| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.3 Cr+₹2.5 L (2.00%)Rejected-Finance ERODE | ₹1.3 Cr+₹2.5 L (2.00%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | Mahasamy Sakthivel L2 | SRI BALAJI AND CO L1 |
|---|---|---|---|---|---|
| 1.00Strenthening the road from Erode - Dharapuram road to muniappankoil ( via) Chettipalayam KM 0/0 - 1/890 H/O 46pudhur (R-313 PUR) | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burrying and burning etc., | 720 | Sqm | 7 ₹5,040 | 6.36 ₹4,579.2 Lowest |
| 3.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 2,376.88 | Sqm | 25 ₹59,422 | 23.36 ₹55,523.92 Lowest |
| 4.00Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | |||||
| 5.00 | KM 0/0 - 1/0 | 148.2 | cum | 585 ₹86,697 | 581.07 ₹86,114.57 Lowest |
| 6.00 | KM 1/0 - 1/890 | 88.5 | cum | 585 ₹51,772.5 | 581.07 ₹51,424.7 Lowest |
| 7.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 885.7 | cum | 2,640 ₹23,38,248 | 2,630.4 ₹23,29,745.28 Lowest |
| 8.00 | Providing and laying Prime Coat over WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5 | 7,085.63 | Sqm | 93 ₹6,58,963.59 | 85.9 ₹6,08,655.62 Lowest |
| 9.00 | Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 | 7,085.63 | Sqm | 29 ₹2,05,483.27 | 20.04 ₹1,41,996.03 Lowest |
| 10.00 | Providing and laying Bituminous Concrete to 25/30/40 mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30 kgs of VG30/ VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP using( Vibratory Roller) | 177.13 | cum | 11,790 ₹20,88,362.7 | 11,787.43 ₹20,87,907.48 Lowest |
Tender Value
₹1.3 Cr
EMD Value
₹1.3 L
Closing Date
20 Feb 2026, 3:00 pmClosed
Project Director
DRDA, Collectorate, Erode
Erode District Strengthening of the Road 2 Nos. in Package No TN 12-02 Modakkurichi Block under NABARD 2026-27
2026_RDTN_656658_1
Roc.No.692/2026/A5 dt.12.02.2026
Open Tender
Civil Works - Roads
Item Rate
180 days
Modakkurichi Block
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹1.3 L
20 Mar 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Strenthening the road from Erode - Dharapuram road to muniappankoil ( via) Chettipalayam KM 0/0 - 1/890 H/O 46pudhur (R-313 PUR) | - | - | - | - |
| 2 | Clearing the Scrub jungle including all labour charges for burrying and burning etc., | 720 | Sqm | - | - |
| 3 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 2,376.88 | Sqm | - | - |
| 4 | Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | - | - | - | - |
| 5 | KM 0/0 - 1/0 | 148.2 | cum | - | - |
| 6 | KM 1/0 - 1/890 | 88.5 | cum | - | - |
| 7 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 885.7 | cum | - | - |
| 8 | Providing and laying Prime Coat over WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5 | 7,085.63 | Sqm | - | - |
| 9 | Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 | 7,085.63 | Sqm | - | - |
| 10 | Providing and laying Bituminous Concrete to 25/30/40 mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30 kgs of VG30/ VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP using( Vibratory Roller) | 177.13 | cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.72 MB
tn1202techbid.pdf
Tender Documents • 1.09 MB
BOQ_787463.xls
BOQ • 0.38 MB
tn1202pricebid.pdf
Tender Documents • 0.82 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .