Loading…
Loading…
Tender Value
₹1.9 L
EMD Value
₹3,760
Closing Date
10 Jul 2026, 6:00 pm2d left
EXECUTIVE ENGINEER REW DIVISION REASI
EXECUTIVE ENGINEER OFFICE REW DIVISION REASI, BLOCK NO. 2, ROOM NO. 205
Const. of R/w NHO Jughal Kishore upper bazar wno 2 pyt. Pouni Block Pouni Dist. Reasi under CDF for the year 2026-27
2026_RDPR_314468_5
e-NIT No. 32 of REW REASI of 2026-27
Open Tender
Civil Works
90 days
Reasi
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
MH 0515
₹3,760
3 Jul 2026
3 Jul 2026
11 Jul 2026
3 Jul 2026
10 Jul 2026
3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplusexcavated earth as directed:All Kind of Soil | 6.75 | Cum | 479.3 | ₹3,235.28 |
| 2 | Providing and laying in position dry stone aggregate 40 mm nominal size) | 1.5 | Cum | 1,500 | ₹2,250 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 21 | Cum | 5,733.6 | ₹1,20,405.6 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 41.59 | Sqm | 628.95 | ₹26,158.03 |
| 5 | Construction of CIB (Include concrete/Brick pedestal of size 3' x 2'. Platering ,painting all complete job as per direction of Engineer-in-charge | 1 | No. | 3,000 | ₹3,000 |
| 6Carriage of material from source to site of work by MT/AT including loading, unloading and stacking complete. | |||||
| 6.01 | Cement 2 KM by MT & 100mtr by AT . | 3.4 | MT | 299.07 | ₹1,016.84 |
| 6.02 | Sand & Stone Aggregate 28.0KM by MT & 100mtr by AT. | 43 | Cum | 742.62 | ₹31,932.66 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.56 MB
BOQ_1018302.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid