Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-Finance | ₹1.6 L | L1 | Accepted-Finance L1 |
| 2 | L2₹1.7 LRejected-Finance | ₹1.7 L | L2 | Rejected-Finance L2 |
| 3 | L3₹1.7 LRejected-Finance SIDDIM KAFFER KALIMPONG 734314 | KALIMPONG | KALIMPONG | WEST BENGAL | 734314 | ₹1.7 L | L3 | Rejected-Finance L3 |
Tender Value
₹1.6 L
EMD Value
₹3,300
Closing Date
15 Jan 2026, 6:30 pmClosed
PRADHAN, PAIYONG GRAM PANCHAYAT
OFFICE OF THE PRADHAN PAIYONG GRAM PANCHAYAT
THE CONSTRUCTION OF IRRIGATION CANAL FROM BASHGHARI JHORA TOWARDS SHIVA KUMAR LAND, SANSAD-III, PAIYONG G.P, LAVA DEVELOPMENT BLOCK, UNDER KALIMPONG DISTRICT. (15TH CFC TIED) 2025-26
2025_GTA_978628_4
04/PGP/15TH CFC 2025-2026
Open Tender
CIVIL WORKS
45 days
PAIYONG
Please refer Tender documents.
2 documents required · 2 mandatory
₹250
₹3,300
Yes
2 Feb 2026
23 Dec 2025
19 Jan 2026
24 Dec 2025
15 Jan 2026
24 Dec 2025
Earthwork in excavation of foundation trenches or drains in all sorts of soils(Including mixed soils but excluding laterite or sandstone), including removing, spreading or stacking the spoils within a lead of 75 m as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
(A) Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming and preparing the bed to proper level and filling up all joints with sandy clay or earth.
(B) Cost of Boulders
Cement Concrete with graded stone chips(30 mm size excluding shuttering in ground floor and foundation
Hire labour charges for Shuttering with hard wood for precast RC Slab curved or straight, and striking out the same including fitting, fixing the precast slab in position with necessary carriage and haulage, hosting etc. complete in all respect. (Only the area in contact to concrete to be measured)
Plaster to (wall floor ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and racking out joints including throating, nosing and drip course scaffolding /staging, where necessary (Ground floor). Excluding cost of chipping over concrete surface.
Neat cement punning about 1.50mm thick in wall ,dado,window sill,floor etc.
Plum Concrete work with 40% cememt Concrete with 30mm down graded stone metal and 60 % of stone boulder of size 150 mm and above,placed in position as directed excluding shuttering if any
Add 18% GST
Labour cess @1%
Please Enable Macros to View BoQ information
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.92 MB
BOQ_2385165.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid