| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.9 LAccepted-Finance NAGAR MOHALLA RAJGARH | RAJGARH | RAJGARH | MADHYA PRADESH | 1 | Accepted-Finance ok | |
| 2 | 2₹8.6 L+₹74,953.06 (9.54%)Rejected-Finance HW11 DAUARA TEHSIL CHITRANGI DISTT SINGRAULI M P | CHITRANGI | SINGRAULI | MADHYA PRADESH | 2 | Rejected-Finance ok | |
| 3 | 3₹11.1 L+₹3.2 L (41.1%)Rejected-Finance 15 CP COLONY MORAR GWALIOR MP 474 006 | GWALIOR | GWALIOR | MADHYA PRADESH | 474006 | 3 | Rejected-Finance ok |
Tender Value
₹12.5 L
EMD Value
₹24,980
Closing Date
11 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE PWD SIDHI
EE PWD SIDHI
Renovation of First Floor Private Ward in Distrcit Hospital Campus Sidhi, Under PWD Sub Division Sidhi, PWD Building SOR w.e.f 01-01-24
2026_PWDRB_544598_1
NIT 20/ SIDHI / 2026-27 / 23-10-26
Open Tender
Civil Works - Buildings
Percentage
120 days
EE PWD SIDHI
Renovation of First Floor Private Ward in Distrcit Hospital Campus Sidhi, Under PWD Sub Division Sidhi, PWD Building SOR w.e.f 01-01-24
3 documents required · 3 mandatory
₹2,000
₹24,980
20 Nov 2026
30 Oct 2026
13 Nov 2026
30 Oct 2026
11 Nov 2026
30 Oct 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-inCharge. | 17.3 | Cum | 844 | ₹14,601.2 |
| 2 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stackingwithin 50 metres lead :
15.14.1 Of area 3 sq. metres and below. | 9 | Each | 85 | ₹765 |
| 3 | Dismantling tile/ Kota stone/ Marble / Granite work in floors/walls and roofs laid in cement mortar including stacking material within 50 metres lead.
15.11.1 For thickness of tiles 10 mm to 25 mm. | 188.07 | Sqm | 17 | ₹3,197.19 |
| 4 | Reinforced cement concrete work (with 20 mm nominal size graded stone aggregate) in beams, suspended floors, roofs havingslope of any degree landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiralstaircases above plinth level and upto floor two level excluding the cost of centering, shuttering, finishing and reinforcement inconcrete grade.
5.3.1 M-20 Grade Concrete | 25.23 | Cum. | 6,541 | ₹1,65,029.43 |
| 5 | Extra for R.C.C. work above floor two level for each floors or part thereof. (except items 5.27 and 5.30) | 25.23 | Cum. | 65.41 | ₹1,650.29 |
| 6 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding including cost of binding wire all wastages and overlaps, couplers (overlaps shall be provided as per requirement of IS 13920 for ductile detaling IS 456 RCC Design & SP 34 Reinforcement detailing ) etc. complete .
(Note:-
1. Spacer bars (chairs) shall be paid separately as shown in the drawing and as per direction of engineer in charge.
2. No extra payment shall be done for overlaps and/or couplers.
3.Couplers shall be conforming to IS code on “Reinforcement Couplers for Mechanical Splices of Bars for Concrete Reinforcement - Specification”)
5.16.3 Cold twisted bars (CTD) | 2,775.3 | Kg | 81 | ₹2,24,799.3 |
| 7 | Add extra for providing reinforcement above Floor two level for every additional floor or part thereof | 2,775.3 | Kg | 0.2 | ₹555.06 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for :
5.9.5 Lintels, beams, girders, bressumers and cantilevers | 48.72 | Sqm | 356 | ₹17,344.32 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for :
5.9.3 Suspended floors, roofs, landings, balconies and access platform . | 128.57 | Sqm | 439.6 | ₹56,519.37 |
| 10 | Brick work with fly ash lime bricks (FALG Bricks) conforming to IS:12894-2002, in super structure above plinth level up to floor II level in
6.7.3 having 50 kg / cm2 average compressive strength
6.7.3.2 Cement mortar 1:6 (1 cement : 6 sand) | 1.98 | Cum. | 4,936 | ₹9,773.28 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
544598Doc.pdf
Tender Documents • 18.21 MB
BOQ_657477.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .