| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.1 LAccepted-AOC | ₹30.1 L | L1 | Accepted-AOC Eligible |
| 2 | L2₹41.0 LRejected-AOC 6 U 34 JAWAHAR NAGAR SRI GANGANAGAR SRI GANGANAGAR RAJASTHAN 335001 | GANGANAGAR | RAJASTHAN | 335001 | ₹41.0 L | L2 | Rejected-AOC Not eligible |
| 3 | L3₹42.6 LRejected-AOC | ₹42.6 L | L3 | Rejected-AOC Not eligible |
| Sl No | Description | Qty | Unit | Ram Parkash Constructions Pvt. Ltd. L1 | m/s gaurav enterprises L3 | Ankit Jindal And Company L2 |
|---|---|---|---|---|---|---|
| 1.00 | M&L for Repairs to pot holes exceeding 30 mm depth,area not exceeding 1.00 Sqm each including sweeping free from dust and mud, or water scoring sunken surfaces in roads, paths etc cutting around edges to at least 25 mm depth, making good by applying tack coat with bituminous primer using bitumen emulsion @ 5 kg /10 Sqm, putting in premixed bituminous macadam, well rammed and sealed with binder 9.8 kg per/10 Sqm blinded with 0.09 cum of stone chippings, 6.3 mm size and again well rammed with power road roller of 8 to 12 ton capacity and consolidated including supply of premixed macadam, binder and chipping complete all as specified and as directed by the Engineer-in-Charge. | 2 | 10 Sqm | 1,599 ₹3,198 | 3,100 ₹6,200 | 2,000 ₹4,000 |
| 2.00 | M & L for Preparing existing black top surfaces by brushing with wire brushes for removing caked mud etc., sweeping with brooms and finally fanning the cleaned black top surface with gunny bags to remove all loose dirt and Applying evenly a priming/ tack coat @ 5 Kg. Per 10 Sqm using bitumen emulsion (RS-1) conforming to IS-8887 with mechanical sprayer, operated by cold pressure mechanism complete all as specified and as directed by the Engineer-in-Charge. | 60 | 10 Sqm | 131 ₹7,860 | 400 ₹24,000 | 500 ₹30,000 |
| 3.00 | M&L for Premixed Bituminous macadam from hot mix plant with 4% binder content by weight of total mix using paving bitumen of grade VG-30,laid with Mechanical Paver, rolled and compacted with power road roller of 8 to 12 ton capacity to required gradient and camber (consolidated thickness 75 mm or less) complete all as specified and as directed by the Engineer-in-Charge.
Note: Mixing of bituminous concrete shall be in hot mix plant. | 30 | Cum | 4,800 ₹1.4 L | 5,400 ₹1.6 L | 6,300 ₹1.9 L |
| 4.00 | M&L for Preparing existing black top surfaces by brushing with wire brushes for removing caked mud etc., sweeping with brooms and finally fanning the cleaned black top surface with gunny bags to remove all loose dirt and Applying evenly a priming/ tack coat @ 5 Kg. Per 10 Sqm using bitumen emulsion (RS-1) conforming to IS-8887 with mechanical sprayer, operated by cold pressure mechanism including laying of Bituminous Premixed Semi Dense Asphaltic Concrete, 30 mm consolidated thickness, using paving bitumen of Grade VG - 30, with 5.5% of binder content by weight of total mix using Hot Mix Plant and laid with Mechanical Paver, rolled and compacted with power road roller of 8 to 12 ton capacity to required camber and gradient complete all as specified and as directed by the Engineer-in-Charge.
Note:- (i) Mixing of bituminous concrete shall be in Hot Mix Plant.
(ii) Semi dense asphaltic bituminous concrete shall be designed considering the bituminous content as specified and as directed. | 1,200 | 10 Sqm | 2,199 ₹26.4 L | 3,100 ₹37.2 L | 3,000 ₹36 L |
| 5.00 | M&L for cleaning and preparing the bituminous road surface and making good for road marking with reflective thermoplastic white road marking paint confirming to BIS-3262, laid through Road Marking Machine in layer of CRYSTALX (using 5kg per sqm by incorporating 8% white glass beads for reflectivity) and 2mm thick centre line, stop line etc. as per IRC pattern laid at temperature 60 degree centigrade including making necessary traffic diversion arrangement complete all as specified and as directed. | 690 | Sqm | 311 ₹2.1 L | 500 ₹3.5 L | 400 ₹2.8 L |
Updated dates
Tender Value
₹50 L
EMD Value
₹1 L
Closing Date
4 Dec 2025, 6:00 pmClosed
CWE AF BIKANER
HQ CWE AF BIKANER
REPAIR TO CONNECTED ROAD BETWEEN RUNWAY AND PTT AREA AT AF STN NAL
2025_MES_734372_1
C/81634/E8
Open Tender
Civil Works
90 days
GE AF NAL
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE AF NAL
₹1 L
Yes
1 Jan 2026
9 Oct 2025
6 Dec 2025
9 Oct 2025
4 Dec 2025
20 Nov 2025
Amount
M&L for Repairs to pot holes exceeding 30 mm depth,area not exceeding 1.00 Sqm each including sweeping free from dust and mud, or water scoring sunken surfaces in roads, paths etc cutting around edges to at least 25 mm depth, making good by applying tack coat with bituminous primer using bitumen emulsion @ 5 kg /10 Sqm, putting in premixed bituminous macadam, well rammed and sealed with binder 9.8 kg per/10 Sqm blinded with 0.09 cum of stone chippings, 6.3 mm size and again well rammed with power road roller of 8 to 12 ton capacity and consolidated including supply of premixed macadam, binder and chipping complete all as specified and as directed by the Engineer-in-Charge.
M & L for Preparing existing black top surfaces by brushing with wire brushes for removing caked mud etc., sweeping with brooms and finally fanning the cleaned black top surface with gunny bags to remove all loose dirt and Applying evenly a priming/ tack coat @ 5 Kg. Per 10 Sqm using bitumen emulsion (RS-1) conforming to IS-8887 with mechanical sprayer, operated by cold pressure mechanism complete all as specified and as directed by the Engineer-in-Charge.
M&L for Premixed Bituminous macadam from hot mix plant with 4% binder content by weight of total mix using paving bitumen of grade VG-30,laid with Mechanical Paver, rolled and compacted with power road roller of 8 to 12 ton capacity to required gradient and camber (consolidated thickness 75 mm or less) complete all as specified and as directed by the Engineer-in-Charge. Note: Mixing of bituminous concrete shall be in hot mix plant.
M&L for Preparing existing black top surfaces by brushing with wire brushes for removing caked mud etc., sweeping with brooms and finally fanning the cleaned black top surface with gunny bags to remove all loose dirt and Applying evenly a priming/ tack coat @ 5 Kg. Per 10 Sqm using bitumen emulsion (RS-1) conforming to IS-8887 with mechanical sprayer, operated by cold pressure mechanism including laying of Bituminous Premixed Semi Dense Asphaltic Concrete, 30 mm consolidated thickness, using paving bitumen of Grade VG - 30, with 5.5% of binder content by weight of total mix using Hot Mix Plant and laid with Mechanical Paver, rolled and compacted with power road roller of 8 to 12 ton capacity to required camber and gradient complete all as specified and as directed by the Engineer-in-Charge. Note:- (i) Mixing of bituminous concrete shall be in Hot Mix Plant. (ii) Semi dense asphaltic bituminous concrete shall be designed considering the bituminous content as specified and as directed.
M&L for cleaning and preparing the bituminous road surface and making good for road marking with reflective thermoplastic white road marking paint confirming to BIS-3262, laid through Road Marking Machine in layer of CRYSTALX (using 5kg per sqm by incorporating 8% white glass beads for reflectivity) and 2mm thick centre line, stop line etc. as per IRC pattern laid at temperature 60 degree centigrade including making necessary traffic diversion arrangement complete all as specified and as directed.
Ankit Jindal And Company (BID ID -3482637)
m/s gaurav enterprises (BID ID -3484245)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
TenderDocument.pdf
Tender Documents • 2.25 MB
BOQ_822302.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid