Loading…
Loading…
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
3 Oct 2026, 11:00 am3d left
BDO PANCHAYAT SAMITI LOONKARANSAR
PANCHAYAT SAMITI LOONKARANSAR
Rajkiy Uchh Madhymik Vidhalay Subhlai me 04 Kaksha Kaksho ka nirman kary
2026_PRD_598880_1
PSLKS 446-48 dated 17.09.2026
Open Tender
Civil Works
Percentage
Ajeetmana
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
BDO PANCHAYAT SAMITI LOONKARANSAR
₹90,000
Yes
3 Oct 2026
18 Sept 2026
3 Oct 2026
18 Sept 2026
3 Oct 2026
18 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work infoundation excavation upto1.5m,ramming bottom ,dressing sides,backfilling and disposalo fsurplussoil withinalead of 50m. | 106.63 | Cum | 178.46 | ₹19,029.19 |
| 1.02 | Cement concretein foundation and plinthw ithstone ballast size 40 mm including curing and compaction etc in 1:4:8 mix | 18.03 | Cum | 3,531.8 | ₹63,678.35 |
| 1.03 | Brick workin foundation and plinth using bricks of class designation-75 in CM 1:6 | 228.72 | Cum | 4,698.68 | ₹10,74,682.09 |
| 1.04 | Brick work in super structure using bricks of
class designation-75 in CM 1:6 | 112.46 | Cum | 248.61 | ₹27,958.68 |
| 1.05 | DPC-Reinforced cement concrete work including curing compaction ,finishing withren deringin cement sandmortar1:3 and making good and jointsex cluding costof centering,shuttering and reinfor cementin1:1.5:3(1cement:1.5coursesand:3-graded stone aggre gate 20mm nominal size) | 86.94 | Cum | 5,582.69 | ₹4,85,359.07 |
| 1.06 | Providing and fabri cating reinforcement for RCC work including straightening, cutting, bending, placingin position and binding (including costof binding wire)in foundation and super structure upto4.5m height above plinthle velhot rolledde formed(IS:1139)cold twisted (IS: 1786) bars | 8,270 | kg | 97.94 | ₹8,09,963.8 |
| 1.07 | Centring and shuttering with plywood or steel
sheets including strutting, propping, bracing both ways
with wooden members | 567.35 | Sqm | 319.04 | ₹1,81,007.34 |
| 1.08 | cc on roof | 299.15 | Sqm | 849.32 | ₹2,54,074.08 |
| 1.09 | S & F Mosaic tile on roof | 299.15 | Sqm | 845.13 | ₹2,52,820.64 |
| 1.1 | 12mm thick plaster on new work including
curing and racking of joints in CM 1:6 | 985.64 | Sqm | 173.75 | ₹1,71,254.95 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.46 MB
biddocuemnt.pdf
Tender Documents • 9.85 MB
BOQ_1061636.xls
BOQ • 0.28 MB
datechange4.pdf
PDF • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .