Loading…
Loading…
Tender Value
₹43.8 L
EMD Value
₹87,608
Closing Date
12 Jun 2026, 10:00 am7d left
DSCO Sri Muktsar Sahib
o/o DSCO Sri Muktsar Sahib
Earth Work for excavation of trenches for laying of underground pipeline lowering and jointing of 400mm 450mm 600mm dia RCC pipes fixing of AVP Risers Construction of Haudies and Pumpstands at District Sri Muktsar Sahib
2026_DOA_169137_1
DSWC/MKS/2026-2027/02
Open Tender
Pipe Laying Works
Shri Muktsar Sahib
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
₹87,608
1 Jun 2026
1 Jun 2026
12 Jun 2026
1 Jun 2026
12 Jun 2026
1 Jun 2026
E-Tender No.:DSWC/MKS/2026-27/02
Earth Work for excavation of Trenches for laying of Under Ground Pipe Line, lowering and jointing of 400 mm, 450mm, 600 mm Dia RCC Piped, fixing of AVP , Risers, Construction of Haudies and Pumpstands Etc. at Village Jandwala, Lambi Maan, Maan Singh Wala , Kandukhera at District Sri Muktsar sahib
Rates for Civil Works (Approved by CCS Punjab Chandigarh)
Name and address of the Contractor/ Bidder
Phone Number of Contractor/ Bidder Email id of Bidder
Total Estimated Amount of Work Rs. 4380398
Quoted by Contractor/ Bidder (As percentage of Estimated Amount) %age (-/+) 0
details of work and cost
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 600 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village Jandwala , Sri Muktsar Sahib (C/o Moga No. 28690 / L etc. ) District Sri Muktsar Sahib
SR.NO. Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
1 Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 7027.2 /m3 93.78 Rupees Ninety Three and Seventy Eight Paise Only
2 Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 3660 /Mtrs 74 Rupees Seventy Four Only
3 Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:1 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 1464 /Joints 338 Rupees Three Hundred Thirty Eight Paise Only
4 Fixing of Risers & Alfa valves with C.C 1:2:4 24 /Riser & Valve 1280.03 Rupees One Thousand two Hundred Eighty and Zero Three Paise Only
5 Fixing of Air vent Pipes with C.C 1:2:4 9 /Air pipe 292.78 Rupees Two Hundred Ninty Two and Seventy Eight Only
6 Jointing of Air vent Pipes 3 /Air pipe 64.33 Rupees Sixty Four and Three three Paise Only
7 Fixing of Pump Stand 7 /number 3638.96 Rupees Three Thousand Six Hundred Thirty Eight and Nine Six Paise only
Estimate of Charges for 7 Pump Stand
8 Earth work in Excavation 56 cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
9 B.B.C 1:8:16 4.2 cum 3921.08 Rupees Three Thousand Nine Hunderd Twenty One and Zero Eight Paise Only
Total Cost for Pump Stand/Riser
Cost of Other Items
10 Sign Board (5' X 3') 1 each 3000 Rupees Three thousand Only 3000
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 600 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village Lambi/Maan , Sri Muktsar Sahib (C/o Moga No. 371220/L etc. ) District Sri Muktsar Sahib
SR.NO. Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
1 Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 4147.2 /m3 93.78 Rupees Ninety Three and Seventy Eight Paise Only
2 Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 2160 /Mtrs 74 Rupees Seventy one Only
3 Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:1 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 864 /Joints 343.27 Rupees Three Hundred forty three and Two Seven Paise Only
4 Fixing of Risers & Alfa valves with C.C 1:2:4 11 /Riser & Valve 714.85 Rupees Seven Hundred Forteen and Eight Five Paise Only
5 Fixing of Air vent Pipes with C.C 1:2:4 9 /Air pipe 293.3 Rupees Two Hundred Ninty Three and Three Zero Paise Only
Estimate of Charges for 7 Haudies
6 Earth work in Excavation 74.06 cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
7 B.B.C 1:8:16 8.81 cum 4221.9 Rupees Four Thousand Two Hunderd Twenty One and Ninty Paise Only
8 Plain Cement Concrete 1:2:4 6.174 cum 5130.81 Rupees Five Thousand One Hunderd Thirty and Eighty One Paise Only
9 First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 37.81 cum 4465.72 Rupees Four Thousand Four Hunderd Sixty Five and Seventy Two Paise Only
10 10.0 mm thick cement plaster work 1:3 241.052 sqm 186.46 Rupees One Hundred Eighty Six and Forty Six Paise Only
Total Cost for Pump Stand/Riser
Cost of Other Items
11 Sign Board (5' X 3') 1 each 3000 Rupees Three thousand Only 3000
12 Recarriage of Pipes 0.5 to 1 KM 435 Per tonne 213.14 Rupees Two Hundred Thirteen and Fourteen Paise Only 92715.9
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 400 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village Maan Singh Wala , Sri Muktsar Sahib (C/o Moga No. 58660 / L etc. ) District Sri Muktsar Sahib
SR. No. Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
1 Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 3887.73 /m3 93.78 Rupees Ninety Three and Seventy Eight Paise Only
2 Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 2618 /Mtrs 71 Rupees Seventy one Only
3 Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:1 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 1048 /Joints 207.93 Rupees Two Hundred Seven and Ninty Three Paise Only
4 Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (riser pipe) 19 /cut 105 Rupees One Hundred Five Only
5 Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (Airvent pipe) 15 /cut 41 Rupees Forty One Only
6 Fixing of Risers & Alfa valves with C.C 1:2:4 19 /Riser & Valve 615.77 Rupees Six Hundred Fifteen and Seventy Five Paise Only
7 Fixing of Air vent Pipes with C.C 1:2:4 15 /Air pipe 290.53 Rupees Two Hundred Ninty and Fifty Three Only
8 Fixing of Pump Stand 4 /number 3613.64 Rupees Three Thousand Six hundred Thirteen and Sixty four Paise Only
Estimate of Charges for 4 Pump Stand
9 Earth work in Excavation 32 cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
10 B.B.C 1:8:16 2.4 cum 3801.35 Rupees Three Thousand Eight Hunderd One and Seventy Eight Paise Only
Total Cost for Pump Stand/Riser
Cost of Other Items
11 Sign Board (5' X 3') 1 each 3000 Rupees Three thousand Only 3000
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 450 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village Kandu Kehra , Sri Muktsar Sahib (C/o Moga No. 37500 / T L etc. ) District Sri Muktsar Sahib 1.08 299.99
SR. No. Item of Work Quantity Unit Rate in (Rupees) Total in Rupees 10.6 42.11
Figure Words 21.18 37.01
1 Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 3364.9 /m3 93.78 Rupees Ninety Three and Seventy Eight Paise Only 0.6 1269.47
2 Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 2090 /Mtrs 71 Rupees Seventy one Only
3 Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:1 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 836 /Joints 238.36 Rupees Two Hundred Seven and Ninty Three Paise Only
4 Fixing of Risers & Alfa valves with C.C 1:2:4 11 /Riser & Valve 961.97 Rupees Six Hundred Fifteen and Seventy Five Paise Only
5 Fixing of Air vent Pipes with C.C 1:2:4 6 /Air pipe 290.22 Rupees Two Hundred Ninty and Fifty Three Only
6 Fixing of Pump Stand 6 /number 3852.64 Rupees Three Thousand Six hundred Thirteen and Sixty four Paise Only
Estimate of Charges for 6 Pump Stand and Haudies
7 Earth work in Excavation 48 cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
8 B.B.C 1:8:16 7.82 cum 3187.11 Rupees Three Thousand Eight Hunderd One and Seventy Eight Paise Only
9 Plain Cement Concrete 1:2:4 2.96 cum 5138.45 Rupees Five Thousand One Hunderd Thirty Eight and Forty Five Paise Only
10 First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 9.06 cum 4463.66 Rupees Four Thousand four Hunderd Sixty Three and Sixty Six Paise Only
11 10.0 mm thick cement plaster work 1:3 102.76 sqm 186.4 Rupees One Hundred Eighty Six and Forty Paise Only
Total Cost for Pump Stand/Riser
Cost of Other Items
12 Sign Board (5' X 3') 1 each 5000 Rupees Three thousand Only
13 Providing and Fixing of Gate Valve 3 each 2092.18 Rupees Two Thousand Ninty Two and Eighteen Paise Only
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
Tendernotice_2.pdf
PDF • 0.03 MB
financialbid.xls
Additional Documents • 0.08 MB
standarddnit.pdf
Tender Documents • 0.47 MB
Download all tender documents and submit your bid