Loading…
Loading…
Tender Value
₹57.3 L
EMD Value
₹57,300
Closing Date
24 Jun 2026, 5:00 pm7d left
PA ITDA Rayagada
PA ITDA Rayagada
Building work
2026_STSCD_131549_3
ITDARGDA01(D)/2026-27
National Competitive Bid
Civil Works - Buildings
180 days
Rayagada
Please refer to tender documents
3 documents required · 3 mandatory
₹10,000
₹57,300
Yes
10 Jun 2026
10 Jun 2026
25 Jun 2026
10 Jun 2026
24 Jun 2026
10 Jun 2026
10 Jun 2026 - 24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation of foundation in hard soil within initial lead of 50m and initial lift of 1.5m including dressing the sides, leveling the bed and depositing the excavated materials away from the work site, shoring etc if required, complete the item of work in all respect as per direction of the Engineer-in-charge. | 93.59 | 1 Cum | 276.9 | ₹25,915.07 |
| 2 | Filling foundation and plinth with filling sand laying in layers including ramming, watering, compacting including cost, conveyance and royalty of sand from approved quarry and other taxes if any with all leads, lifts, T&P etc complete the items of work in all respect as per specification and direction of Engineer in charge. | 128.28 | 1 Cum | 1,312.8 | ₹1,68,405.98 |
| 3 | Back filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5m. | 30.88 | 1 Cum | 153.8 | ₹4,749.34 |
| 4 | Supplying , diluting and and preparing chemical emulsion like CHLORPYRIPHOS or other chemicals approved by central Insecticides Board or as directed by the manufacturer and spraying the mixture uniformly by sprayer as pre-constructional anti termite treatment and creating a chemical barrier under and around wall trenches, basement excavation, top surface of plinth filling, junction of walls and floors along with external perimeter of the building, surrounding the pipes and conduits etc. complete at the rate of 7.5 litres ( or as directed by the manufacturer) per sqm on vertical and 5.0 liters per sqm on horizontal surfaces, 50% of the emulsion to be filled in the holes made in trenches at 150mm center to center etc. complete.as per IS:6313/1981 (PART-II) and as per the direction of engineer-in-charge including all cost of materials labour, taxes etc. all complete. | 119.03 | 1 SqM | 163.98 | ₹19,518.54 |
| 5 | CC (1:3:6) using 40 mm size and down graded crusher broken HG stone metal free from weathered surface of approved quality from approved quarry in foundation and plinth including laying concrete in layers with due compaction, watering and curing including cost, conveyance, royalty and taxes of all materials with all lead, lifts and delifts, T&P etc required for completion of the work in all respect as per direction of the Engineer-in-charge. | 40.12 | 1 Cum | 6,744.5 | ₹2,70,589.34 |
| 6 | Brick work with Flyash bricks of size 23 cm X 11 cm X 8 cm having crushing strength between 100 kg/cm2 to 149 kg/cm2 in cement mortar (1:6) in foundation & plinth including cost, conveyance, royalty, taxes of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge. | 13.81 | 1 Cum | 5,828.5 | ₹80,491.59 |
| 7 | Brick work with Flyash bricks of size 23 cm X 11 cm X 8 cm having crushing strength between 100 Kg/cm2 to 149 kg/cm2 in cement mortar (1:6) in superstructure including cost, conveyance, royalty, taxes of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge.
a) Ground Floor | 31.12 | 1 Cum | 5,861.8 | ₹1,82,419.22 |
| 0.9 | b) First Floor | 26.28 | 1 Cum | 6,240.2 | ₹1,63,992.46 |
| 0.0 | c) Terrace floor | 15.04 | 1 Cum | 6,297 | ₹94,706.88 |
| 8 | Brick work with Flyash bricks of size 23 cm X 11 cm X 8 cm having crushing strength between 100 kg/cm2 to 149 kg/cm2 in cement mortar (1:4) in foundation & plinth including cost, conveyance, royalty, taxes of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge.
a) Ground Floor | 5.77 | 1 Cum | 6,076.7 | ₹35,062.56 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 9.83 MB
Tendernotice_2.pdf
PDF • 1.01 MB
Construction_of_twin_type_staff_quarter_at_EMRS_Siriguda.pdf
Tender Documents • 0.35 MB
BOQ_595544.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid