Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹67 L
EMD Value
₹5.3 L
Closing Date
25 Nov 2026, 12:00 pm3d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
ee pd jaunpur
ee pd jaunpur
Construction and maintenance work of Vikash khand khutahan ke Nuruddinpur me Trikoliya akhandnagar marg ke km 3 se yadav basti via maurya basti tak link road including 05 years maintenance
2026_CEUVZ_1210024_2
3909/8A date 12-10-2026
Open Tender
Civil Works
Fixed-rate
120 days
jaunpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹5.3 L
19 Nov 2026
19 Nov 2026
25 Nov 2026
19 Nov 2026
25 Nov 2026
19 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) | 3,000 | Cum | 72 | ₹2,16,000 |
| 2 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on preared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achive the desired denisty, complete as per Technical Specification clause 401. (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) | 145 | Cum | 2,815 | ₹4,08,175 |
| 3 | Providing, laying, spreading and compacting stone aggregates of specific sizes 53mm to 22.4mm to water bound macadam (G-3) specification including spreading in uniform loose thickness hand packing, rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming, Stone dust to fill-up the interstices of coarse aggregate, watering and compacting 7.50 cm thickness to the required density Grading 3 as per Technical Specification Clause 405. . (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) | 270 | Cum | 3,540 | ₹9,55,800 |
| 4 | Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30 (Grade), coarse and fine aggregates conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete withshovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) | 540 | Cum | 8,590 | ₹46,38,600 |
| 5 | Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) | 700 | Cum | 61 | ₹42,700 |
| 6.1 | The routine maintenance of above road work including pavement, road sides and cross drains, surface drains to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the Completion Date and ends after five years. For 1st Year Maintenance charge @ 0% of Sub toal of Part-A work done (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) | 1.2 | Km | - | - |
| 6.2 | The routine maintenance of above road work including pavement, road sides and cross drains, surface drains to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the Completion Date and ends after five years. For 2nd Year Maintenance charge @ 0.25% (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) | 1.2 | Km | 13,044.32 | ₹15,653.18 |
| 6.3 | The routine maintenance of above road work including pavement, road sides and cross drains, surface drains to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the Completion Date and ends after five years. For 3rd Year Maintenance charge @ 0.50% (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) | 1.2 | Km | 26,088.65 | ₹31,306.38 |
| 6.4 | The routine maintenance of above road work including pavement, road sides and cross drains, surface drains to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the Completion Date and ends after five years. For 4th Year Maintenance charge @ 0.75% (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) | 1.2 | Km | 39,132.97 | ₹46,959.56 |
| 6.5 | The routine maintenance of above road work including pavement, road sides and cross drains, surface drains to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the Completion Date and ends after five years. For 5th Year Maintenance charge @ 1.00% (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) | 1.2 | Km | 52,177.29 | ₹62,612.75 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.08 MB
BOQ_2297761.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .