Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-PreQual/Technical SY NO 163 GAGILLAPUR DUNDIGAL MANDAL HYDERABAD RANGAREDDI TELANGANA 500043 | MEDCHAL MALKAJGIRI | TELANGANA | 500043 | Admitted-PreQual/Technical |
| 2 | Admitted-PreQual/Technical | Admitted-PreQual/Technical |
| 3 | Admitted-PreQual/Technical NEW NO 5A OLD NO 80 53RD STREET ASHOK NAGAR CHENNAI TAMIL NADU 600083 | CHENNAI | TAMIL NADU | 600083 | Admitted-PreQual/Technical |
| 4 | Admitted-PreQual/Technical 202 3 PHASE 2 IDA CHERLAPALLY HYDERABAD TELANGANA 500051 | MEDCHAL MALKAJGIRI | TELANGANA | 500051 | Admitted-PreQual/Technical |
| 5 | Admitted-PreQual/Technical 405 406 FF NILKANTH PALACE OPP KARMA SHRSTHAN TOWER 100 FT ROAD JODHPUR SATELLITE AHMEDABAD GUJARAT 380015 | AHMADABAD | GUJARAT | 380015 | Admitted-PreQual/Technical |
Tender Value
₹3.4 Cr
EMD Value
₹6.7 L
Closing Date
2 Jul 2026, 3:15 pmClosed
CHIEF ENGINEER, RRCAT, INDORE
CSD OFFICE RRCAT INDORE
Supply, Installation, Testing and Commissioning of HVAC system for ISO-7 class clean room for G-block extension building and C-1 block with other HVAC work at RRCAT, Indore
2026_RRCAT_910317_1
RRCAT/CSD/EEACS/4410/26/24
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
480 days
RRCAT
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹6.7 L
26 Jun 2026
26 May 2026
7 Jul 2026
27 May 2026
2 Jul 2026
27 May 2026
8 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0Important Note:(1)The bidder must possess valid EPF & ESIC registration as per relevant laws. The bidders need to deposit EPF & ESIC with appropriate authority. The reimbursement for the same shall not be made.(2)The payment of wages to labourers should be made through bank. | |||||
| 1Air Handling Units (AHUs) for ISO-7 class clean rooms | |||||
| 1.01 | AHU-1 for C1-block: Design, fabrication, supply, installation, testing & commissioning of Double Skin Air Handling Unit (AHU) constructed from outer skin with 1mm thick precoated G.I. sheet (of minimum 180 GSM) & 1.2 mm thick plain inner G.I. sheet (of minimum 180 GSM) with 46 mm thick injected PUF insulation of 40 kg/m3 approx. with thermal break profile complete with aluminium extruded framework structural section for VRF condensing units and comprising of following sections:
a. Mixing chamber for Fresh Air & Return Air with volume control dampers.
b. Pre filter section with G4 filter as per EN779
c. Cooling coil section with 6 rows deep cooling coil suitable for above VRF condensing units with Cooling option, necessary Expansion & Communication Kits compatible for connection of VRF outdoor units in single / multiple form along with 1 mm thick S.S. drain pan and drain outlet. Hydrophilic coating shall be provided on cooling coil. Drift eliminator shall be provided.
d. UV lamps section with UL listed UV lamps
e. Heater section with thyristor controlled heater (32 kW)
f. Humidifier (2kW) complete with required water heaters, float valve,low water level safety switch, piping and necessary fittings.
g. Blower section with statically and dynamically balanced direct driven Airfoil Plug fan and Squirrel cage induction motor (with VFD) of TEFC type suitable for 3 -phase, 400V, 50Hz of efficiency class IE3. The winding of motor shall be class 'F' insulated and fully tropicalised, motor shall be rated for continuous duty as defined in IS: 325 for blower with adjustable base frame, fitted on a common extruded Aluminium channel using anti vibration mountings for silent and vibration free operation.
b. Fine filter section with F9 filter as per EN779
i. Temperature sensor and RH sensor with transmitter unit and associated cabling, differential pressure transmitter to maintain the constant flow of air in different choked condition of filters, differential pressure switches across fine and pre-filter for monitoring the condition of the respective filter
j. Flanged connection at the inlet & outlet of AHU with volume control damper for integrating to the main duct lines.
l. Suitable inspection doors for filter, coil & blower sections.
m. Suitably rated antivibration (Cushyfoot) mountings for AHU installation.
Including all other components and accessories required for proper operation of AHU and to achieve required temperature (21 ± 1˚C) and relative humidity (50% ± 10 %) as per tender specifications in following capacity:
AHU/7500 CFM /16 TR/150 mm WG. S.P.
All other details shall be as per technical specification and drawing. | 1 | No. | - | - |
| 1.02 | AHU-2 & 3 for G-block: Design, fabrication, supply, installation, testing & commissioning of Double Skin Air Handling Unit (AHU) constructed from outer skin with 1mm thick precoated G.I. sheet (of minimum 180 GSM) & 1.2 mm thick plain inner G.I. sheet (of minimum 180 GSM) with 46 mm thick injected PUF insulation of 40 kg/m3 approx. with thermal break profile complete with aluminium extruded framework structural section for VRF condensing units and comprising of following sections:
a. Mixing chamber for Fresh Air & Return Air with volume control dampers.
b. Pre filter section with G4 filter as per EN779
c. Cooling coil section with 6 rows deep cooling coil suitable for VRF condensing units (22 HP) with Cooling option as one working and one standby, necessary Expansion & Communication Kits compatible for connection of VRF outdoor units in single / multiple form along with 1 mm thick S.S. drain pan and drain outlet. Hydrophilic coating shall be provided on cooling coil. Drift eliminator shall be provided.
d. UV lamps section with UL listed UV lamps
e. Heater section with thyristor controlled heater (46 kW)
f. Humidifier (2kW) complete with required water heaters, float valve,low water level safety switch, piping and necessary fittings.
g. Blower section with statically and dynamically balanced direct driven Airfoil Plug fan and Squirrel cage induction motor (with VFD) of TEFC type suitable for 3 -phase, 400V, 50Hz of efficiency class IE3. The winding of motor shall be class 'F' insulated and fully tropicalised, motor shall be rated for continuous duty as defined in IS: 325 for blower with adjustable base frame, fitted on a common extruded Aluminium channel using anti vibration mountings for silent and vibration free operation.
b. Fine filter section with F9 filter as per EN779
i. Temperature sensor and RH sensor with transmitter unit and associated cabling, differential pressure transmitter to maintain the constant flow of air in different choked condition of filters, differential pressure switches across fine and pre-filter for monitoring the condition of the respective filter
j. Flanged connection at the inlet & outlet of AHU with volume control damper for integrating to the main duct lines.
l. Suitable inspection doors for filter, coil & blower sections.
m. Suitably rated antivibration (Cushyfoot) mountings for AHU installation.
Including all other components and accessories required for proper operation of AHU and to achieve required temperature (22 ± 2˚C) and relative humidity (50% ± 10 %) as per tender specifications in following capacity:
AHU/8000 CFM /17 TR/150 mm WG. S.P.
All other details shall be as per technical specification and drawing. | 2 | Nos. | - | - |
| 2VRF Outdoor Units for above AHUs: Design, Supply, installation, testing & commissioning of Air Cooled Variable Refrigerant Flow type multi unit air-conditioning system with Cooling Option. | |||||
| 2.01 | For AHU-1: Design, supply, installation, testing & commissioning of 14 HP Modulating Outdoor / Condensing units with Cooling Option complete with hermetically sealed 100% inverter Compressors, Condenser coils, variable speed condenser fan with motor, Microprocessor Controller etc. The unit shall include the necessary expansion & communication kits compatible for connection of VRF outdoor units with AHU mentioned above in single / multiple form. The units should be operated on Refrigerant - R410A. The condensing units will be installed at suitable place for compact run of piping along with MS raised stand with vibration isolation pads as per drawing. All other details as per technical specifications & drawings. | 2 | Nos. | - | - |
| 2.02 | For AHU-2 & 3: Design, supply, installation, testing & commissioning of 22 HP Modulating Outdoor / Condensing units with Cooling Option (1 working+1 standby in a set) complete with hermetically sealed 100% inverter Compressors, Condenser coils, variable speed condenser fan with motor, Microprocessor Controller etc. The unit shall include the necessary expansion & communication kits compatible for connection of VRF outdoor units with AHU mentioned above in single / multiple form. The units should be operated on Refrigerant - R410A. The condensing units will be installed at suitable place for compact run of piping along with MS raised stand with vibration isolation pads as per drawing. All other details as per technical specifications & drawings. | 4 | Nos. | - | - |
| 3 | Inter-connected Copper Refrigerant piping for VRF System : Hard / Soft drawn copper refrigerant piping of 18 G in brazed construction between AHU & VRF Outdoor / Condensing units with class 'O' nitrile rubber insulation with Aluminium foil (19 mm thick), 16 G. G.I. perforated tray for Refrigerant piping & cabling etc. of various widths with support & clamps etc. required for proper installation, operation and controls of the units. All pipings shall be pressure tested for 48 hrs. pressure hold test at minimum 1.5 times the working pressure. Suitable weight bearing supports shall be planned for all vertical headers / pipe networks. | 100 | meter | - | - |
| 4 | Condensate Drain Water and humidifier connection Piping: Condensate Drain Water Piping : Supply, installation & testing of 40 mm dia. CPVC rigid condensate drain pipes of class SDR 11 with 'U' trap complete from AHU to nearest drain point as per tender specification. | 60 | meter | - | - |
| 5Electrical Panel for above AHUs with condensing units: | |||||
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.48 MB
Annexure1BankDetails.pdf
Tender Documents • 0.52 MB
AppendixIBidderEvaluationCriteria.pdf
Tender Documents • 0.22 MB
CONDITIONCLAUSEOFCONTRACTconverted.pdf
Tender Documents • 1.33 MB
ScheduleB.pdf
Tender Documents • 0.01 MB
DRW07secondfloorOutdoorunit.pdf
Tender Documents • 0.27 MB
GTPRev0.pdf
Tender Documents • 0.23 MB
NITSGF.pdf
Tender Documents • 1.15 MB
ScheduleA.pdf
Tender Documents • 0.62 MB
BOQ_956735.xls
BOQ • 0.34 MB
DRW01CLEANROOMFINAL.pdf
Tender Documents • 0.53 MB
DRW02CLEANROOMFINAL.pdf
Tender Documents • 0.54 MB
technicalspecificationcleanroom.pdf
Tender Documents • 0.77 MB
DRW03AHUroomplanatthirdfloor.pdf
Tender Documents • 0.11 MB
DRW04DuctplanF26F27.pdf
Tender Documents • 0.16 MB
NIT.pdf
Tender Documents • 0.47 MB
DRW05SectionBB.pdf
Tender Documents • 0.11 MB
DRW06GroundfloorfirstfloorOutdoorunit.pdf
Tender Documents • 2.79 MB
dateextendcorrigendum.pdf
PDF • 0.41 MB
PrebidClarifications.pdf
PDF • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .