Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹17.5 L+₹1,352.46 (0.08%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Sarathi L1 | N D ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water etc., in SDR Soil- 1st depth | 6.48 | cum | 122.05 ₹790.88 Lowest | 124.64 ₹807.67 |
| 2.00 | Collection and supply of gritty gravel from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 227.25 | cum | 247.05 ₹56,142.11 Lowest | 248.64 ₹56,503.44 |
| 3.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. | 153.07 | cum | 5,036.04 ₹7,70,866.64 Lowest | 5,040 ₹7,71,472.8 |
| 4.00 | Cement concrete 1 :2: 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. | 98.53 | cum | 6,416.25 ₹6,32,193.11 Lowest | 6,417.39 ₹6,32,305.44 |
| 5.00 | Supplying & Erecting centering for sides & soffits including necessary supports & strutting up to 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casuarinas props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for the following items | 57.6 | cum | 170.64 ₹9,828.86 Lowest | 171.5 ₹9,878.4 |
| 6.00 | Provision for bitumen Pad including All Charges etc., complete. | 1 | sqm | 15,000 ₹15,000 Lowest | 15,000 ₹15,000 Lowest |
| 7.00 | GST 18% | 1 | No | 2,67,267.89 ₹2,67,267.89 Lowest | 2,67,474.2 ₹2,67,474.2 |
Tender Value
Refer Docs
EMD Value
₹17,700
Closing Date
4 Sept 2025, 3:00 pmClosed
Block Development officer,Walajah
Block Development office,Walajah
Providing CC Pavement at sengadu near Bus stand H/O Sengadu Panchayat
2025_RDTN_598893_1
A1/001/2025
Open Tender
Civil Works
Works
30 days
Block Development office, Walajah
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹17,700
17 Nov 2025
30 Aug 2025
4 Sept 2025
30 Aug 2025
4 Sept 2025
30 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_715846.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .