Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.5 LAccepted-Finance TUTICORIN | VIRUDHUNAGAR | TAMIL NADU | 626202 | L1 | Accepted-Finance BOQ Accepted | |
| 2 | L2₹14.2 L+₹74,300 (5.52%)Accepted-Finance | L2 | Accepted-Finance BOQ Accepted |
Tender Value
₹16.2 L
EMD Value
₹16,200
Closing Date
31 Mar 2022, 2:00 pmClosed
Chief Engineer/TTPS
O/o CE/TTPS
3-ICHP- Preventive mtce of conveyor-56,57,57A
2022_EB_227040_1
23-ICHP- Preventive mtce of conveyor-56,57,57A
Open Tender
Miscellaneous Works
Works
176 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹16,200
4 Apr 2022
23 Mar 2022
1 Apr 2022
23 Mar 2022
31 Mar 2022
23 Mar 2022
Clearing of spilled and accumulated coal and preventive mtce work in Conveyor-57,56,57A,BFD-10A and monitoring the conveyor equipments round the clock
Charges fir Clearing the spilled and accumulated coal then & there in the conveyor floor, tail and head end area, deck sheet, walkways, below the return belt area of conveyors BFD 10A, 56, 57 & 57A - including cost of required consumables, hire charges for T&P's lead & lift etc complete.
Charges for Round the clock monitoring of the equipments of running conveyors BFD 10A, 56, 57, 57A like belt train up, condition of conveyor belt joint, oil level checking in gear boxes & fluid couplings, counter weight position, chute deflector and liner plate and noticing defects if any in the above conveyors - Attending daily routine preventive maintenance work during idle time of conveyors like, renewal defective / worn out idler, frames, damaged skirt rubbers, patch up welding works in the chutes, deck sheets, minor patch up on belt store drawal and devolution works - Including cost of all kind of required consumables, hire charges for T & P’s lead & lift etc complete.
Charges for assisting works for belt joint in conveyor BFD 10A, 56, 57 & 57A including arresting the belt by providing clamps lifting the counter weight dismantling the idlers and idler frames and skirt board assembly and re-fixing the same after vulcanizing the joint including T&P hire charges cost of consumables etc., complete.
Charges for assisting works for pulley lagging works in conveyor BFD 10A, 56, 57 & 57A including arresting the conveyor belt lifting the counter weight and normalizing the system after pulley lagging, trail operation including T&P hire charges cost of consumables etc., complete.
Charges for overhauling and inspection of pulley bearings and replacement if necessary in tail pulley / tail snub pulley / bend pulley and take up moveable pulley in conveyor BFD 10A, 56, 57 & 57A including arresting the conveyor belt lifting the counter weight and normalizing the system after bearing overhauling, trial operation including the cost of consumables, T&P hire charges etc., complete.
Charges for overhauling and inspection of pulley bearings and replacement if necessary in head pulley / head snub pulley / drive pulley in conveyor BFD 10A, 56, 57 & 57A including arresting the conveyor belt lifting the counter weight and normalizing the system after pulley lagging, trial operation including T&P hire charges and cost of consumables etc., complete.
BANUMATHI ENTERPRISES
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .