Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAccepted-AOC 0 BAGHI NAUGARH NAUGARH CHANDAULI UTTAR PRADESH 232111 | CHANDAULI | UTTAR PRADESH | 232111 | ₹2.3 Cr | L1 | Accepted-AOC L1 Qualified |
| 2 | L2₹2.5 Cr+₹20.9 L (8.97%)Rejected-Finance B 108A SECTOR 36 GREATER NOIDA DISTT G B NAGAR UP | GREATER NOIDA | GAUTAM BUDH NAGAR | UTTAR PRADESH | ₹2.5 Cr+₹20.9 L (8.97%) | L2 | Rejected-Finance L2 |
| 3 | L3₹2.6 Cr+₹26.9 L (11.5%)Rejected-Finance | ₹2.6 Cr+₹26.9 L (11.5%) | L3 | Rejected-Finance L3 |
Tender Value
₹2.9 Cr
EMD Value
₹5.7 L
Closing Date
29 Dec 2023, 3:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer Drainage Circle Gonda
Restoration work of Girgitahi Dam and Canal System in Balrampur district
2023_UPIDC_862852_4
04/SE/2023-24
Open Tender
Civil Works - Canal
Item Rate
180 days
Tahsil Tulsipur District Balrampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹5.7 L
drainage ciircle gonda
8 Feb 2024
22 Dec 2023
29 Dec 2023
22 Dec 2023
29 Dec 2023
22 Dec 2023
26 Dec 2023
Amount
E/W ON TOP & SLOPE OF D/S SIDE BUND
E/W in strengthining of dam (top & slope) by power transport for a lead up to 1.0 km including loading unloading with manual compaction & dressing including all lift rates
E/W ON REMODLING OF CANAL SECTION
Earth work in Canal including lead upto 30M & Lift upto 1.5M, excluding mechanical compaction but including manual compaction and dressing to profile
Boulder Pitching
Dismantling old & damaged boulder pitching stone boulder pitching including stacking of material with in 60m
Supply of stone boulder weight 20 kg up to 40 kg including loading ,unloading & Royalty with contractor profit including all lead & lift Labour T&P etc.
Supply of Haldwani Natural Shingle size 4.75mm to 20mm including loading ,unloading & Royalty with contractor profit including all lead & lift Labour T&P etc.
Supply of Haldwani Natural Shingle size 20mm to 40mm including loading ,unloading & Royalty with contractor profit including all lead & lift Labour T&P etc.
Supply of Coarse Sand including loading ,unloading & Royalty with contractor profit including all lead & lift Labour T&P etc.
Laying Filter Material (coarse Sand ) including loading ,unloading with all lead & lift Labour T&P etc.
Laying Filter Material Haldwani Natural Shingle size 4.75mm to 20mm including loading ,unloading with all lead & lift Labour T&P etc.
Laying Filter Material Haldwani Natural Shingle size 20mm to 40mm including loading ,unloading with all lead & lift Labour T&P etc.
Laying Old Boulder up to 3.0m height with in total lead of 60m including loading ,unloading with all lead & lift Labour T&P etc.
Laying New Boulder up to 3.0m height including loading ,unloading with all lead & lift Labour T&P etc.
Seepage Drain Pitching
Dismantling old & damaged boulder pitching stone boulder pitching including stacking of material with in 60m
E/W in clearance of seepage with partial dressing including all lead and lift etc .
Supply of stone boulder weight up to 20 kg including loading ,unloading & Royalty with contractor profit including all lead & lift Labour T&P etc.
Supply of Haldwani Natural Shingle size 4.75mm to 20mm including loading ,unloading & Royalty with contractor profit including all lead & lift Labour T&P etc.
Supply of Haldwani Natural Shingle size 20mm to 40mm including loading ,unloading & Royalty with contractor profit including all lead & lift Labour T&P etc.
Supply of Coarse Sand including loading ,unloading & Royalty with contractor profit including all lead & lift Labour T&P etc.
Laying Filter Material (coarse Sand ) including loading ,unloading with all lead & lift Labour T&P etc.
Laying Filter Material Haldwani Natural Shingle size 4.75mm to 20mm including loading ,unloading with all lead & lift Labour T&P etc.
Laying Filter Material Haldwani Natural Shingle size 20mm to 40mm including loading ,unloading with all lead & lift Labour T&P etc.
Laying Old Boulder up to 3.0m height with in total lead of 60m including loading ,unloading with all lead & lift Labour T&P etc.
Laying New Boulder up to 3.0m height including loading ,unloading with all lead & lift Labour T&P etc.
Rain Chute
Dry E/W in foundation of masonary on channels of discharge below10cumecs work
Providing and laying cement concrete (1:3:6 ) with 1-cement,3-Coarse sand and Haldwani natural shingle size (20-40 mm.) In foundation including cost of all material, labour and T&P etc. required for proper completion of work.
Ist class brick work in 1:4 CM coarse sand (F.M. not less than 2.0) in Stair with including cost of all material, labour and T&P etc required for proper completion of work .
Cement plaster 1:4 CM with coarse sand including cost of all material ,labour ,T&P etc required for proper completion of the work.
Jungle Clearance
Cutting under growth trees under 10 cm dia including removal of root and their collection within 30 m.
INSPECTION ROAD WITH BRICK SOLING ON TOP OF DAM and SR of Canal
Dry Brick on edge Soling with S.O.B. including prepration of sub grade and filling joints with local sand including cost of all material, labour and T&P etc. required for proper completion of work.
CONSTRUCTION OF KULABA AT GIRGITAHI CANAL SYSTEM
Earth work in digging in Foundation in all type of soil with all lead ,lift & proper disposal of earth and back filling etc. required for proper completion of the work.
Laying C.C. 1:3:6 in foundation with 20-40 mm size Stone ballast & coarse sand having F.M. not less than 2.0 including cost of all material, labour and T&P etc. required for proper completion of the work.
1st class Brick work in 1:4 CM with Ist class bricks and coarse sand having F.M. not less than 2.0 including cost of all material, labour and T&P etc. required for proper completion of the work.
Supplying of 150 mm dia RCC Hume pipe (NP3) including loading,unloading , staking at site and T&P etc. required for proper completion of the work.
Laying of 150 mm dia RCC Hume pipe including T&P,Labour etc. required for proper completion of the work.
Cement plaster 1:4 CM with coarse sand including cost of all material ,labour ,T&P etc required for proper completion of the work.
CONSTRUCTION OF NEW VRB AT KM 3.050 OF GOPALPUR MINOR
Earth work in constructing Road diversion with all lead & lift, proper dressig & manual compaction.
Earth work in excavation of foundation in all type of soil with all lead ,lift & proper disposal of earth and back filling etc. required for proper completion of the work.
Laying C.C. 1:3:6 in foundation with 20-40 mm size Stone ballast & coarse sand including cost of all material, labour and T&P etc. required for proper completion of the work.
1st class Brick work in 1:4 CM with Ist class bricks and coarse sand having including cost of all material, labour and T&P etc. required for proper completion of the work.
Centering & Shuttering for C.C. work including cost of all materials labour and T&P etc. required for proper completion of the work.
Laying R.C.C. 1:1.5:3 with 4.75-20 mm size Stone ballast & coarse sand including cost of all material, labour and T&P etc. required for proper completion of the work.
Steel reinforcement including cutting, bending, binding and placing in position with cost of binding wire, steel, labour, T&P etc. required for proper completion of work.
S/fixing of 20mm thick joint filler board and placing in position including labour, T&P etc. required for proper completion of work.
Earth work in constructing ramp with all lead & lift, proper dressig & manual compaction.
Brick on edge soling over ramp incuding all material, labour, T&P etc. required for proper completion of the work.
Cement pointing in 1:2 CM with coarse sand including cost of all materials labour and T&P etc. required for proper completion of the work.
Repairing of Fall
1st class Brick work in 1:4 CM with Ist class bricks and coarse sand having including cost of all material, labour and T&P etc. required for proper completion of the work.
Laying C.C. 1:2:4 with 4.75-20 mm size Stone ballast & coarse sand including cost of all material, labour and T&P etc. required for proper completion of the work.
Cement pointing in 1:2 CM with coarse sand including cost of all materials labour and T&P etc. required for proper completion of the work.
Lining of Canal
Double Flat brick Lining 1:3 Cement Mortar with 8 mm Thick sand witched plaster over 10 cm thick local sand.
M/S VIRAT CONSTRUCTION
M/S AADI SHAKTI TRADERS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .