Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.6 LAccepted-Finance 20 GANDHI NAGAR EXTENSION WIMCO NAGAR THIRUVOTTIYUR CHENNAI 600 019 | CHENNAI | CHENNAI | TAMIL NADU | 600019 | ₹12.6 L | L1 | Accepted-Finance Accepted |
| 2 | L2₹13.0 LAccepted-Finance NO 5 8TH STREET KALAINGAR NAGAR THIRUVOTTIYUR CHENNAI 600 019 | CHENNAI | CHENNAI | TAMIL NADU | 600019 | ₹13.0 L | L2 | Accepted-Finance Accepted |
| Sl No | Description | Qty | Unit | KR CONTRACTOR L2 | JAI POWERS L1 |
|---|---|---|---|---|---|
| 1.00 | MS Channel: ISMC 200 x 75 Including Loading, transportation &Unloading.(The material will be supplied by TNPGCL if available at stores during execution of works) | 1.2 | MT | 73,000 ₹87,600 | 71,405 ₹85,686 Lowest |
| 2.00 | MS Channel: ISMC 150 x 75 Including Loading, transportation &Unloading.(The material will be supplied by TNPGCL if available at stores during execution of works) | 6.5 | MT | 73,000 ₹4,74,500 | 71,405 ₹4,64,132.5 Lowest |
| 3.00 | MS Angle: ISA 75 x 75 x 6 Including Loading, transportation &Unloading.(The material will be supplied by TNPGCL if available at stores during execution of works) | 1 | MT | 60,000 ₹60,000 | 59,605 ₹59,605 Lowest |
| 4.00 | Charges for dismantling and removal of existing corroded portion of supporting structure of chilled water header pipe line of ESP all the three units. Including consumables and T&P’s. | 3.5 | MT | 12,000 ₹42,000 | 10,960 ₹38,360 Lowest |
| 5.00 | Charges for leading, lifting & Transportation of supplied iron & steel structural materials from site to workspot. Including special consumables & T&P’s. | 8.2 | MT | 4,200 ₹34,440 | 3,935 ₹32,267 Lowest |
| 6.00 | Charges for Fabrication and erection / Strengthening / renewal of the worn out / corroded supporting structure of chilled water header pipe line of ESP all the three units. Including consumables and T&P’s. | 8.2 | MT | 60,000 ₹4,92,000 | 58,525 ₹4,79,905 Lowest |
| 7.00 | Charges for providing Plain Cement concrete (PCC) 1:4:8 using 12 to 20 mm HBG metal for concrete foundation for columns of structures including cost of all materials, labour, lead, lift, consumables and T&P’s etc., | 3.75 | m3 | 7,500 ₹28,125 | 7,034 ₹26,377.5 Lowest |
| 8.00 | Charges for cleaning and painting of one coat of red oxide and two coat of enamel paint in newly erected structure. Including consumables and T&P’s. | 284 | M2 | 300 ₹85,200 | 276 ₹78,384 Lowest |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
9 Mar 2026, 2:00 pmClosed
SE MI NCTPS1 CH 120
O/o SE MI NCTPS1 CH 120
NCTPS I SE MI circle R M 25 26 MPM Dn Unit I to III AC Plant Strengthening renewal of the worn out corroded ESP chilled water pipe line supporting structure of all the three units by dismantling the worn out structures and removal
2026_EB_665539_1
CE SE MI NCTPS I 303 25 26
Open Tender
Power/Energy Projects/Products
Works
45 days
Works
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹12,000
Yes
30 Jun 2026
24 Feb 2026
10 Mar 2026
24 Feb 2026
9 Mar 2026
24 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | MS Channel: ISMC 200 x 75 Including Loading, transportation &Unloading.(The material will be supplied by TNPGCL if available at stores during execution of works) | 1.2 | MT | - | - |
| 2 | MS Channel: ISMC 150 x 75 Including Loading, transportation &Unloading.(The material will be supplied by TNPGCL if available at stores during execution of works) | 6.5 | MT | - | - |
| 3 | MS Angle: ISA 75 x 75 x 6 Including Loading, transportation &Unloading.(The material will be supplied by TNPGCL if available at stores during execution of works) | 1 | MT | - | - |
| 4 | Charges for dismantling and removal of existing corroded portion of supporting structure of chilled water header pipe line of ESP all the three units. Including consumables and T&P’s. | 3.5 | MT | - | - |
| 5 | Charges for leading, lifting & Transportation of supplied iron & steel structural materials from site to workspot. Including special consumables & T&P’s. | 8.2 | MT | - | - |
| 6 | Charges for Fabrication and erection / Strengthening / renewal of the worn out / corroded supporting structure of chilled water header pipe line of ESP all the three units. Including consumables and T&P’s. | 8.2 | MT | - | - |
| 7 | Charges for providing Plain Cement concrete (PCC) 1:4:8 using 12 to 20 mm HBG metal for concrete foundation for columns of structures including cost of all materials, labour, lead, lift, consumables and T&P’s etc., | 3.75 | m3 | - | - |
| 8 | Charges for cleaning and painting of one coat of red oxide and two coat of enamel paint in newly erected structure. Including consumables and T&P’s. | 284 | M2 | 1 | ₹284 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
BOQ_799357.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].