Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2,346.84Admitted-Finance | -28.00% | ₹2,346.84 | L1 | Admitted-Finance |
| 2 | L2₹3,031.34+₹684.50 (29.2%)Admitted-Finance | -7.00% | ₹3,031.34+₹684.50 (29.2%) | L2 | Admitted-Finance |
| 3 | L3₹3,389.88+₹1,043.04 (44.4%)Admitted-Finance | +4.00% | ₹3,389.88+₹1,043.04 (44.4%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
13 Jul 2026, 10:00 amClosed
E.O
Municipal Board Sumerpur
civil work
2026_DLB_571244_1
3073-3075 date 25-06-2026
Open Tender
Civil Works
Percentage
365 days
sumerpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
MD RISL
₹20,000
Yes
20 Jul 2026
29 Jun 2026
13 Jul 2026
29 Jun 2026
13 Jul 2026
29 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing laying, spreading and compacting stone aggregates of specific sizes as per Table 400-7 to Water Bound Macadam specification including spreading in uniform thickness; hand packing,rolling with power roller 8-10 tonnes, in stages to proper grade and camber, applying and brooming requisite type of screening (Table 400-8) binding materials to fill up the interstices of coarse aggregates, watering (with water browser) and compacting to required density, making necessary earthen bund to protect edges as per clause 404 of MoRT&H specification including all material,labour, machinery, lighting, guarding and maintenance of diversion complete.Crusher broken - Grade-III (53-22.4mm) | - | cum | - | - |
| 2 | Providing, laying, spreading and compacting of granular sub-base byproviding close graded material (Table 400-1), spreading in uniformlayers with motor grader on prepared surface, mixing by mix in placemethod with rotavator at OMC, and compacting with vibratory rollerto achieve the desired density, complete as per MoRT&H specification clause - 401 including all material, labour, machinery, lighting, guarding and maintenance of diversion. | - | cum | - | - |
| 3 | Construction of subgrade and earthen shoulders with approved
material obtained from borrow area with all lifts & leads, transporting to site, spreading, grading to required slope and compacted in layers not exceeding 200mm thickness at OMC, with vibratory roller of 80-100 KN static weight or more to attain a density 97% maximum dry density to meet requirement of table No. 300-2 as per MoRT&H specification clause 305. (Lead taken upto 5 km) | - | sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
BOQ_1016315.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .