PR & CC
This tender is floated to carry out the mechanical works at Patalganga Site.
20000946-HD-10157
20000946-HD-10157
Open Tender
Two Bid
Raigad, Maharashtra
₹0
Exempted
4 Mar 2021
11 Feb 2021
4 Mar 2021
4 Mar 2021
11 Feb 2021 - 22 Feb 2021
18 Feb 2021
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | F&E 1/2" SCH 160 SMLS PIPE | F&E 1/2" SCH 160 SMLS PIPE — LAYING OF ABOVE GROUND PIPELINE : LAYING OF A/G PIPELINE- XS, ASTM A 106 GRADE B (SEAMLESS), INSTALLATION OF ABOVE GROUND CARBON STEEL PIPE, ABOVE GROUND PRODUCT PIPING, PIPING WORKS FABRICATION, ERECTION, INSTALLATION AND TESTING OF PIPING, RECEIVING AND TAKING OVER OF ALL HPCL SUPPLIED MATERIAL FROM HPCL DESIGNATED PLACE(S) OF ISSUE, TRANSPORTATION INCLUDING LOADING, UNLOADING, HANDLING FROM HPCL DESIGNATED PLACE(S) OF ISSUE TO CONTRACTOR OWN STOCK YARD(S)/WORK SITE(S)/WORK SHOP(S) INCLUDING ARRANGING ALL NECESSARY STORAGE AREA(S) THERE OF, AS REQUIRED, SUPPLY OF ALL MATERIALS (EXCEPT THOSE SPECIFIED SUBSEQUENTLY IN SOR), EQUIPMENT, MACHINERIES, MANPOWER, CONSUMABLES AS DEFINED IN CONTRACTOR SCOPE OF SUPPLY AND THEIR TRANSPORTATION TO THE WORK SITE(S), PERFORMING ALL ABOVE GROUND PIPING FABRICATION WORKS INCLUDING LAYING, CUTTING, EDGE PREPARATION (INCLUSIVE OF GRINDING THE EDGES OF PIPE, FITTING ETC. TO MATCH WITH THE MATCHING EDGES OF UNEVEN/ DIFFERENT THICKNESS WHEREVER REQUIRED),FIT UP, PREPARATION OF MITER BEND, PRE-HEATING OF PIPES WHEREVER REQUIRED, WELDING, THREADING ETC; ERECTION OF PIPES OF ALL TYPES AND THICKNESS AT ALL HEIGHTS OVER SLEEPER, OVERHEAD ON RACKS, BRIDGES/ BUILDING STRUCTURES AND AT ALL ELEVATIONS; HOOK-UP WITH EQUIPMENT NOZZLES ETC, ERECTION, WELDING OF FITTINGS OF ALL SIZES I.E. ELBOW, REDUCERS, TEES 'O' LET, BLIND FLANGES, SPECTACLE BLINDS, TAPING FOR SAMPLE CONNECTION, VENT AND DRAIN REQUIRED FOR PROCESS AND HYDRO TESTING PURPOSES ETC. CARRYING OUT 20 PERCENTAGE NON-DESTRUCTIVE TESTING OF EACH SIZE SUCH AS RADIOGRAPHY BY GAMMA RAY, 100 PERCENTAGE LIQUID PENETRATION AS DIRECTED; HOOK-UP WITH EXISTING PIPING/PIPELINE INSTALLED AS PER DRAWINGS WHEREVER REQUIRED; CLEANING AND FLUSHING BY WATER/ COMPRESSED AIR, CARRYING OUT HYDROSTATIC TEST AT 30 KG/CM2 (G) (MINIMUM 1.5 TIMES THE DESIGN PRESSURE) ,PNEUMATIC TEST, VALVE FUNCTIONAL TEST AND ANY OTHER TYPE OF TESTING AS SPECIFIED, DEPRESSURIZING, DEWATERING, DRYING BY COMPRESSED AIR IF APPLICABLE; CUTTING/ RE-BEVELING (AS REQUIRED), PRE-COMMISSIONING AND PROVIDING COMMISSIONING ASSISTANCE DURING COMMISSIONING FOR PROCESS PIPING AND COMMISSIONING OF NON-PROCESS PIPING IF APPLICABLE; CLEAN-UP AND RESTORATION OF SITE, PREPARATION OF AS BUILT DRAWINGS, DOCUMENT AND PROJECT RECORD; TRANSPORTATION OF SURPLUS FREE ISSUE MATERIALS TO OWNER DESIGNATED PLACE(S); COMPLETING ALL WORKS IN ALL RESPECTS AS PER THE AFC DRAWING, SPECIFICATIONS, STANDARDS AND OTHER PROVISIONS OF CONTRACT AND INSTRUCTION OF ENGINEER-IN-CHARGE, NOTE: FOR PIPE MATERIAL DETAILS REFER PIPING MATERIAL SPECIFICATION GIVEN IN ATTACHMENT, ALL FITTINGS SHALL BE MEASURED IN RUNNING METER ONLY. LENGTH OF PIPELINE SHALL BE MEASURED UP TO THE NECK OF THE FLANGE ONLY. LENGTH OF FLANGE AND VALVES SHALL NOT BE MEASURED AS THEY SHALL BE PAID UNDER RESPECTIVE ITEM, EXTENT OF TESTS, 1. DP TEST–100 PERCENTAGE, 2. RADI0GRAPHY–20 PERCENTAGE, 3. HYDRO-TEST–100 PERCENTAGE. | - | Running Meter |
| 2 | F&E 3/4" SCH 160 SMLS PIPE | F&E 3/4" SCH 160 SMLS PIPE — LAYING OF ABOVE GROUND PIPELINE : LAYING OF A/G PIPELINE- XS, ASTM A 106 GRADE B (SEAMLESS), INSTALLATION OF ABOVE GROUND CARBON STEEL PIPE, ABOVE GROUND PRODUCT PIPING, PIPING WORKS FABRICATION, ERECTION, INSTALLATION AND TESTING OF PIPING, RECEIVING AND TAKING OVER OF ALL HPCL SUPPLIED MATERIAL FROM HPCL DESIGNATED PLACE(S) OF ISSUE, TRANSPORTATION INCLUDING LOADING, UNLOADING, HANDLING FROM HPCL DESIGNATED PLACE(S) OF ISSUE TO CONTRACTOR OWN STOCK YARD(S)/WORK SITE(S)/WORK SHOP(S) INCLUDING ARRANGING ALL NECESSARY STORAGE AREA(S) THERE OF, AS REQUIRED, SUPPLY OF ALL MATERIALS (EXCEPT THOSE SPECIFIED SUBSEQUENTLY IN SOR), EQUIPMENT, MACHINERIES, MANPOWER, CONSUMABLES AS DEFINED IN CONTRACTOR SCOPE OF SUPPLY AND THEIR TRANSPORTATION TO THE WORK SITE(S), PERFORMING ALL ABOVE GROUND PIPING FABRICATION WORKS INCLUDING LAYING, CUTTING, EDGE PREPARATION (INCLUSIVE OF GRINDING THE EDGES OF PIPE, FITTING ETC. TO MATCH WITH THE MATCHING EDGES OF UNEVEN/ DIFFERENT THICKNESS WHEREVER REQUIRED),FIT UP, PREPARATION OF MITER BEND, PRE-HEATING OF PIPES WHEREVER REQUIRED, WELDING, THREADING ETC; ERECTION OF PIPES OF ALL TYPES AND THICKNESS AT ALL HEIGHTS OVER SLEEPER, OVERHEAD ON RACKS, BRIDGES/ BUILDING STRUCTURES AND AT ALL ELEVATIONS; HOOK-UP WITH EQUIPMENT NOZZLES ETC, ERECTION, WELDING OF FITTINGS OF ALL SIZES I.E. ELBOW, REDUCERS, TEES 'O' LET, BLIND FLANGES, SPECTACLE BLINDS, TAPING FOR SAMPLE CONNECTION, VENT AND DRAIN REQUIRED FOR PROCESS AND HYDRO TESTING PURPOSES ETC. CARRYING OUT 20 PERCENTAGE NON-DESTRUCTIVE TESTING OF EACH SIZE SUCH AS RADIOGRAPHY BY GAMMA RAY, 100 PERCENTAGE LIQUID PENETRATION AS DIRECTED; HOOK-UP WITH EXISTING PIPING/PIPELINE INSTALLED AS PER DRAWINGS WHEREVER REQUIRED; CLEANING AND FLUSHING BY WATER/ COMPRESSED AIR, CARRYING OUT HYDROSTATIC TEST AT 30 KG/CM2 (G) (MINIMUM 1.5 TIMES THE DESIGN PRESSURE) ,PNEUMATIC TEST, VALVE FUNCTIONAL TEST AND ANY OTHER TYPE OF TESTING AS SPECIFIED, DEPRESSURIZING, DEWATERING, DRYING BY COMPRESSED AIR IF APPLICABLE; CUTTING/ RE-BEVELING (AS REQUIRED), PRE-COMMISSIONING AND PROVIDING COMMISSIONING ASSISTANCE DURING COMMISSIONING FOR PROCESS PIPING AND COMMISSIONING OF NON-PROCESS PIPING IF APPLICABLE; CLEAN-UP AND RESTORATION OF SITE, PREPARATION OF AS BUILT DRAWINGS, DOCUMENT AND PROJECT RECORD; TRANSPORTATION OF SURPLUS FREE ISSUE MATERIALS TO OWNER DESIGNATED PLACE(S); COMPLETING ALL WORKS IN ALL RESPECTS AS PER THE AFC DRAWING, SPECIFICATIONS, STANDARDS AND OTHER PROVISIONS OF CONTRACT AND INSTRUCTION OF ENGINEER-IN-CHARGE, NOTE: FOR PIPE MATERIAL DETAILS REFER PIPING MATERIAL SPECIFICATION GIVEN IN ATTACHMENT, ALL FITTINGS SHALL BE MEASURED IN RUNNING METER ONLY. LENGTH OF PIPELINE SHALL BE MEASURED UP TO THE NECK OF THE FLANGE ONLY. LENGTH OF FLANGE AND VALVES SHALL NOT BE MEASURED AS THEY SHALL BE PAID UNDER RESPECTIVE ITEM, EXTENT OF TESTS, 1. DP TEST–100 PERCENTAGE, 2. RADI0GRAPHY–20 PERCENTAGE, 3. HYDRO-TEST–100 PERCENTAGE. | - | Running Meter |
| 3 | F&E 1" SCH XS SMLS PIPE | F&E 1" SCH XS SMLS PIPE — LAYING OF ABOVE GROUND PIPELINE : LAYING OF A/G PIPELINE- XS, ASTM A 106 GRADE B (SEAMLESS), INSTALLATION OF ABOVE GROUND CARBON STEEL PIPE, ABOVE GROUND PRODUCT PIPING, PIPING WORKS FABRICATION, ERECTION, INSTALLATION AND TESTING OF PIPING, RECEIVING AND TAKING OVER OF ALL HPCL SUPPLIED MATERIAL FROM HPCL DESIGNATED PLACE(S) OF ISSUE, TRANSPORTATION INCLUDING LOADING, UNLOADING, HANDLING FROM HPCL DESIGNATED PLACE(S) OF ISSUE TO CONTRACTOR OWN STOCK YARD(S)/WORK SITE(S)/WORK SHOP(S) INCLUDING ARRANGING ALL NECESSARY STORAGE AREA(S) THERE OF, AS REQUIRED, SUPPLY OF ALL MATERIALS (EXCEPT THOSE SPECIFIED SUBSEQUENTLY IN SOR), EQUIPMENT, MACHINERIES, MANPOWER, CONSUMABLES AS DEFINED IN CONTRACTOR SCOPE OF SUPPLY AND THEIR TRANSPORTATION TO THE WORK SITE(S), PERFORMING ALL ABOVE GROUND PIPING FABRICATION WORKS INCLUDING LAYING, CUTTING, EDGE PREPARATION (INCLUSIVE OF GRINDING THE EDGES OF PIPE, FITTING ETC. TO MATCH WITH THE MATCHING EDGES OF UNEVEN/ DIFFERENT THICKNESS WHEREVER REQUIRED),FIT UP, PREPARATION OF MITER BEND, PRE-HEATING OF PIPES WHEREVER REQUIRED, WELDING, THREADING ETC; ERECTION OF PIPES OF ALL TYPES AND THICKNESS AT ALL HEIGHTS OVER SLEEPER, OVERHEAD ON RACKS, BRIDGES/ BUILDING STRUCTURES AND AT ALL ELEVATIONS; HOOK-UP WITH EQUIPMENT NOZZLES ETC, ERECTION, WELDING OF FITTINGS OF ALL SIZES I.E. ELBOW, REDUCERS, TEES 'O' LET, BLIND FLANGES, SPECTACLE BLINDS, TAPING FOR SAMPLE CONNECTION, VENT AND DRAIN REQUIRED FOR PROCESS AND HYDRO TESTING PURPOSES ETC. CARRYING OUT 20 PERCENTAGE NON-DESTRUCTIVE TESTING OF EACH SIZE SUCH AS RADIOGRAPHY BY GAMMA RAY, 100 PERCENTAGE LIQUID PENETRATION AS DIRECTED; HOOK-UP WITH EXISTING PIPING/PIPELINE INSTALLED AS PER DRAWINGS WHEREVER REQUIRED; CLEANING AND FLUSHING BY WATER/ COMPRESSED AIR, CARRYING OUT HYDROSTATIC TEST AT 30 KG/CM2 (G) (MINIMUM 1.5 TIMES THE DESIGN PRESSURE) ,PNEUMATIC TEST, VALVE FUNCTIONAL TEST AND ANY OTHER TYPE OF TESTING AS SPECIFIED, DEPRESSURIZING, DEWATERING, DRYING BY COMPRESSED AIR IF APPLICABLE; CUTTING/ RE-BEVELING (AS REQUIRED), PRE-COMMISSIONING AND PROVIDING COMMISSIONING ASSISTANCE DURING COMMISSIONING FOR PROCESS PIPING AND COMMISSIONING OF NON-PROCESS PIPING IF APPLICABLE; CLEAN-UP AND RESTORATION OF SITE, PREPARATION OF AS BUILT DRAWINGS, DOCUMENT AND PROJECT RECORD; TRANSPORTATION OF SURPLUS FREE ISSUE MATERIALS TO OWNER DESIGNATED PLACE(S); COMPLETING ALL WORKS IN ALL RESPECTS AS PER THE AFC DRAWING, SPECIFICATIONS, STANDARDS AND OTHER PROVISIONS OF CONTRACT AND INSTRUCTION OF ENGINEER-IN-CHARGE, NOTE: FOR PIPE MATERIAL DETAILS REFER PIPING MATERIAL SPECIFICATION GIVEN IN ATTACHMENT, ALL FITTINGS SHALL BE MEASURED IN RUNNING METER ONLY. LENGTH OF PIPELINE SHALL BE MEASURED UP TO THE NECK OF THE FLANGE ONLY. LENGTH OF FLANGE AND VALVES SHALL NOT BE MEASURED AS THEY SHALL BE PAID UNDER RESPECTIVE ITEM, EXTENT OF TESTS, 1. DP TEST–100 PERCENTAGE, 2. RADI0GRAPHY–20 PERCENTAGE, 3. HYDRO-TEST–100 PERCENTAGE. | - | Running Meter |
| 4 | F&E 1.5" SCH 80 SMLS PIPE | F&E 1.5" SCH 80 SMLS PIPE — LAYING OF ABOVE GROUND PIPELINE : LAYING OF A/G PIPELINE- XS, ASTM A 106 GRADE B (SEAMLESS), INSTALLATION OF ABOVE GROUND CARBON STEEL PIPE, ABOVE GROUND PRODUCT PIPING, PIPING WORKS FABRICATION, ERECTION, INSTALLATION AND TESTING OF PIPING, RECEIVING AND TAKING OVER OF ALL HPCL SUPPLIED MATERIAL FROM HPCL DESIGNATED PLACE(S) OF ISSUE, TRANSPORTATION INCLUDING LOADING, UNLOADING, HANDLING FROM HPCL DESIGNATED PLACE(S) OF ISSUE TO CONTRACTOR OWN STOCK YARD(S)/WORK SITE(S)/WORK SHOP(S) INCLUDING ARRANGING ALL NECESSARY STORAGE AREA(S) THERE OF, AS REQUIRED, SUPPLY OF ALL MATERIALS (EXCEPT THOSE SPECIFIED SUBSEQUENTLY IN SOR), EQUIPMENT, MACHINERIES, MANPOWER, CONSUMABLES AS DEFINED IN CONTRACTOR SCOPE OF SUPPLY AND THEIR TRANSPORTATION TO THE WORK SITE(S), PERFORMING ALL ABOVE GROUND PIPING FABRICATION WORKS INCLUDING LAYING, CUTTING, EDGE PREPARATION (INCLUSIVE OF GRINDING THE EDGES OF PIPE, FITTING ETC. TO MATCH WITH THE MATCHING EDGES OF UNEVEN/ DIFFERENT THICKNESS WHEREVER REQUIRED),FIT UP, PREPARATION OF MITER BEND, PRE-HEATING OF PIPES WHEREVER REQUIRED, WELDING, THREADING ETC; ERECTION OF PIPES OF ALL TYPES AND THICKNESS AT ALL HEIGHTS OVER SLEEPER, OVERHEAD ON RACKS, BRIDGES/ BUILDING STRUCTURES AND AT ALL ELEVATIONS; HOOK-UP WITH EQUIPMENT NOZZLES ETC, ERECTION, WELDING OF FITTINGS OF ALL SIZES I.E. ELBOW, REDUCERS, TEES 'O' LET, BLIND FLANGES, SPECTACLE BLINDS, TAPING FOR SAMPLE CONNECTION, VENT AND DRAIN REQUIRED FOR PROCESS AND HYDRO TESTING PURPOSES ETC. CARRYING OUT 20 PERCENTAGE NON-DESTRUCTIVE TESTING OF EACH SIZE SUCH AS RADIOGRAPHY BY GAMMA RAY, 100 PERCENTAGE LIQUID PENETRATION AS DIRECTED; HOOK-UP WITH EXISTING PIPING/PIPELINE INSTALLED AS PER DRAWINGS WHEREVER REQUIRED; CLEANING AND FLUSHING BY WATER/ COMPRESSED AIR, CARRYING OUT HYDROSTATIC TEST AT 30 KG/CM2 (G) (MINIMUM 1.5 TIMES THE DESIGN PRESSURE) ,PNEUMATIC TEST, VALVE FUNCTIONAL TEST AND ANY OTHER TYPE OF TESTING AS SPECIFIED, DEPRESSURIZING, DEWATERING, DRYING BY COMPRESSED AIR IF APPLICABLE; CUTTING/ RE-BEVELING (AS REQUIRED), PRE-COMMISSIONING AND PROVIDING COMMISSIONING ASSISTANCE DURING COMMISSIONING FOR PROCESS PIPING AND COMMISSIONING OF NON-PROCESS PIPING IF APPLICABLE; CLEAN-UP AND RESTORATION OF SITE, PREPARATION OF AS BUILT DRAWINGS, DOCUMENT AND PROJECT RECORD; TRANSPORTATION OF SURPLUS FREE ISSUE MATERIALS TO OWNER DESIGNATED PLACE(S); COMPLETING ALL WORKS IN ALL RESPECTS AS PER THE AFC DRAWING, SPECIFICATIONS, STANDARDS AND OTHER PROVISIONS OF CONTRACT AND INSTRUCTION OF ENGINEER-IN-CHARGE, NOTE: FOR PIPE MATERIAL DETAILS REFER PIPING MATERIAL SPECIFICATION GIVEN IN ATTACHMENT, ALL FITTINGS SHALL BE MEASURED IN RUNNING METER ONLY. LENGTH OF PIPELINE SHALL BE MEASURED UP TO THE NECK OF THE FLANGE ONLY. LENGTH OF FLANGE AND VALVES SHALL NOT BE MEASURED AS THEY SHALL BE PAID UNDER RESPECTIVE ITEM, EXTENT OF TESTS, 1. DP TEST–100 PERCENTAGE, 2. RADI0GRAPHY–20 PERCENTAGE, 3. HYDRO-TEST–100 PERCENTAGE. | - | Running Meter |
| 5 | F&E 2" SCH XS SMLS PIPE | F&E 2" SCH XS SMLS PIPE — LAYING OF ABOVE GROUND PIPELINE : LAYING OF A/G PIPELINE- XS, ASTM A 106 GRADE B (SEAMLESS), INSTALLATION OF ABOVE GROUND CARBON STEEL PIPE, ABOVE GROUND PRODUCT PIPING, PIPING WORKS FABRICATION, ERECTION, INSTALLATION AND TESTING OF PIPING, RECEIVING AND TAKING OVER OF ALL HPCL SUPPLIED MATERIAL FROM HPCL DESIGNATED PLACE(S) OF ISSUE, TRANSPORTATION INCLUDING LOADING, UNLOADING, HANDLING FROM HPCL DESIGNATED PLACE(S) OF ISSUE TO CONTRACTOR OWN STOCK YARD(S)/WORK SITE(S)/WORK SHOP(S) INCLUDING ARRANGING ALL NECESSARY STORAGE AREA(S) THERE OF, AS REQUIRED, SUPPLY OF ALL MATERIALS (EXCEPT THOSE SPECIFIED SUBSEQUENTLY IN SOR), EQUIPMENT, MACHINERIES, MANPOWER, CONSUMABLES AS DEFINED IN CONTRACTOR SCOPE OF SUPPLY AND THEIR TRANSPORTATION TO THE WORK SITE(S), PERFORMING ALL ABOVE GROUND PIPING FABRICATION WORKS INCLUDING LAYING, CUTTING, EDGE PREPARATION (INCLUSIVE OF GRINDING THE EDGES OF PIPE, FITTING ETC. TO MATCH WITH THE MATCHING EDGES OF UNEVEN/ DIFFERENT THICKNESS WHEREVER REQUIRED),FIT UP, PREPARATION OF MITER BEND, PRE-HEATING OF PIPES WHEREVER REQUIRED, WELDING, THREADING ETC; ERECTION OF PIPES OF ALL TYPES AND THICKNESS AT ALL HEIGHTS OVER SLEEPER, OVERHEAD ON RACKS, BRIDGES/ BUILDING STRUCTURES AND AT ALL ELEVATIONS; HOOK-UP WITH EQUIPMENT NOZZLES ETC, ERECTION, WELDING OF FITTINGS OF ALL SIZES I.E. ELBOW, REDUCERS, TEES 'O' LET, BLIND FLANGES, SPECTACLE BLINDS, TAPING FOR SAMPLE CONNECTION, VENT AND DRAIN REQUIRED FOR PROCESS AND HYDRO TESTING PURPOSES ETC. CARRYING OUT 20 PERCENTAGE NON-DESTRUCTIVE TESTING OF EACH SIZE SUCH AS RADIOGRAPHY BY GAMMA RAY, 100 PERCENTAGE LIQUID PENETRATION AS DIRECTED; HOOK-UP WITH EXISTING PIPING/PIPELINE INSTALLED AS PER DRAWINGS WHEREVER REQUIRED; CLEANING AND FLUSHING BY WATER/ COMPRESSED AIR, CARRYING OUT HYDROSTATIC TEST AT 30 KG/CM2 (G) (MINIMUM 1.5 TIMES THE DESIGN PRESSURE) ,PNEUMATIC TEST, VALVE FUNCTIONAL TEST AND ANY OTHER TYPE OF TESTING AS SPECIFIED, DEPRESSURIZING, DEWATERING, DRYING BY COMPRESSED AIR IF APPLICABLE; CUTTING/ RE-BEVELING (AS REQUIRED), PRE-COMMISSIONING AND PROVIDING COMMISSIONING ASSISTANCE DURING COMMISSIONING FOR PROCESS PIPING AND COMMISSIONING OF NON-PROCESS PIPING IF APPLICABLE; CLEAN-UP AND RESTORATION OF SITE, PREPARATION OF AS BUILT DRAWINGS, DOCUMENT AND PROJECT RECORD; TRANSPORTATION OF SURPLUS FREE ISSUE MATERIALS TO OWNER DESIGNATED PLACE(S); COMPLETING ALL WORKS IN ALL RESPECTS AS PER THE AFC DRAWING, SPECIFICATIONS, STANDARDS AND OTHER PROVISIONS OF CONTRACT AND INSTRUCTION OF ENGINEER-IN-CHARGE, NOTE: FOR PIPE MATERIAL DETAILS REFER PIPING MATERIAL SPECIFICATION GIVEN IN ATTACHMENT, ALL FITTINGS SHALL BE MEASURED IN RUNNING METER ONLY. LENGTH OF PIPELINE SHALL BE MEASURED UP TO THE NECK OF THE FLANGE ONLY. LENGTH OF FLANGE AND VALVES SHALL NOT BE MEASURED AS THEY SHALL BE PAID UNDER RESPECTIVE ITEM, EXTENT OF TESTS, 1. DP TEST–100 PERCENTAGE, 2. RADI0GRAPHY–20 PERCENTAGE, 3. HYDRO-TEST–100 PERCENTAGE. | - | Running Meter |
| 6 | F&E 3" SCH STD SMLS PIPE | F&E 3" SCH STD SMLS PIPE — LAYING OF ABOVE GROUND PIPELINE : LAYING OF A/G PIPELINE- XS, ASTM A 106 GRADE B (SEAMLESS), INSTALLATION OF ABOVE GROUND CARBON STEEL PIPE, ABOVE GROUND PRODUCT PIPING, PIPING WORKS FABRICATION, ERECTION, INSTALLATION AND TESTING OF PIPING, RECEIVING AND TAKING OVER OF ALL HPCL SUPPLIED MATERIAL FROM HPCL DESIGNATED PLACE(S) OF ISSUE, TRANSPORTATION INCLUDING LOADING, UNLOADING, HANDLING FROM HPCL DESIGNATED PLACE(S) OF ISSUE TO CONTRACTOR OWN STOCK YARD(S)/WORK SITE(S)/WORK SHOP(S) INCLUDING ARRANGING ALL NECESSARY STORAGE AREA(S) THERE OF, AS REQUIRED, SUPPLY OF ALL MATERIALS (EXCEPT THOSE SPECIFIED SUBSEQUENTLY IN SOR), EQUIPMENT, MACHINERIES, MANPOWER, CONSUMABLES AS DEFINED IN CONTRACTOR SCOPE OF SUPPLY AND THEIR TRANSPORTATION TO THE WORK SITE(S), PERFORMING ALL ABOVE GROUND PIPING FABRICATION WORKS INCLUDING LAYING, CUTTING, EDGE PREPARATION (INCLUSIVE OF GRINDING THE EDGES OF PIPE, FITTING ETC. TO MATCH WITH THE MATCHING EDGES OF UNEVEN/ DIFFERENT THICKNESS WHEREVER REQUIRED),FIT UP, PREPARATION OF MITER BEND, PRE-HEATING OF PIPES WHEREVER REQUIRED, WELDING, THREADING ETC; ERECTION OF PIPES OF ALL TYPES AND THICKNESS AT ALL HEIGHTS OVER SLEEPER, OVERHEAD ON RACKS, BRIDGES/ BUILDING STRUCTURES AND AT ALL ELEVATIONS; HOOK-UP WITH EQUIPMENT NOZZLES ETC, ERECTION, WELDING OF FITTINGS OF ALL SIZES I.E. ELBOW, REDUCERS, TEES 'O' LET, BLIND FLANGES, SPECTACLE BLINDS, TAPING FOR SAMPLE CONNECTION, VENT AND DRAIN REQUIRED FOR PROCESS AND HYDRO TESTING PURPOSES ETC. CARRYING OUT 20 PERCENTAGE NON-DESTRUCTIVE TESTING OF EACH SIZE SUCH AS RADIOGRAPHY BY GAMMA RAY, 100 PERCENTAGE LIQUID PENETRATION AS DIRECTED; HOOK-UP WITH EXISTING PIPING/PIPELINE INSTALLED AS PER DRAWINGS WHEREVER REQUIRED; CLEANING AND FLUSHING BY WATER/ COMPRESSED AIR, CARRYING OUT HYDROSTATIC TEST AT 30 KG/CM2 (G) (MINIMUM 1.5 TIMES THE DESIGN PRESSURE) ,PNEUMATIC TEST, VALVE FUNCTIONAL TEST AND ANY OTHER TYPE OF TESTING AS SPECIFIED, DEPRESSURIZING, DEWATERING, DRYING BY COMPRESSED AIR IF APPLICABLE; CUTTING/ RE-BEVELING (AS REQUIRED), PRE-COMMISSIONING AND PROVIDING COMMISSIONING ASSISTANCE DURING COMMISSIONING FOR PROCESS PIPING AND COMMISSIONING OF NON-PROCESS PIPING IF APPLICABLE; CLEAN-UP AND RESTORATION OF SITE, PREPARATION OF AS BUILT DRAWINGS, DOCUMENT AND PROJECT RECORD; TRANSPORTATION OF SURPLUS FREE ISSUE MATERIALS TO OWNER DESIGNATED PLACE(S); COMPLETING ALL WORKS IN ALL RESPECTS AS PER THE AFC DRAWING, SPECIFICATIONS, STANDARDS AND OTHER PROVISIONS OF CONTRACT AND INSTRUCTION OF ENGINEER-IN-CHARGE, NOTE: FOR PIPE MATERIAL DETAILS REFER PIPING MATERIAL SPECIFICATION GIVEN IN ATTACHMENT, ALL FITTINGS SHALL BE MEASURED IN RUNNING METER ONLY. LENGTH OF PIPELINE SHALL BE MEASURED UP TO THE NECK OF THE FLANGE ONLY. LENGTH OF FLANGE AND VALVES SHALL NOT BE MEASURED AS THEY SHALL BE PAID UNDER RESPECTIVE ITEM, EXTENT OF TESTS, 1. DP TEST–100 PERCENTAGE, 2. RADI0GRAPHY–20 PERCENTAGE, 3. HYDRO-TEST–100 PERCENTAGE. | - | Running Meter |
| 7 | F&E 4" SCH STD SMLS PIPE | F&E 4" SCH STD SMLS PIPE — LAYING OF ABOVE GROUND PIPELINE : LAYING OF A/G PIPELINE- XS, ASTM A 106 GRADE B (SEAMLESS), INSTALLATION OF ABOVE GROUND CARBON STEEL PIPE, ABOVE GROUND PRODUCT PIPING, PIPING WORKS FABRICATION, ERECTION, INSTALLATION AND TESTING OF PIPING, RECEIVING AND TAKING OVER OF ALL HPCL SUPPLIED MATERIAL FROM HPCL DESIGNATED PLACE(S) OF ISSUE, TRANSPORTATION INCLUDING LOADING, UNLOADING, HANDLING FROM HPCL DESIGNATED PLACE(S) OF ISSUE TO CONTRACTOR OWN STOCK YARD(S)/WORK SITE(S)/WORK SHOP(S) INCLUDING ARRANGING ALL NECESSARY STORAGE AREA(S) THERE OF, AS REQUIRED, SUPPLY OF ALL MATERIALS (EXCEPT THOSE SPECIFIED SUBSEQUENTLY IN SOR), EQUIPMENT, MACHINERIES, MANPOWER, CONSUMABLES AS DEFINED IN CONTRACTOR SCOPE OF SUPPLY AND THEIR TRANSPORTATION TO THE WORK SITE(S), PERFORMING ALL ABOVE GROUND PIPING FABRICATION WORKS INCLUDING LAYING, CUTTING, EDGE PREPARATION (INCLUSIVE OF GRINDING THE EDGES OF PIPE, FITTING ETC. TO MATCH WITH THE MATCHING EDGES OF UNEVEN/ DIFFERENT THICKNESS WHEREVER REQUIRED),FIT UP, PREPARATION OF MITER BEND, PRE-HEATING OF PIPES WHEREVER REQUIRED, WELDING, THREADING ETC; ERECTION OF PIPES OF ALL TYPES AND THICKNESS AT ALL HEIGHTS OVER SLEEPER, OVERHEAD ON RACKS, BRIDGES/ BUILDING STRUCTURES AND AT ALL ELEVATIONS; HOOK-UP WITH EQUIPMENT NOZZLES ETC, ERECTION, WELDING OF FITTINGS OF ALL SIZES I.E. ELBOW, REDUCERS, TEES 'O' LET, BLIND FLANGES, SPECTACLE BLINDS, TAPING FOR SAMPLE CONNECTION, VENT AND DRAIN REQUIRED FOR PROCESS AND HYDRO TESTING PURPOSES ETC. CARRYING OUT 20 PERCENTAGE NON-DESTRUCTIVE TESTING OF EACH SIZE SUCH AS RADIOGRAPHY BY GAMMA RAY, 100 PERCENTAGE LIQUID PENETRATION AS DIRECTED; HOOK-UP WITH EXISTING PIPING/PIPELINE INSTALLED AS PER DRAWINGS WHEREVER REQUIRED; CLEANING AND FLUSHING BY WATER/ COMPRESSED AIR, CARRYING OUT HYDROSTATIC TEST AT 30 KG/CM2 (G) (MINIMUM 1.5 TIMES THE DESIGN PRESSURE) ,PNEUMATIC TEST, VALVE FUNCTIONAL TEST AND ANY OTHER TYPE OF TESTING AS SPECIFIED, DEPRESSURIZING, DEWATERING, DRYING BY COMPRESSED AIR IF APPLICABLE; CUTTING/ RE-BEVELING (AS REQUIRED), PRE-COMMISSIONING AND PROVIDING COMMISSIONING ASSISTANCE DURING COMMISSIONING FOR PROCESS PIPING AND COMMISSIONING OF NON-PROCESS PIPING IF APPLICABLE; CLEAN-UP AND RESTORATION OF SITE, PREPARATION OF AS BUILT DRAWINGS, DOCUMENT AND PROJECT RECORD; TRANSPORTATION OF SURPLUS FREE ISSUE MATERIALS TO OWNER DESIGNATED PLACE(S); COMPLETING ALL WORKS IN ALL RESPECTS AS PER THE AFC DRAWING, SPECIFICATIONS, STANDARDS AND OTHER PROVISIONS OF CONTRACT AND INSTRUCTION OF ENGINEER-IN-CHARGE, NOTE: FOR PIPE MATERIAL DETAILS REFER PIPING MATERIAL SPECIFICATION GIVEN IN ATTACHMENT, ALL FITTINGS SHALL BE MEASURED IN RUNNING METER ONLY. LENGTH OF PIPELINE SHALL BE MEASURED UP TO THE NECK OF THE FLANGE ONLY. LENGTH OF FLANGE AND VALVES SHALL NOT BE MEASURED AS THEY SHALL BE PAID UNDER RESPECTIVE ITEM, EXTENT OF TESTS, 1. DP TEST–100 PERCENTAGE, 2. RADI0GRAPHY–20 PERCENTAGE, 3. HYDRO-TEST–100 PERCENTAGE. | - | Running Meter |
| 8 | F&E 6" SCH STD SMLS PIPE | F&E 6" SCH STD SMLS PIPE — LAYING OF ABOVE GROUND PIPELINE : LAYING OF A/G PIPELINE- XS, ASTM A 106 GRADE B (SEAMLESS), INSTALLATION OF ABOVE GROUND CARBON STEEL PIPE, ABOVE GROUND PRODUCT PIPING, PIPING WORKS FABRICATION, ERECTION, INSTALLATION AND TESTING OF PIPING, RECEIVING AND TAKING OVER OF ALL HPCL SUPPLIED MATERIAL FROM HPCL DESIGNATED PLACE(S) OF ISSUE, TRANSPORTATION INCLUDING LOADING, UNLOADING, HANDLING FROM HPCL DESIGNATED PLACE(S) OF ISSUE TO CONTRACTOR OWN STOCK YARD(S)/WORK SITE(S)/WORK SHOP(S) INCLUDING ARRANGING ALL NECESSARY STORAGE AREA(S) THERE OF, AS REQUIRED, SUPPLY OF ALL MATERIALS (EXCEPT THOSE SPECIFIED SUBSEQUENTLY IN SOR), EQUIPMENT, MACHINERIES, MANPOWER, CONSUMABLES AS DEFINED IN CONTRACTOR SCOPE OF SUPPLY AND THEIR TRANSPORTATION TO THE WORK SITE(S), PERFORMING ALL ABOVE GROUND PIPING FABRICATION WORKS INCLUDING LAYING, CUTTING, EDGE PREPARATION (INCLUSIVE OF GRINDING THE EDGES OF PIPE, FITTING ETC. TO MATCH WITH THE MATCHING EDGES OF UNEVEN/ DIFFERENT THICKNESS WHEREVER REQUIRED),FIT UP, PREPARATION OF MITER BEND, PRE-HEATING OF PIPES WHEREVER REQUIRED, WELDING, THREADING ETC; ERECTION OF PIPES OF ALL TYPES AND THICKNESS AT ALL HEIGHTS OVER SLEEPER, OVERHEAD ON RACKS, BRIDGES/ BUILDING STRUCTURES AND AT ALL ELEVATIONS; HOOK-UP WITH EQUIPMENT NOZZLES ETC, ERECTION, WELDING OF FITTINGS OF ALL SIZES I.E. ELBOW, REDUCERS, TEES 'O' LET, BLIND FLANGES, SPECTACLE BLINDS, TAPING FOR SAMPLE CONNECTION, VENT AND DRAIN REQUIRED FOR PROCESS AND HYDRO TESTING PURPOSES ETC. CARRYING OUT 20 PERCENTAGE NON-DESTRUCTIVE TESTING OF EACH SIZE SUCH AS RADIOGRAPHY BY GAMMA RAY, 100 PERCENTAGE LIQUID PENETRATION AS DIRECTED; HOOK-UP WITH EXISTING PIPING/PIPELINE INSTALLED AS PER DRAWINGS WHEREVER REQUIRED; CLEANING AND FLUSHING BY WATER/ COMPRESSED AIR, CARRYING OUT HYDROSTATIC TEST AT 30 KG/CM2 (G) (MINIMUM 1.5 TIMES THE DESIGN PRESSURE) ,PNEUMATIC TEST, VALVE FUNCTIONAL TEST AND ANY OTHER TYPE OF TESTING AS SPECIFIED, DEPRESSURIZING, DEWATERING, DRYING BY COMPRESSED AIR IF APPLICABLE; CUTTING/ RE-BEVELING (AS REQUIRED), PRE-COMMISSIONING AND PROVIDING COMMISSIONING ASSISTANCE DURING COMMISSIONING FOR PROCESS PIPING AND COMMISSIONING OF NON-PROCESS PIPING IF APPLICABLE; CLEAN-UP AND RESTORATION OF SITE, PREPARATION OF AS BUILT DRAWINGS, DOCUMENT AND PROJECT RECORD; TRANSPORTATION OF SURPLUS FREE ISSUE MATERIALS TO OWNER DESIGNATED PLACE(S); COMPLETING ALL WORKS IN ALL RESPECTS AS PER THE AFC DRAWING, SPECIFICATIONS, STANDARDS AND OTHER PROVISIONS OF CONTRACT AND INSTRUCTION OF ENGINEER-IN-CHARGE, NOTE: FOR PIPE MATERIAL DETAILS REFER PIPING MATERIAL SPECIFICATION GIVEN IN ATTACHMENT, ALL FITTINGS SHALL BE MEASURED IN RUNNING METER ONLY. LENGTH OF PIPELINE SHALL BE MEASURED UP TO THE NECK OF THE FLANGE ONLY. LENGTH OF FLANGE AND VALVES SHALL NOT BE MEASURED AS THEY SHALL BE PAID UNDER RESPECTIVE ITEM, EXTENT OF TESTS, 1. DP TEST–100 PERCENTAGE, 2. RADI0GRAPHY–20 PERCENTAGE, 3. HYDRO-TEST–100 PERCENTAGE. | - | Running Meter |
| 9 | F&E 8" SCH STD SMLS PIPE | F&E 8" SCH STD SMLS PIPE — LAYING OF ABOVE GROUND PIPELINE : LAYING OF A/G PIPELINE- XS, ASTM A 106 GRADE B (SEAMLESS), INSTALLATION OF ABOVE GROUND CARBON STEEL PIPE, ABOVE GROUND PRODUCT PIPING, PIPING WORKS FABRICATION, ERECTION, INSTALLATION AND TESTING OF PIPING, RECEIVING AND TAKING OVER OF ALL HPCL SUPPLIED MATERIAL FROM HPCL DESIGNATED PLACE(S) OF ISSUE, TRANSPORTATION INCLUDING LOADING, UNLOADING, HANDLING FROM HPCL DESIGNATED PLACE(S) OF ISSUE TO CONTRACTOR OWN STOCK YARD(S)/WORK SITE(S)/WORK SHOP(S) INCLUDING ARRANGING ALL NECESSARY STORAGE AREA(S) THERE OF, AS REQUIRED, SUPPLY OF ALL MATERIALS (EXCEPT THOSE SPECIFIED SUBSEQUENTLY IN SOR), EQUIPMENT, MACHINERIES, MANPOWER, CONSUMABLES AS DEFINED IN CONTRACTOR SCOPE OF SUPPLY AND THEIR TRANSPORTATION TO THE WORK SITE(S), PERFORMING ALL ABOVE GROUND PIPING FABRICATION WORKS INCLUDING LAYING, CUTTING, EDGE PREPARATION (INCLUSIVE OF GRINDING THE EDGES OF PIPE, FITTING ETC. TO MATCH WITH THE MATCHING EDGES OF UNEVEN/ DIFFERENT THICKNESS WHEREVER REQUIRED),FIT UP, PREPARATION OF MITER BEND, PRE-HEATING OF PIPES WHEREVER REQUIRED, WELDING, THREADING ETC; ERECTION OF PIPES OF ALL TYPES AND THICKNESS AT ALL HEIGHTS OVER SLEEPER, OVERHEAD ON RACKS, BRIDGES/ BUILDING STRUCTURES AND AT ALL ELEVATIONS; HOOK-UP WITH EQUIPMENT NOZZLES ETC, ERECTION, WELDING OF FITTINGS OF ALL SIZES I.E. ELBOW, REDUCERS, TEES 'O' LET, BLIND FLANGES, SPECTACLE BLINDS, TAPING FOR SAMPLE CONNECTION, VENT AND DRAIN REQUIRED FOR PROCESS AND HYDRO TESTING PURPOSES ETC. CARRYING OUT 20 PERCENTAGE NON-DESTRUCTIVE TESTING OF EACH SIZE SUCH AS RADIOGRAPHY BY GAMMA RAY, 100 PERCENTAGE LIQUID PENETRATION AS DIRECTED; HOOK-UP WITH EXISTING PIPING/PIPELINE INSTALLED AS PER DRAWINGS WHEREVER REQUIRED; CLEANING AND FLUSHING BY WATER/ COMPRESSED AIR, CARRYING OUT HYDROSTATIC TEST AT 30 KG/CM2 (G) (MINIMUM 1.5 TIMES THE DESIGN PRESSURE) ,PNEUMATIC TEST, VALVE FUNCTIONAL TEST AND ANY OTHER TYPE OF TESTING AS SPECIFIED, DEPRESSURIZING, DEWATERING, DRYING BY COMPRESSED AIR IF APPLICABLE; CUTTING/ RE-BEVELING (AS REQUIRED), PRE-COMMISSIONING AND PROVIDING COMMISSIONING ASSISTANCE DURING COMMISSIONING FOR PROCESS PIPING AND COMMISSIONING OF NON-PROCESS PIPING IF APPLICABLE; CLEAN-UP AND RESTORATION OF SITE, PREPARATION OF AS BUILT DRAWINGS, DOCUMENT AND PROJECT RECORD; TRANSPORTATION OF SURPLUS FREE ISSUE MATERIALS TO OWNER DESIGNATED PLACE(S); COMPLETING ALL WORKS IN ALL RESPECTS AS PER THE AFC DRAWING, SPECIFICATIONS, STANDARDS AND OTHER PROVISIONS OF CONTRACT AND INSTRUCTION OF ENGINEER-IN-CHARGE, NOTE: FOR PIPE MATERIAL DETAILS REFER PIPING MATERIAL SPECIFICATION GIVEN IN ATTACHMENT, ALL FITTINGS SHALL BE MEASURED IN RUNNING METER ONLY. LENGTH OF PIPELINE SHALL BE MEASURED UP TO THE NECK OF THE FLANGE ONLY. LENGTH OF FLANGE AND VALVES SHALL NOT BE MEASURED AS THEY SHALL BE PAID UNDER RESPECTIVE ITEM, EXTENT OF TESTS, 1. DP TEST–100 PERCENTAGE, 2. RADI0GRAPHY–20 PERCENTAGE, 3. HYDRO-TEST–100 PERCENTAGE. | - | Running Meter |
| 10 | F&E 10" SCH STD SMLS PIPE | F&E 10" SCH STD SMLS PIPE — LAYING OF ABOVE GROUND PIPELINE : LAYING OF A/G PIPELINE- XS, ASTM A 106 GRADE B (SEAMLESS), INSTALLATION OF ABOVE GROUND CARBON STEEL PIPE, ABOVE GROUND PRODUCT PIPING, PIPING WORKS FABRICATION, ERECTION, INSTALLATION AND TESTING OF PIPING, RECEIVING AND TAKING OVER OF ALL HPCL SUPPLIED MATERIAL FROM HPCL DESIGNATED PLACE(S) OF ISSUE, TRANSPORTATION INCLUDING LOADING, UNLOADING, HANDLING FROM HPCL DESIGNATED PLACE(S) OF ISSUE TO CONTRACTOR OWN STOCK YARD(S)/WORK SITE(S)/WORK SHOP(S) INCLUDING ARRANGING ALL NECESSARY STORAGE AREA(S) THERE OF, AS REQUIRED, SUPPLY OF ALL MATERIALS (EXCEPT THOSE SPECIFIED SUBSEQUENTLY IN SOR), EQUIPMENT, MACHINERIES, MANPOWER, CONSUMABLES AS DEFINED IN CONTRACTOR SCOPE OF SUPPLY AND THEIR TRANSPORTATION TO THE WORK SITE(S), PERFORMING ALL ABOVE GROUND PIPING FABRICATION WORKS INCLUDING LAYING, CUTTING, EDGE PREPARATION (INCLUSIVE OF GRINDING THE EDGES OF PIPE, FITTING ETC. TO MATCH WITH THE MATCHING EDGES OF UNEVEN/ DIFFERENT THICKNESS WHEREVER REQUIRED),FIT UP, PREPARATION OF MITER BEND, PRE-HEATING OF PIPES WHEREVER REQUIRED, WELDING, THREADING ETC; ERECTION OF PIPES OF ALL TYPES AND THICKNESS AT ALL HEIGHTS OVER SLEEPER, OVERHEAD ON RACKS, BRIDGES/ BUILDING STRUCTURES AND AT ALL ELEVATIONS; HOOK-UP WITH EQUIPMENT NOZZLES ETC, ERECTION, WELDING OF FITTINGS OF ALL SIZES I.E. ELBOW, REDUCERS, TEES 'O' LET, BLIND FLANGES, SPECTACLE BLINDS, TAPING FOR SAMPLE CONNECTION, VENT AND DRAIN REQUIRED FOR PROCESS AND HYDRO TESTING PURPOSES ETC. CARRYING OUT 20 PERCENTAGE NON-DESTRUCTIVE TESTING OF EACH SIZE SUCH AS RADIOGRAPHY BY GAMMA RAY, 100 PERCENTAGE LIQUID PENETRATION AS DIRECTED; HOOK-UP WITH EXISTING PIPING/PIPELINE INSTALLED AS PER DRAWINGS WHEREVER REQUIRED; CLEANING AND FLUSHING BY WATER/ COMPRESSED AIR, CARRYING OUT HYDROSTATIC TEST AT 30 KG/CM2 (G) (MINIMUM 1.5 TIMES THE DESIGN PRESSURE) ,PNEUMATIC TEST, VALVE FUNCTIONAL TEST AND ANY OTHER TYPE OF TESTING AS SPECIFIED, DEPRESSURIZING, DEWATERING, DRYING BY COMPRESSED AIR IF APPLICABLE; CUTTING/ RE-BEVELING (AS REQUIRED), PRE-COMMISSIONING AND PROVIDING COMMISSIONING ASSISTANCE DURING COMMISSIONING FOR PROCESS PIPING AND COMMISSIONING OF NON-PROCESS PIPING IF APPLICABLE; CLEAN-UP AND RESTORATION OF SITE, PREPARATION OF AS BUILT DRAWINGS, DOCUMENT AND PROJECT RECORD; TRANSPORTATION OF SURPLUS FREE ISSUE MATERIALS TO OWNER DESIGNATED PLACE(S); COMPLETING ALL WORKS IN ALL RESPECTS AS PER THE AFC DRAWING, SPECIFICATIONS, STANDARDS AND OTHER PROVISIONS OF CONTRACT AND INSTRUCTION OF ENGINEER-IN-CHARGE, NOTE: FOR PIPE MATERIAL DETAILS REFER PIPING MATERIAL SPECIFICATION GIVEN IN ATTACHMENT, ALL FITTINGS SHALL BE MEASURED IN RUNNING METER ONLY. LENGTH OF PIPELINE SHALL BE MEASURED UP TO THE NECK OF THE FLANGE ONLY. LENGTH OF FLANGE AND VALVES SHALL NOT BE MEASURED AS THEY SHALL BE PAID UNDER RESPECTIVE ITEM, EXTENT OF TESTS, 1. DP TEST–100 PERCENTAGE, 2. RADI0GRAPHY–20 PERCENTAGE, 3. HYDRO-TEST–100 PERCENTAGE. | - | Running Meter |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
20000946-HD-10157.pdf
TENDER_DOCUMENT • 16.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .