., completed as directed. Sl.No.123
Supply and fabrication of R.T.S. rods in various dia including cutting bending placing in position and tying etc.complete as per the direction of the departmental officer in charges.
Reinforced Cement concrete 1:1.5 :3 (one cement, one and half sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete.
Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification
Cement concrete 1:2:4 (one cement, two sand and four aggregate) using 20mm hard broken granite stone jelly for all RCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing, finishing etc., complete and also including fixing fan clamps and fixtures in RCC works wherever necessary as directed by departmental officer etc., complete.
Providing Groove Cutting CC flooring of full depth and filling the depth using Tar including hire of machiners and Tar charge and Labour charges etc complete as per the direction of the depaartmental officer.
Chipping of concrete and roughening the surface including cost of machinery and labour charges etc complete as directed.
Supply and Fixing of MS Grid for rainwater drain out including all cost of materials and labour charges etc complete as per the direction of the departmental officer in charges.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
Road.pdf
Tender Documents • 0.67 MB
BOQ_769901.xls
BOQ • 0.32 MB
CONDITIONS.pdf
Additional Documents • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .