| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.7 LAccepted-AOC | 1 | Accepted-AOC Lowest Bidder | |
| 2 | 2nd₹2.0 L+₹23,796.07 (13.8%)Rejected-Finance | 2nd | Rejected-Finance 2nd Howest quote | |
| 3 | 3rd₹2.4 L+₹70,999.59 (41.2%)Rejected-Finance | 3rd | Rejected-Finance Highest Quote |
Tender Value
₹2.0 L
EMD Value
₹5,000
Closing Date
30 Aug 2018, 10:30 amClosed
The Director
ICAR-DCR, Puttur, D.K. District, Karnataka 574202
Extension of Corridor Connecting Library to Crop Protection Unit at ICAR-DCR, Puttur
2018_DARE_367898_1
Extension_Corridor
Open Tender
Miscellaneous Works
Works
45 days
ICAR-DCR, Puttur, D.K. District
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
Yes
ICAR Unit, DCR Puttur
₹5,000
Yes
27 Aug 2020
2 Aug 2018
31 Aug 2018
2 Aug 2018
30 Aug 2018
2 Aug 2018
2 Aug 2018 - 29 Aug 2018
Extension of Corridor connects Library cum Main Conference Hall to Crop Protection Unit at ICAR-DCR, Kemminje, Puttur
Earth work excavation in hard soil for erecting pipe and foundation for brick pillars. The rate shall include cost of labour material etc complete.
Providing and laying PCC in CM 1: 1½ : 3 using 20 mm down size granite jelly aggregate. The rate shall include cost of material, labour etc complete.
Providing, Fabricating, Setting – Mangalore Tiles roof using ½” square rod, 1½” x 1½” x ¼” GI angle as common rafter, 3”x ½” GI channel as wall plate with 2½” GI ‘B’ class pipe as supporter including base plates at top, bottom cross rod. The work also includes providing and laying 1st Class Mangalore Tiles, ridge tiles, lime mortar band over ridge tile etc to finish. The rate shall include cost of materials, labour etc to complete. 15.5 m x 6.15 m
Plastering the bottom of pipe pillar structure in 12mm thick, finishing curing etc complete. The rate shall include cost of materials, labour etc to complete.
Providing and constructing burnt masonry with approved quality of non-modular bricks of standard size of class designation 35 for pillar structure. The rate shall include cost of materials, labour etc complete.
Finishing work. All the un plastered brick pillars and basement of the GI pillar pipes need to be finished with colouring of exterior emulsion in two coats. The rate shall include cost of materials, labour etc to complete.
Providing and fixing transparent fibre sheet 1 mm thick embedded in 1 inch angle structure at two ends of the roof structure. The rate shall include cost of materials, labour etc to complete.
Providing and laying lime band of 6.0 m x 0.15 x 0.10 at 4 meter apart across the slope on both sides. The rate shall include cost of materials, labour etc to complete.
KABAKKAR ASSOCIATES
RAMESH SHETTY
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .