Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.8 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹31.0 L+₹1.1 L (3.75%)Rejected-Finance 139 B B SEN ROAD CHANDANNAGAR HOOGHLY WEST BENGAL 712136 | CHANDANNAGAR | HOOGHLY | WEST BENGAL | 712136 | L2 | Rejected-Finance Being higher bid value | |
| 3 | L3₹31.1 L+₹1.2 L (4.17%)Rejected-Finance | L3 | Rejected-Finance Being higher bid value | |
| 4 | L4₹31.2 L+₹1.3 L (4.38%)Rejected-Finance 89A UPEN BANERJEE ROAD PARNASREE BEHALA KOLATA 700060 WEST BENGAL | KOLKATA | WEST BENGAL | 700060 | L4 | Rejected-Finance Being higher bid value | |
| 5 | L5₹31.4 L+₹1.6 L (5.19%)Rejected-Finance P 21 MANAS BAG KOLKATA 700 056 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700056 | L5 | Rejected-Finance Being higher bid value |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
25 Nov 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE ALIPORE KOLKATA
NO 1 NATIONAL LIBRARY AVENUE, ALIPORE, KOLKATA 700027
REMOVAL OF VEGETATION AND PERIODICAL SERVICES IN OTM AND MD ACCN INCLUDING MISC B/R WORKS AT TURF VIEW COMPLEX AND OLD IMH COMPLEX UNDER GE ALIPORE KOLKATA
2022_MES_561448_1
GE/ALP (8101B) OF KOLKATA 2022-23
Open Tender
Civil Works
Item Rate
180 days
GE ALIPORE KOLKATA
Class D and category a (i)
9 documents required · 9 mandatory
₹500
GARRISON ENGINEER ALIPORE
₹60,000
Yes
GE ALIPORE
13 Dec 2022
4 Nov 2022
3 Dec 2022
4 Nov 2022
25 Nov 2022
18 Nov 2022
4 Nov 2022 - 11 Nov 2022
12 Nov 2022
Amount
Taking down plaster in cement mortar on brick or stone walls etc including racking out joints, hacking for key, scrubbing down with water etc including necessary scaffolding upto 12 storey high building. Complete all as specified and as directed.
Material and labour for 15 mm thick rendering on fair faces of brick work in cement mortar (1:6) and finished the surfaces even and smooth without using extra cement upto 12 storey high bldg etc complete all as specified and as directed by the Engr-in-Charge.
Material and labour for 5mm thick rendering in cement mortar (1:3) on concrete surfaces as in ceiling and finishing the surfaces even and smooth with out using extra cement upto 12 storey high building etc complete all as specified and as directed by the Engr-in-Charge.
Material and labour for 15mm thick rendering on fair faces of brick work or concrete surfaces in cement mortar (1:4) and finished the surface even and smooth with applying WPC in shaft area incl scaffolding upto 12 storey height building complete all as specified and directed.(Note : WPC shall be measured and paid separately)
Material and labour preparation on new plastered surfaces of wall and applying two coats of cement base paint over a coat of primer complete all as specified and directed.(Upto 12 storey building)
Material and labour preparation on new plastered surfaces of wall and applying two coats of anti-algae and anti-fungal exterior grade weather coat paint over a coat of primer complete all as specified and directed. (Upto 12 storey building)
Material and labour for preparation of old decorated surfaces by complete removal of existing surface brooming down or steel wire brushing scrapping down smoke soot and greasy spots and applying two coat of cement base paint on walls complete all as specified and directed. (Upto 12 storey building)
Material and labour for complete removal of old decorated surfaces by brooming down or steel wire brushing, scrapping down smoke soot, moulds,et and applying one coat of cement base paint on walls complete all as specified and directed. (Upto 12 storey building)
Material and labour for Preparation of old plastered surfaces and applying one coat of oil bound distemper on walls complete all as specified and as directed by the Engr-in-Charge.
Material and labour for Preparation of old plastered surfaces and applying one coat of imulsion paint on walls complete all as specified and as directed by the Engr-in-Charge.
Material and labour for preparation of old decorated surfaces by brooming down or steel wire brushing, scrapping down smoke soot, moulds,etc and applying one coat of anti-algae and anti-fungal exterior grade weather coat paint complete all as specified and as directed. (Upto 12 storey building)
Material and labour preparation of old decorated surfaces by brooming down or steel wire brushing, scrapping down smoke soot, moulds,et and applying one coat of white wash on walls complete all as specified and as directed.
Material and labour preparation of old decorated surfaces by brooming down or steel wire brushing, scrapping down smoke soot, moulds,etc and applying one coat of white wash on ceilings complete all as specified and as directed.
Material and labour complete removal of old decorated surfaces by brooming down or steel wire brushing, scrapping down smoke soot, moulds,etc and applying two coats of weather coat paint complete all as specified and as directed. (Upto 12 storey building)
Material and labour for preparation of old steel surfaces of any description over 10 cm width or girth and applying one coat of synthetic enamel paint complete all as specified and as directed.
Material and labour for preparation of old wooden surfaces of any description over 10 cm width or girth and applying one coat of synthetic enamel paint complete all as specified and as directed.
Removal of plants, shurbs, weeds upto 4.5 ft height complete incl roots dia nexc 25mm chajja/shaft/masonry at any height incl applying root killar poeder(copper sulphate) asper manufacturers instructions including all necessary scafolding as per requirement to execution of work with safty precaution and removing of rubbish/ spoil outsideMOD land/area complete all as specified and as directed (upto 12 story building).
All as per item No 17 above but dia of vegetation exc 25mm but not exc 75mm etc complete all as specified and directed.
Preparation of old surface including brooming down or steel wire brushingf, scrapping down smoke shoot, mould ,moss and efflorocentsalts and trading oil and greasy spots in place remove the vegetation with using root killar powder where vegetation removal to be done upto 12 story bldg including all necessary scafolding as per requirement to execution of work with safty precaution and removing of rubbish/ spoil outsideMOD land/area complete all as specified and as directed
Supply and fixing 2mm thick wall care putty on wall/ceiling complete all as specified and as directed by Engineer-in-charge.
Dismantling bitumenous felt/old water proofing treatment of any type and disposed of the same complete all as specified and as directed.
Material and labour for 15mm thick screed bed or bedding layer in cement mortar(1:4) mixed with WPC as per manufacturer instruction for laying of water proofing membrane complete all as specified and as directed by the Engr-in-Charge.
Supply only liquid integral water proofing compound as per manufactures instruction etc complete all as specified and as directed by the Engr-in-Charge.
Material and labour for PCC (1:2:4) type B0 (using 12.5mm graded stone aggregate), as roof kerbs/pading, with water proofing compound etc complete all as specified and as directed.
Material and labour in repair for water proofing treatment with APP based polymeric membrane minimum weight 3Kg/sqm and 3mm thick reinforced with polyster non oven fabric laid on primed surface by force application consist of following all as specifeid : (i) Applying one coat of bituminous primer conforming to [email protected] litr per sqm (ii)Laying of APP based mambrane as specified thickness (iii)Applying one coat of bitumen grade85/25 @1.2Kg/sqm (iv) Applying two coats of aluminium paints @100ml/Sqm complete all as specified and as directed.
Taking down Eaves gutter, rain water pipes(any size and pattern) including all fitting,bends, shoes, swan neck etc inculing cleaning and removing from site etc complelete all as specified and as directed.
Supply and fixing for 110mm PVC (SWR) pipes single socketed, in any length with rubber ring joints, fixed to wall complete all as specified and as directed.
Supply and fixing for 75mm PVC (SWR) pipes single socketed, in any length with rubber ring joints, fixed to wall complete all as specified and as directed.
Supply and fixing for 110mm PVC (SWR) bends any radius. complete all as specified and as directed.
Supply and fixing for 75mm PVC (SWR) bends any radius. complete all as specified and as directed.
Supply and fixing for 110mm PVC (SWR)junction with acsses door any radius. complete all as specified and as directed.
Supply and fixing for 75mm PVC (SWR) junction with acsses door any radius. complete all as specified and as directed.
CHATTERJEE CONSTRUCTION
ESS PEE UDYOG
M/S AVIJEET INTERNATIONAL
THE PLANTERS ENGINEERING CORPORATION
DIPAK ENTERPRISE
DK Contractor
SENCO
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .