Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
5 Oct 2026, 4:00 pm
Executive Engineer
R and B Division Karan Nagar Srinagar
Construction of 1x25M Span with CWW 2M Foot Bridge at Downstream of Darish Kadal Bridge.
2026_PWDJK_325190_1
etendering NIT 38 Karan Nagar Srinagar
Open Tender
Civil Works
Percentage
180 days
Darish Kadal
MOU as per eNIT
4 documents required · 4 mandatory
₹2,600
Executive Engineer
₹2.8 L
18 Sept 2026
18 Sept 2026
6 Oct 2026
18 Sept 2026
5 Oct 2026
18 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil Part | |||||
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil : | 541.01 | Cum | 187.3 | ₹1,01,331.17 |
| 3 | Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material All kinds of soil : | 541.01 | cum | 89.75 | ₹48,555.65 |
| 4 | Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like (by enngaging 4" dia Dewatering pump) | 1,352.52 | Kl | 167.8 | ₹2,26,952.86 |
| 5 | Filling available excavated earth (excluding rock) in trenches etc. after completion of Piling, Pile Cap & abut Shaft concreting to form Embankment slope as/details including disposal of excess as per the direction of Engineer Incharge. etc. in layers, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 444.15 | Cum | 218.4 | ₹97,002.36 |
| 6 | Boring, providing and installing bored cast-in-situ reinforced cement concrete pile of specified grade concrete mix, diameter and length below the pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embeded in the pile cap etc. all complete including removal of excavated earth with all lifts and leads(Length of pile for payment Shall be measured from top of shoe to the bottom of pile cap) By percussion drilling using Direct mud circulation (DMC) or Bailer and chisel technique by tripod and mechanical Winch Machine all complete,600 mm dia piles M-30 | 192 | Rm | 3,123.1 | ₹5,99,635.2 |
| 7 | Providing & laying of stone soling hand packed in foundation and plinth including ramming, watering, compaction & lead lifts all carriages upto site of work complete job; All inclusive. | 31.88 | Cum | 950 | ₹30,286 |
| 8 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with. 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 31.88 | Cum | 7,504.6 | ₹2,39,246.65 |
| 9 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-incharge. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately. All works upto plinth level including Extra for providing richer mixes at all floor levels. Note:- Excess/ less cement over the specified cement content used is payable/ recoverable separately. Providing M-30 grade concrete instead of M-25 grade BMC/RMC | 46.8 | Cum | 8,119.9 | ₹3,80,011.32 |
| 10 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-incharge. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately. All works above plinth level upto floor V level | 117.16 | Cum | 9,412.05 | ₹11,02,715.78 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.64 MB
BOQ_1098169.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .