Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹20.6 L+₹4,090.74 (0.20%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹20.7 L+₹22,048.16 (1.07%)Rejected-Finance 2 283B V O C NAGAR SUTHAMALLI TIRUNELVELI DISTRICT | TIRUNELVELI | TAMIL NADU | 627001 | L3 | Rejected-Finance L3 | |
| 4 | L4₹21.8 L+₹1.3 L (6.34%)Rejected-Finance | L4 | Rejected-Finance L4 |
Tender Value
₹21 L
EMD Value
₹21,000
Closing Date
12 Mar 2024, 3:00 pmClosed
Project Director
DRDA, Tirunelveli
Permanent Restoration by Constructing Road and culvert in Manur Block
2024_RDTN_442245_4
A4/819/tender/2024 flood
Open Tender
Civil Works
Item Rate
120 days
Tirunelveli
As per technical bid document
4 documents required · 4 mandatory
₹0
₹21,000
DRDA, Tirunelveli
28 Jun 2024
6 Mar 2024
12 Mar 2024
6 Mar 2024
12 Mar 2024
7 Mar 2024
7 Mar 2024
Amount
1) Permanent Restoration by Strengthening of Suthamalli Thiruvalluvar Nagar Sathiya Nagar Road Km 0/0 - 0/550 in Manur Block
Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., compelte. SS 20 A Km 0/0-0/550
Providing and Laying Grittyh Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete. Km 0/0-0/550
Picking the existing surface to 50mm to 100mmthick including labour and hire charges for picking tools and ploants and all other incidental charges etc complete as per standard specifications Km 0/0-0/550
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Km 0/0-0/550
Providing and laying prime coat over WMM surface (treated with primer) using7.00 Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat by bitumen sprayer Km 0/0-0/550
Providing and laying Tack coat over WMM surface (treated with primer) using 2.50 Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat by bitumen sprayer Km 0/0-0/550
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18 cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.6 kg of bitumen for 10 sqm of premix carpet including laying of seal coat type A over the premix carpet using 0.09 cum of 6.7 mm IRC size HBG machine crushed chips with 9.8 kg of 60/70 grade bitumen per 10 sqm including cost and conveyance of chips and stacking them to departmental gauge for premeasurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including spreading the same and finishing and compacting the same by vibrator rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and vibrator rolling seperately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for CMP vibrator roller 80-100 KN capacity and all incidental charges etc., complete. (Using Paver Finisher & Vibrator Roller) Km 0/0 -0/550
Construction of Deck Slab Culvert 1.5m Span @ CH 660m
Earth work excavation in all clauses of soil with initial lead and lift except hard rock requiring blasting as per SS 20B for foundation etc., complete.
Cement concrete 1:4:8 mix using 40m ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete.
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete.
Centering charges for all concrete works including all cost and conveyance of all materials and all labour charges etc., complete.
Supplying, Fabricating and placing in position of MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with standard specification.
Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete.
2) Permanent Restoration by construction of 1.50 m span Culvert at Chittankudiyiruppu Road in Thenpathu pt in Manur Block
Earth work excavation in all clauses of soil with initial lead and lift except hard rock requiring blasting as per SS 20B for foundation etc., complete.
Cement concrete 1:4:8 mix using 40m ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete.
Centering charges for all concrete works including all cost and conveyance of all materials and all labour charges etc., complete.
For Shuttering - Below Sill Level
For Shuttering - Above Sill Level
For Deck Slab Centering
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete.
Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete.
Supplying, Fabricating and placing in position of MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with standard specification.
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete.
Supplying and filling with excavated earth inclduding all cost and conveyance and all labour charges for watering, ramming etc. complet
Provision for 75mm dia PVC pipe for weep holes
Provision for Bitumen for tar pad
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
S.NAVANEETHAKRISHNAN
SUBBULAKSHMI
M MOHAMMED HAKKIM
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_526471.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .