Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.2 LAccepted-AOC | ₹26.2 L | L1 | Accepted-AOC Responsive Bidder L1 |
| 2 | L2₹35.5 L+₹9.3 L (35.7%)Rejected-Finance BASHAT CHENANI TEH CHENANI DISTT UDHAMPUR | UDHAMPUR | JAMMU AND KASHMIR | 182101 | ₹35.5 L+₹9.3 L (35.7%) | L2 | Rejected-Finance Non Responsive Bidder |
Tender Value
₹48 L
EMD Value
₹96,000
Closing Date
2 May 2026, 2:00 pmClosed
PMGSY Division Udhampur
PMGSY DIVISION UDHAMPUR- I UDHAMPUR
Permanent Restoration on road from Nagulta to Razar Pkg No JK14 272
2026_JKRRD_147338_2
e-nit 67 Permanent Restoration
Open Tender
Civil Works - Roads
Percentage
60 days
PMGSY Division Chenani
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹96,000
15 Jun 2026
21 Apr 2026
4 May 2026
21 Apr 2026
2 May 2026
21 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Earth work in Trench excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil.70%, Ordnary Rock 20%, Hard Rock 10% (Blasting probhitted). | - | Cum | - | - |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | - | Cum | - | - |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| - | Polygonal/Random Rubble Masonry uncoursed brought to course in 1:6 fine sand mortar in foundation and plinth with Cement mortar 1:6 (1 Cement : 6 coarse sand) | - | Cum | - | - |
| - | Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone | - | Cum | - | - |
| - | Providing and making Gabbion structure with mechnically woven double twisted hexagonal wire mesh gabion boxes as per IS 16014 2012 Morth mesh type 10*12 D=100mm with tolerance of + -2percent zinc coated mesh wire dia 3.0 mm | - | Cum | - | - |
| - | Back filling(Stone filling) behind R/Wall, abutment, wing wall etc (exluding cost of Stone) | - | Cum | - | - |
| - | Earth filling of available earth (exluding rock with consilidation) | - | Cum | - | - |
| - | Providing /Laying plain/reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation protection work, backfilling concrete and masonry works in head walls and parapets (1000mm dia) | - | RMT | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.68 MB
BOQ_229671.xls
BOQ • 0.31 MB
cor677777.pdf
PDF • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .