Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 LAccepted-AOC | ₹7.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹7.8 LRejected-AOC | ₹7.8 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | GOLD CONSTRUCTION L2 | SAI BABA CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, Conveyance of surplus earth upto 2Km etc., complete complying with standard specification. | |||||
| 1.01 | For Column | 31.95 | cum | 208.6 ₹6,664.77 | 205.1 ₹6,552.95 Lowest |
| 1.02 | For Beam | 6.08 | cum | 105.8 ₹643.26 | 102.3 ₹621.98 Lowest |
| 2.00 | Supplying and filling in foundation and basement with River sand in layers of not more than 15cm thick well rammed, watered and consolidated etc., complete complying with standard specification. | 2.97 | cum | 1,547.16 ₹4,595.07 | 1,543.66 ₹4,584.67 Lowest |
| 3.00 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying water carrying with all leads of good water compacting and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 2.97 | cum | 5,107.7 ₹15,169.87 | 5,104.2 ₹15,159.47 Lowest |
| 4.00Suppying and erecting shuittering including necessary supports for plane surface in foundation and basement for RCC roof slabbeams , column footing, plinth beam, grade beam, criical piers, sill slabs, steps, etc using suitable mild steel sheets of B. G. 10 stiffened with welded suitable mild steel angles for boardings supported by casuarina props 10cm to 13cm dia spaced at suitable intervals etc complete as directed by thr deopartmental officetrs complying with standard specifications. | |||||
| 4.01 | Column | 46.8 | sqm | 1,230.6 ₹57,592.08 | 1,227.1 ₹57,428.28 Lowest |
| 4.02 | Beam | 24.3 | sqm | 497 ₹12,077.1 | 493.5 ₹11,992.05 Lowest |
| 4.03 | Lintel | 16.2 | sqm | 1,026 ₹16,621.2 | 1,022.5 ₹16,564.5 Lowest |
| 5.00 | Supplying and fabricating in position of MS or RTS rods for RCC work including the cost of steel and binding wire and all labour charges for cutting bending tying grill and stengthening and all labour chrges including the fabeication charges etc complete. | 1.68 | Mt | 89,886.5 ₹1,51,009.32 | 89,883 ₹1,51,003.44 Lowest |
Tender Value
₹8 L
EMD Value
₹8,000
Closing Date
20 Feb 2026, 3:00 pmClosed
Commissioner
Tiruvannamalai City Municipal Corporation
Construction of compound wall at Amaravathi Murugaiyyan School in Tiruvannamalai City Municipal Corporation.
2026_MAWS_653979_1
0831/2026/E1
Open Tender
Civil Works
Works
30 days
Tiruvannamalai City Municipal Corporation
REFER TENDER NOTICE
2 documents required · 2 mandatory
₹0
₹8,000
24 Aug 2026
10 Feb 2026
20 Feb 2026
10 Feb 2026
20 Feb 2026
10 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, Conveyance of surplus earth upto 2Km etc., complete complying with standard specification. | |||||
| 1.01 | For Column | 31.95 | cum | - | - |
| 1.02 | For Beam | 6.08 | cum | - | - |
| 2 | Supplying and filling in foundation and basement with River sand in layers of not more than 15cm thick well rammed, watered and consolidated etc., complete complying with standard specification. | 2.97 | cum | - | - |
| 3 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying water carrying with all leads of good water compacting and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 2.97 | cum | - | - |
| 4Suppying and erecting shuittering including necessary supports for plane surface in foundation and basement for RCC roof slabbeams , column footing, plinth beam, grade beam, criical piers, sill slabs, steps, etc using suitable mild steel sheets of B. G. 10 stiffened with welded suitable mild steel angles for boardings supported by casuarina props 10cm to 13cm dia spaced at suitable intervals etc complete as directed by thr deopartmental officetrs complying with standard specifications. | |||||
| 4.01 | Column | 46.8 | sqm | - | - |
| 4.02 | Beam | 24.3 | sqm | - | - |
| 4.03 | Lintel | 16.2 | sqm | - | - |
| 5 | Supplying and fabricating in position of MS or RTS rods for RCC work including the cost of steel and binding wire and all labour charges for cutting bending tying grill and stengthening and all labour chrges including the fabeication charges etc complete. | 1.68 | Mt | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_784213.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].