| 1 | L1₹19.2 LAccepted-AOC JAYANT NEAR JAI HIND SCHOOL LAXMI MARKET SINGRAULI 486890 MADHYA PRADESH INDIA | SINGRAULI | MADHYA PRADESH | 486890 | ₹19.2 L Quoted ₹16.3 L | L1 | Accepted-AOC Accepted on L1 basis |
| Sl No | Description | Qty | Unit | SARWESHWARI ENTERPRISES L1 |
|---|---|---|---|---|
| 1.00Repairing of 04 nos. Front Suspension applicable to CAT777E, 100T dumpers. | ||||
| 1.01 | Total cost of Packaging, Forwarding, insurance and To & Fro transportation from NCL Jayant Project to repairer's site. | 4 | nos. of suspension | 18,917 ₹75,668 Lowest |
| 1.02 | Cost of manpower for dismantling of the Front Suspension cylinder assembly. Steam cleaning of the cylinder barrel, piston rod and all other parts. Carry out pre-inspection and recording data for the preparation of visual & dimensional inspection report, Remove the tube and gland and steam cleaning the housing. Mount the cylinder housing on suitable lathe. Alignment of the centerline of the housing bore to the centerline of lathe. Remove all the seal lands. Fill the machined bore with the welding material as per specifications. Machine the wear ring, the buffer seal and the wiper seal grooves according to the dimensions as per housing assembly of the standards. Remove all sharp edges after machining the grooves. Buffing the machined area. Thoroughly clean the front suspension cylinder mounting flange for inspection including contractor’s profit and any other cost. | 4 | nos. of suspension | 60,167 ₹2,40,668 Lowest |
| 1.03 | Cost of manpower for De-chroming of piston rod to remove existing chrome plating. Pre-grinding of the piston rod surface to remove dent marks, if any. Hard chrome plating of the pre-ground surface of piston rod by required thickness to achieve size and hardness. Hydrogen de-embrittlement of the chrome plated surface to remove trapped hydrogen. Finish grinding of the hard chrome plated diameter. Rectification of thread on piston rod. Mount the head on Lathe machine to make proper cuts. Fill the head with welding material. The head will be preheated and welded and machine the head as per dimension. Replacement of old seals with new seals. Assembling of the cylinder with seal kits and painting including Contractor’s profit and any other cost. | 4 | nos. of suspension | 12,307 ₹49,228 Lowest |
| 1.04 | Hiring cost of welding machine for 18 days/suspension. | 4 | nos. of suspension | 1,986 ₹7,944 Lowest |
| 1.05 | Cost of lathe machine charge for 112 hrs/suspension. | 4 | nos. of suspension | 60,364 ₹2,41,456 Lowest |
| 1.06 | Cost of honing and polishing charge for 112 hrs/suspension. | 4 | nos. of suspension | 60,364 ₹2,41,456 Lowest |
| 1.07 | Cost of electrode Durochrome 20kg/suspension. | 4 | nos. of suspension | 51,553 ₹2,06,212 Lowest |
| 1.08 | Cost of low hydrogen electrode 20kg/suspension. | 4 | nos. of suspension | 2,902 ₹11,608 Lowest |
| 1.09 | Cost of piston tube D-chrome grinding. | 4 | nos. of suspension | 27,819 ₹1,11,276 Lowest |
Tender Value
₹20.5 L
EMD Value
₹25,600
Closing Date
31 Mar 2026, 11:00 amClosed
GM(Excv), Jayant Project
GM office, Jayant project, Singrauli, M.P-486890
- Repairing of 04 nos. Front Suspension applicable to CAT777E, 100T dumpers.
2026_NCL_357171_1
JNT/GM(Excv)/E-tender/25-26/66
Open Tender
Excavation Department Work
Item Rate
365 days
Jayant Project
As per NIT
4 documents required · 4 mandatory
₹25,600
30 Jul 2026
20 Mar 2026
1 Apr 2026
20 Mar 2026
31 Mar 2026
21 Mar 2026
20 Mar 2026 - 24 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Repairing of 04 nos. Front Suspension applicable to CAT777E, 100T dumpers. | |||||
| 1.01 | Total cost of Packaging, Forwarding, insurance and To & Fro transportation from NCL Jayant Project to repairer's site. | - | nos. of suspension | - | - |
| 1.02 | Cost of manpower for dismantling of the Front Suspension cylinder assembly. Steam cleaning of the cylinder barrel, piston rod and all other parts. Carry out pre-inspection and recording data for the preparation of visual & dimensional inspection report, Remove the tube and gland and steam cleaning the housing. Mount the cylinder housing on suitable lathe. Alignment of the centerline of the housing bore to the centerline of lathe. Remove all the seal lands. Fill the machined bore with the welding material as per specifications. Machine the wear ring, the buffer seal and the wiper seal grooves according to the dimensions as per housing assembly of the standards. Remove all sharp edges after machining the grooves. Buffing the machined area. Thoroughly clean the front suspension cylinder mounting flange for inspection including contractor’s profit and any other cost. | - | nos. of suspension | - | - |
| 1.03 | Cost of manpower for De-chroming of piston rod to remove existing chrome plating. Pre-grinding of the piston rod surface to remove dent marks, if any. Hard chrome plating of the pre-ground surface of piston rod by required thickness to achieve size and hardness. Hydrogen de-embrittlement of the chrome plated surface to remove trapped hydrogen. Finish grinding of the hard chrome plated diameter. Rectification of thread on piston rod. Mount the head on Lathe machine to make proper cuts. Fill the head with welding material. The head will be preheated and welded and machine the head as per dimension. Replacement of old seals with new seals. Assembling of the cylinder with seal kits and painting including Contractor’s profit and any other cost. | - | nos. of suspension | - | - |
| 1.04 | Hiring cost of welding machine for 18 days/suspension. | - | nos. of suspension | - | - |
| 1.05 | Cost of lathe machine charge for 112 hrs/suspension. | - | nos. of suspension | - | - |
| 1.06 | Cost of honing and polishing charge for 112 hrs/suspension. | - | nos. of suspension | - | - |
| 1.07 | Cost of electrode Durochrome 20kg/suspension. | - | nos. of suspension | - | - |
| 1.08 | Cost of low hydrogen electrode 20kg/suspension. | - | nos. of suspension | - | - |
| 1.09 | Cost of piston tube D-chrome grinding. | - | nos. of suspension | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.15 MB
BOQ_370039.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .