| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 LAccepted-AOC NANK CHAND NIWAS LOWER KANGNADHAR PHASE II NEW SHIMLA | SHIMLA | SHIMLA | HIMACHAL PRADESH | L1 | Accepted-AOC AOC | |
| 2 | L2₹6.6 L+₹22,107 (3.45%)Rejected-Finance R O SHAHI NIWAS UPMOHAL KYARI P O AMBEDKAR CHOWK TUTIKANDI SHIMLA 4 | L2 | Rejected-Finance 2nd Lowest |
Tender Value
Refer Docs
EMD Value
₹12,700
Closing Date
28 Mar 2026, 10:10 amClosed
Executive Engineer Division Kasumpti HPPWD Shimla-
Executive Engineer Division Kasumpti HPPWD Shimla-3
A/R and M/O various Road under kasumpti sub Division at kasumpti Shimla
2026_PWD_132057_1
SD-I-CTR-Tendewr-2025- 27341 dt 19-03-2026
Open Tender
Civil Works
Percentage
30 days
kasupti
AS per SBD
12 documents required · 12 mandatory
₹350
₹12,700
5 May 2026
20 Mar 2026
28 Mar 2026
20 Mar 2026
28 Mar 2026
20 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm (Thirty centimetre) in depth, 1.5 m (One point five metre) in width as well as 10 sqm (ten Square Metre) on plan) including getting out and disposal of excavated earth all lead and lift as directed by Engineer-in-charge and sorting out useful and unuseful material and transportation of the unuseful material for disposing at dumping site (To be arranged by the contractor) as per satisfaction of Engineer- in -charge through all modes of transportation including head load ,animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour ( if required ) Any loss to the public and private propriety, human being, machinery during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. (i)All kinds of soil. | |||||
| 2Providing form work with steel plates 3.15mm(three point fifteen milimetre) thick welded with angle iron in frame 30x30x5mm (thirty into thirty into five milimetre) so as to give a fair finish i/c centring, shuttering, strutting and propping etc. with wooden/steel battens and bailies in all heights or propping and centring, below supporting floor to ceiling and removal of the same for in situ- reinforced concrete and plain concrete work including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (i) Flat surfaces such as soffits of suspended floors, roofs, landings etc upto 200mm thickness. (c)Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | |||||
| 3Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.i) 1:2:4 (1 Cement : 2 coarse sand ) : 4 graded stone aggregate 20 mm norminal size) | |||||
| 4Steel work welded in hollow pipe sections, buil tup and framed work including cutting hoisting fixing in position and applying a priming coat of red lead paint including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (a) In gratings, framed guards bars ladders, railing, brackets and similar work. | |||||
| 5Steel work welded in built up sections, and framed work including cutting hoisting fixing in position and applying a priming coat of red lead paint including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (a) In gratings, framed guards bars ladders, railing, brackets and similar work. | |||||
| 6Painting two coats (excluding coat) on new wood and wood based surface with enamel paint to give an even shade including cleaning the surface of dirt, dust and other foreign matter, sand papering & stopping including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (a) With white enamel paint. | |||||
| 7Providing and laying 80 mm thick faciory made cement concrete interlocking paver block of M -50 grade made by block making machines with strong vibratory compaction , of approved sixe , design & shape , laid in requires colour and pattern over and includes 50 mm thick compacted bed of coarse sand , filling the joints with line and sand etc. including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. ( Labour Rate ) | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
SBD631604.pdf
Tender Documents • 7.00 MB
BOQ_195279.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .