Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1ST₹25.4 LAccepted-AOC AT PO JAIPATNA GANDHIGRAMPADA PIN 766018 | KALAHANDI | ODISHA | 766018 | ₹25.4 L | 1ST | Accepted-AOC successful |
| 2 | Rejected-Technical | - | - | Rejected-Technical UNSUCCESSFUL |
| 3 | Rejected-Technical | - | - | Rejected-Technical UNSUCCESSFUL |
| 4 | Rejected-Technical | - | - | Rejected-Technical UNSUCCESSFUL |
| 5 | Rejected-Technical | - | - | Rejected-Technical UNSUCCESSFUL |
Tender Value
₹25.4 L
EMD Value
₹25,418
Closing Date
18 Apr 2026, 5:00 pmClosed
COMMISSIONER, SMC
Sambalpur Municipal Corporation,Durgapali, Sambalpur Odisha
Development of Crematorium at Centreline, Burla, Wno.05 under SMC, Sambalpur
2026_ORULB_127834_5
1/SMC_SBP/2026-27
Open Tender
Civil Works - Others
Percentage
90 days
SAMBALPUR MUNICIPAL CORPORATION
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹25,418
Yes
22 Jun 2026
9 Apr 2026
20 Apr 2026
9 Apr 2026
18 Apr 2026
9 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Earthwork in excavation of foundation in hard or gravelly soil with initial lead & lift including rough dressing & levelling the bed etc. complete. | - | cum | - | - |
| - | Supplying , filling Sand in F & P including cost, Conveyance & royalty of sand, cost of all labour, T & P, labour cess, watering, ramming etc. complete. | - | cum | - | - |
| - | Cement Concrete (1:4:8) using 4cm size B.H.G. (C. B.) Metal including cost, conveyance , royalty & taxes of all materials etc. complete | - | cum | - | - |
| - | R.C.C. M20 grade using 20mm and down graded size chips including cost conveyance etc. complete | - | cum | - | - |
| - | Cement concrete (1:2:4) using 12mm. size c.b.b.h.g chips including cost of all materials etc. complete. | - | cum | - | - |
| - | Rigid & smooth centering & shuttring for RCC works including false work & dismentling them after casting including cost of materials complete | - | cum | - | - |
| - | Supplying fitting fixing and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification | - | qntl | - | - |
| - | Brick work with Fly Ash Brick having crossing strength between 100kg/cm2 to149kg/cm2 in C.M.( 1:4) in foundation and plinth. | - | cum | - | - |
| - | Superstructure | - | cum | - | - |
| - | 12mm. thick cement plastering (1:6) | - | SQM | - | - |
stage.html
html • 0.07 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_587306.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_587306.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .