Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 LAccepted-Finance BENARSI DAS AJAY PAL SINGH 413B MOH BENARSIDAS AURAIYA AURAIYA UTTAR PRADESH 206122 | AURAIYA | UTTAR PRADESH | 206122 | ₹6.1 L | L1 | Accepted-Finance LOWER BID |
| 2 | L2₹6.2 L+₹9,730 (1.60%)Rejected-Finance | ₹6.2 L+₹9,730 (1.60%) | L2 | Rejected-Finance HIGHER BID |
Tender Value
₹5.9 L
EMD Value
₹58,600
Closing Date
21 Dec 2021, 3:00 pmClosed
EXECUTIVE ENGINEER MGCCD 9 SAMBHAL
MGCCD 9 SAMBHAL
CONSTRUCTION OF V.R.B. AT KM. 4.574 OF MOHAMMADPUR TANDA MINOR
2021_UPIDC_655019_1
03/EE/2021-22
Open Tender
Civil Works - Canal
Item Rate
60 days
SAMBHAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹58,600
27 Apr 2026
13 Dec 2021
21 Dec 2021
13 Dec 2021
21 Dec 2021
13 Dec 2021
Amount
Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into the plinth with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour, all T & P, leads and lift etc
Ordinary centering and shuttering or steel shuttering for C.C. work
Laying C.C. 1:2:4 Mix (M-15) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering.
Laying C.C. 1:6:12 Mix cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering.
Brick work in 1:4 cement mortar in Abutment, Wing wall & Parapet etc.up to 3 m lift and 60 M lead including cost of all material, labour and T&P required for proper completion of work.
Cement pointing in 1:2 cement mortar (struck deep) on brick masonary including cost of all material, labour and T&P etc. required for proper completion of work.
Centering and shuttering (steel shuttering) for R.C.C. work up to 3.0 m height including cost of all labour, material and T&P etc. required for proper completion of work.
Reinforcement including cutting, bending & binding in position including cost of bindingwire and also including all cost of labour, material and T&P etc. required for proper completion of work.
R.C.C. M-20(1:1.5:3) with cement, coarse sand & 20 mm down graded stone grit in deck slab and approach slab including cost of material, labour T&P etc. but excluding cost of centering shuttering and reinforcement required for proper completion of work.
Laying R.C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 20 mm down graded stone grit in wearing coat including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement.
Supplying and fixing 75 mm dia P.V.C. pipe for weep holes with inverted filter behind abutment including cost of all material, labour and T&P etc. required for proper completion of work.
Providing and fixing Drainage Spouts (100 mm dia) complete as per drawing including cost of all material, labour and T&P etc. required for proper completion of work.
Providing & Fixing in position Bituminous paper bearing (Tarfelt) as per direcrion of Engineer in charges giving a coat of approved mastic paint below the rarfelt and including supply of materials labour and T&P etc. required for proper completion of the work.
S/F of steel expansion joint with filler board in deck slab and wearing coat including all labor & T&P etc. rquired for proper completion of work.
Supplying and fixing wheel guard size 150 x 150 x 900 mm with cost of all material, labour and T&P required for proper completion of work.
Earth work in making ramp on approach road by power transported earth with a lead beyond 200 m and upto 1.00 Km. including excavation, loading, unloading, royalty, manual compaction, dressing and all lifts complete required for proper completion of work.
Brick on edge soling on approach Road including cost of all material, labour and T&P etc. required for proper completion of work .
Supplying and fixing marble year name plate of size 300mmx200mmx25mm with engraved letter including cost of all material, labour and T&P etc. required for proper completion of work.
M/S BALAJI ENTERPRISES CONTRACTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
cancelled_1.pdf
pdf • 0.27 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.71 MB
BOQ_1033697.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .