| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.8 CrAccepted-AOC 10 1 JAMIR LANE BALLYGUNGE KOLKATA 700019 | KOLKATA | KOLKATA | WEST BENGAL | 700019 | ₹30.8 Cr | L1 | Accepted-AOC 1st lowest |
| 2 | L2₹32.5 CrRejected-Finance BC 32 GROUND FLOOR SECTOR I BNCC POST OFFICE SALT LAKE CITY NORTH 24 PARGANAS WEST BENGAL 700064 UDYAM WB 14 0023252 | 24 PARAGANAS NORTH | WEST BENGAL | 700064 | ₹32.5 Cr | L2 | Rejected-Finance Higher than 1st lowest |
| 3 | L3₹39.4 CrRejected-Finance | ₹39.4 Cr | L3 | Rejected-Finance Higher than 1st lowest |
| 4 | L4₹40.4 CrRejected-Finance 18A PARK STREET 6 0 1 STEPHEN COURT LIFT NO 1 KOLKATA WB 700071 | KOLKATA | KOLKATA | WB | 700071 | ₹40.4 Cr | L4 | Rejected-Finance Higher than 1st lowest |
Tender Value
₹32.9 Cr
EMD Value
₹50 L
Closing Date
11 Jun 2025, 4:00 pmClosed
SUPERINTENDING ENGINEER, WC III
Office of The SE, WC III, I and W Dte, Pairatungi, Abas Bari, Purba Medinipur, PIN 721636
Construction of R.C.C Bridge over Kaliaghai River at Langalkanta within G.P. Bishnupur, Block and P.S Sabang, Dist. Paschim Medinipur. 2nd Call
2025_IWD_848954_1
WBIW/SE/WC-III/NIT-4e/2025-26
Open Tender
CIVIL WORKS
Percentage
1080 days
Block- Sabang
As per NIT
5 documents required · 5 mandatory
₹50 L
Yes
Office of The SE, WC III, I and W Dte, Pairatungi,
24 Aug 2026
21 May 2025
17 Jun 2025
21 May 2025
11 Jun 2025
26 May 2025
26 May 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge. II. In all sorts of soil excluding marshy soil & rocks (soft or hard) by mechanical means (using excavator of suitable capacity). | |||||
| 1.01 | Depth upto 3 m
Without pumping out water | 1,366 | Cum | 56.01 | ₹76,509.66 |
| 1.02 | Depth 3 m to 6m
With pumping out water | 1,728 | Cum | 65.55 | ₹1,13,270.4 |
| 2 | Providing Bored Cast-in-situ R.C.C. pile in position as per specifications in all kinds of soil including cost of boring using drilling mud to stabilize the bore and flushing the bore of excess mud with freshly prepared drilling fluid by using pumps prior to placing concrete by tremie pipe in one continuous operation and including the cost of all materials and labour for placing of concrete and also including the cost of mobilization and hire charges of all equipment necessary for boring, welding of reinforcement cage as necessary and lowering of reinforcement cage, preparation and placing of concrete, including the cost of concrete but excluding the cost of reinforcement and labour for bending binding etc. complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. Work to be executed as per IS: 2911 (Part II Sec 2)
Using hydraulic pilling rig
Pile diameter - 1200 mm. | 3,530 | Meter | 15,392.84 | ₹5,43,36,725.2 |
| 3 | Pile Load Test on single Vertical Pile in accordance with IS:2911(Part-4)
(Reference to MORT&H's specification 1113).
Initial and routine load test
(Note - Although, this item is incidental to work and is not required to be included in BOQ of contract, the same is required to be added in the estimate to assess cost of work.) | 945 | MT | 553.07 | ₹5,22,651.15 |
| 4 | Cement Concrete for Reinforced Concrete in Pile Cap complete as per drawing and Technical Specification.
RCC Grade M35
Using concrete mixer | 1,506 | Cum | 8,005.34 | ₹1,20,56,042.04 |
| 5 | Supplying, fitting and placing un-coated HYSD bar reinforcement in Bridge Foundation including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications and direction of Engineer-in-charge. | 882 | Tonne | 72,850.48 | ₹6,42,54,123.36 |
| 6 | Providing MS casing pipe around RCC cast-in-situ bored piles of different diameters in position including cost of all materials, fabrication, handling etc. complete as per direction of Engineer-in- Charge.
Steel materials : Steel plates : (E 250 conforms to IS:2062-2006)
6 – 10 mm. | 258 | M.T. | 72,862.01 | ₹1,87,98,398.58 |
| 7 | Sand filling in foundation trenches and at the back of abutments, wing-walls etc. with good local sand free from earth in layers not exceeding 15 cm.including inundating each layer by profuse water and poking and ramming layer by layer complete including supply of sand. Quality of sand is to be approved by the Engineer-in-charge. | 1,489 | Cum | 773.82 | ₹11,52,217.98 |
| 8 | Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, cross drain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction.
Where staging is required | 879 | Sqm | 421.9 | ₹3,70,850.1 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].