Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical GOVT CONTRACTOR DISTT CHAMBA HP 176303 | CHAMBA | HIMACHAL PRADESH | 176303 | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical SHIMLA DIVISION NO I HIMACHAL PRADESH HP | SHIMLA | HIMACHAL PRADESH | 171001 | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical VILLAGE ANU RAKSHI P O KARERI TEHSIL RAMPUR DISTT SHIMLA H P | SHIMLA | SHIMLA | HIMACHAL PRADESH | Admitted-Fee/PreQual/Technical |
Tender Value
Refer Docs
EMD Value
₹17,500
Closing Date
6 Nov 2025, 5:00 pmClosed
Executive Engineer Division No-IHPPWD Shimla-3
Executive Engineer Division No-IHPPWD Shimla-3
Construction of 900mm dia Hume pipe culvert at RD. 3/625
2025_PWD_118934_2
SD-I-CTR-Tender-2025- 13841 dated 27-10-2025
Open Tender
Civil Works
Percentage
30 days
Shimla
As per SBD
13 documents required · 13 mandatory
₹350
₹17,500
14 Nov 2025
29 Oct 2025
7 Nov 2025
29 Oct 2025
6 Nov 2025
29 Oct 2025
Cutting and disposal of earth work in by mechanical in all heights and depths in all kinds of soils, including saturated soils comprising of pick work, jumper work and blasting work both in soft and hard rock with chiseling and wedging out of rock (where blasting is prohibited) and their intermediate classification of soils including, dewatering wherever required, setting of to the required lines, levels as shown on the drawing and directed by the Engineer -in-charge at site., according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at dumping site as per satisfaction of Engineer- in -charge through all modes of transportation including head load ,animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour ( if required ). All the surplus excavated earth to be dumped at dumping site(dumping sites will be arranged by the contractor on his own cost). Any loss to the public and private propriety, human being, machinery during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material. Hard Roack blasting prohibited and their intermediate classification of soils including, dewatering wherever required, setting of to the required lines, levels as shown on the drawing and directed by the Engineer -in-charge at site, according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at dumping site (To be arranged by the contractor) including payment of prescribed charges of dumping to the owner of dumping site as per satisfaction of Engineer-in-Charge through all modes of transportation including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour (if required).All useful material such as stones, shingles aggregate and slates shall be properly stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation the usefull stones as per the direction of the Engineer-in-Charge. Any loss to the public and private propriety during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges.
Providing and laying concrete for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802,803,1202 and 1203 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.(a) Cement Mortar 1:4:8(One cement:Four sand:Eight graded stone aggregate20 mm(Twenty milimetre) nominal size).
Providing and laying concrete for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802,803,1202 and 1203 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.(a) Cement Mortar 1:3:6(one cement:Three sand:Six graded stone aggregate 20mm(Twenty milimetre) nominal size).
Providing and laying concrete for plain /reinforced cement concrete in open foundation complete as per drawing and technical specification clauses 802,804,806,807,204 and 1203 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.(a) Cement Mortar 1:2.5:5(one cement into two point five into sand into five graded stone aggregate 40mm(forty milimetre) nominal size).
Providing and laying concrete for plain /reinforced cement concrete in open foundation as per drawing and technical specification clauses 802,804,806,807,204 and 1203 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.(a) Cement Mortar 1:2.5:5(one cement into two point five into sand into five graded stone aggregate 20mm(Twenty milimetre) nominal size).
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection work, back filling, concrete and masonry work in head walls and parapets clause 1108 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (i) 900mm (Nine hundred milimeter) dia.
Providing and laying Rubble stone flooring laid in cement mortar 1:3 laid over cement concrete bedding complete as per drawing and technical specification Clause 1303 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
Backfilling behind abutment, wing wall and return wall complete as per drawings and technical specification clause 1204.3.8 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (a) Granular material.
Providing weapholes in brick masonry / stone masonry /plain reinforced concrete abutment, wing wall, return wall with 100 mm(One hundred milimetre) dia PVC pipe extending through the full with of the structures with slop of 1(v):20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204.3.7 including carriage of materials in all leads and lifts as per the directions of the Engineer-in-Charge.
stage.html
html • 0.03 MB
tech_bid_open.pdf
cancelled_1.pdf
pdf • 0.59 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.66 MB
SBD865750.pdf
Tender Documents • 2.26 MB
BOQ_174077.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .