| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 CrAccepted-AOC | ₹5.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹5.6 Cr+₹15.7 L (2.86%)Rejected-Finance | ₹5.6 Cr+₹15.7 L (2.86%) | L2 | Rejected-Finance L2 |
| 3 | L3₹5.8 Cr+₹34.8 L (6.35%)Rejected-Finance | ₹5.8 Cr+₹34.8 L (6.35%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | M/S BABA TRADERS L2 | M/s AJAY KUMAR SAHI L3 | M/S DEEPENDRA PAL THEKEDAR L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavaton work in excavation. Dry Earthwork in foundation building work including lead up to 30M and lift upto 1.5M and its disposal. As directed by Engineer-in charge. All kinds of soil | 1,402.99 | CUM | 70 ₹98,209.3 Lowest | 70 ₹98,209.3 Lowest | 70 ₹98,209.3 Lowest |
| 2.00 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 70.00 Kms. From the site of work including watering, dressing etc. labour & T &P etc. required for proper completion of work saplings of girth upto 30 ground level and removal of rubbish upto a distance of 50m out side the periphery of area cleared. under floor Local Sand. | 41.65 | CUM | 1,200 ₹49,980 Lowest | 1,550 ₹64,557.5 | 1,500 ₹62,475 |
| 3.00 | Plain cement concrete with stone ballast/brick ballast excluding cost of material but inclusive of labour and T&P etc excluding Shuttering.
Plain cement concrete as per item-1 with 20% plum with stone ballast excluding cost of material but including of labour and T&P.
(b) mechanical mixing + Labour cost. (M15) (1:2:4) | 54.73 | CUM | 7,000 ₹3,83,110 Lowest | 8,000 ₹4,37,840 | 7,000 ₹3,83,110 Lowest |
| 4.00 | Cement concrete with stone grit in RCC work excluding all cost of material but inclusive of labour and T&P and also excluding centering, shuttering and reinforcement.
(b) mechanical mixing and Extra for mechanical vibration with 1% water charges.
Total Concrete work for structure. (M25) (1:1:2) | 656.63 | CUM | 9,100 ₹59,75,333 | 9,250 ₹60,73,827.5 | 8,500 ₹55,81,355 Lowest |
| 5.00 | Thermo-Mechanically Treated bars work such as in reinforced concrete or reinforced brick work (when not included in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage. | 523 | QUINTELS | 6,700 ₹35,04,100 | 6,400 ₹33,47,200 | 6,000 ₹31,38,000 Lowest |
| 6.00 | Backfilling the footings, Earthwork by power Transport for a lead of up to 1 Km. including excavation loading, unloading, stacking, manual compaction & dressing including all lift shall be applicable for lead up to 1 Km. Excluding Royalty.
Upto 10 km extra lead. | 861.02 | CUM | 275 ₹2,36,780.5 | 250 ₹2,15,255 Lowest | 300 ₹2,58,306 |
| 7.00Centering and shuttering including strutting, propping etc. and removal of form for | ||||||
| 7.01 | Foundations, footings, bases of columns, etc. for mass concrete | 547.34 | SQM | 250 ₹1,36,835 | 240 ₹1,31,361.6 Lowest | 250 ₹1,36,835 |
| 7.02 | Suspended floors, roofs, landings, balconies and access platform. | 1,604.59 | SQM | 600 ₹9,62,754 | 490 ₹7,86,249.1 Lowest | 525 ₹8,42,409.75 |
| 7.03 | Lintels, beams, plinth beams, girders, brassumers and cantilevers | 1,031.55 | SQM | 475 ₹4,89,986.25 | 410 ₹4,22,935.5 Lowest | 500 ₹5,15,775 |
Tender Value
₹6.7 Cr
EMD Value
₹13.4 L
Closing Date
5 Mar 2026, 3:00 pmClosed
S.E, Irrigation Construction Circle, Basti
S.E, Irrigation Construction Circle, Basti
Construction work of Office Building of Chief Engineer Level-1(East) and Chief Enginner (Gandak) Located in Saryu Nahar Colony District Gorakhpur.
2026_UPIDC_1119556_1
10/S.E/2025-26
Open Tender
Civil Works - Buildings
Item Wise
365 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹9,884
₹13.4 L
23 Mar 2026
23 Feb 2026
5 Mar 2026
23 Feb 2026
5 Mar 2026
24 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavaton work in excavation. Dry Earthwork in foundation building work including lead up to 30M and lift upto 1.5M and its disposal. As directed by Engineer-in charge. All kinds of soil | 1,402.99 | CUM | - | - |
| 2 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 70.00 Kms. From the site of work including watering, dressing etc. labour & T &P etc. required for proper completion of work saplings of girth upto 30 ground level and removal of rubbish upto a distance of 50m out side the periphery of area cleared. under floor Local Sand. | 41.65 | CUM | - | - |
| 3 | Plain cement concrete with stone ballast/brick ballast excluding cost of material but inclusive of labour and T&P etc excluding Shuttering.
Plain cement concrete as per item-1 with 20% plum with stone ballast excluding cost of material but including of labour and T&P.
(b) mechanical mixing + Labour cost. (M15) (1:2:4) | 54.73 | CUM | - | - |
| 4 | Cement concrete with stone grit in RCC work excluding all cost of material but inclusive of labour and T&P and also excluding centering, shuttering and reinforcement.
(b) mechanical mixing and Extra for mechanical vibration with 1% water charges.
Total Concrete work for structure. (M25) (1:1:2) | 656.63 | CUM | - | - |
| 5 | Thermo-Mechanically Treated bars work such as in reinforced concrete or reinforced brick work (when not included in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage. | 523 | QUINTELS | - | - |
| 6 | Backfilling the footings, Earthwork by power Transport for a lead of up to 1 Km. including excavation loading, unloading, stacking, manual compaction & dressing including all lift shall be applicable for lead up to 1 Km. Excluding Royalty.
Upto 10 km extra lead. | 861.02 | CUM | - | - |
| 7Centering and shuttering including strutting, propping etc. and removal of form for | |||||
| 7.01 | Foundations, footings, bases of columns, etc. for mass concrete | 547.34 | SQM | - | - |
| 7.02 | Suspended floors, roofs, landings, balconies and access platform. | 1,604.59 | SQM | - | - |
| 7.03 | Lintels, beams, plinth beams, girders, brassumers and cantilevers | 1,031.55 | SQM | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.49 MB
Lot_1.pdf
Tender Documents • 4.65 MB
BOQ_2081836.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .