Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 CrAdmitted-Finance | ₹2.6 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | K KRISHNAMOORTHY BHAT L1 |
|---|---|---|---|---|
| 1.00 | 1. Sri Ganapathi Temple
Earthwork in surface excavation for foundation of buildings, culverts water supply, sanitary lines and electrical conduits either in pits or in trenches 1.5m. and above width, in hard soil not exceeding 1.5m. in depth including dressing the bottom and sides of pits and trenches stacking the excavated soil clear from edges of excavation with lead after breaking of clods with all lifts and lead including all labour, hire charges of all machineries with all other incidental charges etc., complete and as per the direction of the Engineer-In-Charge for successful completion of work. | 93.81 | Cum | - |
| 2.00 | Providng and Filling in Foundation with Granite/Trap broken metal 100mm and down size with approved sand , including hand packing , ramming watering,including cost of all materials and labour with all lifts and lead including all labour, hire charges of all machineries with all other incidental charges etc., complete and as per the direction of the Engineer-In-Charge for successful completion of work. | 85.48 | Cum | - |
| 3.00 | Providing and laying in position plain cement concrete of mix M 1:4:8 with OPC cement @ 180kgs, with 40mm and down size graded granite metal coarse aggregates @ 0.85cum and fine aggregates @ 0.57cum machine mixed, machine mixed, concrete laid in layers not exceeding 15cms thick well compacted, in foundation and plinth, including cost of all materials, labour HOM of machinery, curing, complete as per specifications. with all lifts and lead including all labour, hire charges of all machineries with all other incidental charges etc., complete and as per the direction of the Engineer-In-Charge for successful completion of work. | 9.08 | Cum | - |
| 4.00 | Providing and constructing granite/trap/basalt size stone masonry in foundation with cement mortor 1:6 stones hammered dressed in courses not less than 20cm high , bond stones at 2m. part in each course including cost of materials, labour, curing, complete with all lifts and lead including all labour, hire charges of all machineries with all other incidental charges etc., complete and as per the direction of the Engineer-In-Charge for successful completion of work. | 88.22 | Cum | - |
| 5.00 | Providing and laying in position plain cement concrete of M20with OPC cement @ 240 Kgs., with 20mm and down size graded granite metal coarse aggregates @ 0.878 cum and fine aggregates @ 0.459 cum machine mixed, concrete laid in layers not exceeding 15cms thick well compacted, in foundation and plinth, including cost of all materials, labour, HOM of machinery, curing complete with all lifts and lead including all labour, hire charges of all machineries with all other incidental charges etc., complete and as per the direction of the Engineer-In-Charge for successful completion of work.(KSRB-4-1.6) | 23.82 | Cum | - |
| 6.00 | Providing ,supplying from Daddaballapura Quarry to workspot in Bannur Town and laying including quarrying of Doddaballapura stone slabs complete as per drawing, including hiring charges for chain and pully block transportation cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Adhisthana courses | 154.05 | Cum | - |
| 7.00 | Providing Dressing to stone members four line dressing for face and two line dressing to have fine joints complete as per drawing, including hiring charges HOM, cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Upapeeta / Base | 40.35 | Rmtr | - |
| 8.00 | Providing Dressing to stone members four line dressing for face and two line dressing to have fine joints complete as per drawing, including hiring charges HOM, cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work.Adhisthana 1st Course | 36.2 | Rmtr | - |
| 9.00 | Providing Dressing to stone members four line dressing for face and two line dressing to have fine joints complete as per drawing, including hiring charges HOM, cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work.Adhisthana 2 nd Course | 36.2 | Rmtr | - |
| 10.00 | Providing Dressing to stone members four line dressing for face and two line dressing to have fine joints complete as per drawing, including hiring charges HOM, cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Adhisthana3 rd Course | 36.2 | Rmtr | - |
Tender Value
₹1.9 Cr
EMD Value
₹2.9 L
Closing Date
18 Feb 2020, 1:00 pmClosed
EE NHD Bangalore
O/o EE NHD Bangalore
Construction of Sri Ganapathi Temple and Sri Bisilumaramma Temple at Bannur Town on SH 33 at Km 161 800 in Mysuru District in the State of Karnataka 3rd call
2020_MoRTH_537129_1
01 2019-20 3rd call 17.01.2020
Open Tender
Civil Works - Others
Item Rate
300 days
Bannur
As per Tende Document
3 documents required · 3 mandatory
₹5,900
As per NIT
₹2.9 L
Yes
2 May 2020
18 Jan 2020
19 Feb 2020
18 Jan 2020
18 Feb 2020
18 Jan 2020
Amount
1. Sri Ganapathi Temple Earthwork in surface excavation for foundation of buildings, culverts water supply, sanitary lines and electrical conduits either in pits or in trenches 1.5m. and above width, in hard soil not exceeding 1.5m. in depth including dressing the bottom and sides of pits and trenches stacking the excavated soil clear from edges of excavation with lead after breaking of clods with all lifts and lead including all labour, hire charges of all machineries with all other incidental charges etc., complete and as per the direction of the Engineer-In-Charge for successful completion of work.
Providng and Filling in Foundation with Granite/Trap broken metal 100mm and down size with approved sand , including hand packing , ramming watering,including cost of all materials and labour with all lifts and lead including all labour, hire charges of all machineries with all other incidental charges etc., complete and as per the direction of the Engineer-In-Charge for successful completion of work.
Providing and laying in position plain cement concrete of mix M 1:4:8 with OPC cement @ 180kgs, with 40mm and down size graded granite metal coarse aggregates @ 0.85cum and fine aggregates @ 0.57cum machine mixed, machine mixed, concrete laid in layers not exceeding 15cms thick well compacted, in foundation and plinth, including cost of all materials, labour HOM of machinery, curing, complete as per specifications. with all lifts and lead including all labour, hire charges of all machineries with all other incidental charges etc., complete and as per the direction of the Engineer-In-Charge for successful completion of work.
Providing and constructing granite/trap/basalt size stone masonry in foundation with cement mortor 1:6 stones hammered dressed in courses not less than 20cm high , bond stones at 2m. part in each course including cost of materials, labour, curing, complete with all lifts and lead including all labour, hire charges of all machineries with all other incidental charges etc., complete and as per the direction of the Engineer-In-Charge for successful completion of work.
Providing and laying in position plain cement concrete of M20with OPC cement @ 240 Kgs., with 20mm and down size graded granite metal coarse aggregates @ 0.878 cum and fine aggregates @ 0.459 cum machine mixed, concrete laid in layers not exceeding 15cms thick well compacted, in foundation and plinth, including cost of all materials, labour, HOM of machinery, curing complete with all lifts and lead including all labour, hire charges of all machineries with all other incidental charges etc., complete and as per the direction of the Engineer-In-Charge for successful completion of work.(KSRB-4-1.6)
Providing ,supplying from Daddaballapura Quarry to workspot in Bannur Town and laying including quarrying of Doddaballapura stone slabs complete as per drawing, including hiring charges for chain and pully block transportation cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Adhisthana courses
Providing Dressing to stone members four line dressing for face and two line dressing to have fine joints complete as per drawing, including hiring charges HOM, cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Upapeeta / Base
Providing Dressing to stone members four line dressing for face and two line dressing to have fine joints complete as per drawing, including hiring charges HOM, cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work.Adhisthana 1st Course
Providing Dressing to stone members four line dressing for face and two line dressing to have fine joints complete as per drawing, including hiring charges HOM, cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work.Adhisthana 2 nd Course
Providing Dressing to stone members four line dressing for face and two line dressing to have fine joints complete as per drawing, including hiring charges HOM, cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Adhisthana3 rd Course
Providing Dressing to stone members four line dressing for face and two line dressing to have fine joints complete as per drawing, including hiring charges HOM, cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Adhisthana 4 th Course
Providing Dressing to stone members four line dressing for face and two line dressing to have fine joints complete as per drawing, including hiring charges HOM, cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Pillar Base
Providing Dressing to stone members four line dressing for face and two line dressing to have fine joints complete as per drawing, including hiring charges HOM, cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Pillar Base
Providing Dressing to stone members four line dressing for face and two line dressing to have fine joints complete as per drawing, including hiring charges HOM, cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Pillar
Providing Dressing to stone members four line dressing for face and two line dressing to have fine joints complete as per drawing, including hiring charges HOM, cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Pillar
Providing Dressing to stone members four line dressing for face and two line dressing to have fine joints complete as per drawing, including hiring charges HOM, cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Capitals
Providing Dressing to stone members four line dressing for face and two line dressing to have fine joints complete as per drawing, including hiring charges HOM, cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Capitals
Providing Dressing to stone members four line dressing for face and two line dressing to have fine joints complete as per drawing, including hiring charges HOM, cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work.Upapeeta / Base Kalavary wall
Providing Dressing to stone members four line dressing for face and two line dressing to have fine joints complete as per drawing, including hiring charges HOM, cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Plain wall
Providing Dressing to stone members four line dressing for face and two line dressing to have fine joints complete as per drawing, including hiring charges HOM, cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Windows
Providing Dressing to stone members four line dressing for face and two line dressing to have fine joints complete as per drawing, including hiring charges HOM, cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Door base
Providing Dressing to stone members four line dressing for face and two line dressing to have fine joints complete as per drawing, including hiring charges HOM, cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Door jams
Providing Dressing to stone members four line dressing for face and two line dressing to have fine joints complete as per drawing, including hiring charges HOM, cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Lintel
Providing Dressing to stone members four line dressing for face and two line dressing to have fine joints complete as per drawing, including hiring charges HOM, cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work.Beams Outer
Providing Dressing to stone members four line dressing for face and two line dressing to have fine joints complete as per drawing, including hiring charges HOM, cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Beams inside
Providing Dressing to stone members four line dressing for face and two line dressing to have fine joints complete as per drawing, including hiring charges HOM, cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work.Beams inside
Providing Dressing to stone members four line dressing for face and two line dressing to have fine joints complete as per drawing, including hiring charges HOM, cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Beams inside
Providing Dressing to stone members four line dressing for face and two line dressing to have fine joints complete as per drawing, including hiring charges HOM, cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Viyala
Providing Dressing to stone members four line dressing for face and two line dressing to have fine joints complete as per drawing, including hiring charges HOM, cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Ceiling slabs
Providing Dressing to stone members four line dressing for face and two line dressing to have fine joints complete as per drawing, including hiring charges HOM, cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. steps
Providing Dressing to stone members four line dressing for face and two line dressing to have fine joints complete as per drawing, including hiring charges HOM, cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work.Yaali(1.40x0.20x1.00)
Providing Dressing to stone members four line dressing for face and two line dressing to have fine joints complete as per drawing, including hiring charges HOM, cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Paving alround
Constructing newly dressed stone members including conveying from stacked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges including hire charges for chain and pully block etc., including hire charges of scaffolding materials complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Upapeeta / Base
Constructing newly dressed stone members including conveying from stacked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges including hire charges for chain and pully block etc., including hire charges of scaffolding materials complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work . 1st Course
Constructing newly dressed stone members including conveying from stacked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges including hire charges for chain and pully block etc., including hire charges of scaffolding materials complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work .2nd Course
Constructing newly dressed stone members including conveying from stacked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges including hire charges for chain and pully block etc., including hire charges of scaffolding materials complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. 3rd Course
Constructing newly dressed stone members including conveying from stacked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges including hire charges for chain and pully block etc., including hire charges of scaffolding materials complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. 4th Course
Constructing newly dressed stone members including conveying from stacked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges including hire charges for chain and pully block etc., including hire charges of scaffolding materials complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Pillars Base
Constructing newly dressed stone members including conveying from stacked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges including hire charges for chain and pully block etc., including hire charges of scaffolding materials complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Pillars
Constructing newly dressed stone members including conveying from stacked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges including hire charges for chain and pully block etc., including hire charges of scaffolding materials complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Capitals
Constructing newly dressed stone members including conveying from stacked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges including hire charges for chain and pully block etc., including hire charges of scaffolding materials complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Kalavary wall
Constructing newly dressed stone members including conveying from stacked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges including hire charges for chain and pully block etc., including hire charges of scaffolding materials complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work.Plain wall
Constructing newly dressed stone members including conveying from stacked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges including hire charges for chain and pully block etc., including hire charges of scaffolding materials complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work.Windows
Constructing newly dressed stone members including conveying from stacked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges including hire charges for chain and pully block etc., including hire charges of scaffolding materials complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Door base 1.20 m length
Constructing newly dressed stone members including conveying from stacked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges including hire charges for chain and pully block etc., including hire charges of scaffolding materials complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Door jams 1.98 mt height
Constructing newly dressed stone members including conveying from stacked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges including hire charges for chain and pully block etc., including hire charges of scaffolding materials complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Lintel 1.20 mt length
Constructing newly dressed stone members including conveying from stacked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges including hire charges for chain and pully block etc., including hire charges of scaffolding materials complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Beams Outer
Constructing newly dressed stone members including conveying from stacked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges including hire charges for chain and pully block etc., including hire charges of scaffolding materials complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Beams inside
Constructing newly dressed stone members including conveying from stacked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges including hire charges for chain and pully block etc., including hire charges of scaffolding materials complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work Beams inside
Constructing newly dressed stone members including conveying from stacked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges including hire charges for chain and pully block etc., including hire charges of scaffolding materials complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Kapotha allround
Constructing newly dressed stone members including conveying from stacked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges including hire charges for chain and pully block etc., including hire charges of scaffolding materials complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Viyala
Constructing newly dressed stone members including conveying from stacked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges including hire charges for chain and pully block etc., including hire charges of scaffolding materials complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Ceiling slabs
Constructing newly dressed stone members including conveying from stacked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges including hire charges for chain and pully block etc., including hire charges of scaffolding materials complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. steps
Constructing newly dressed stone members including conveying from stacked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges including hire charges for chain and pully block etc., including hire charges of scaffolding materials complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Yaali(1.40x0.20x1.00)
Constructing newly dressed stone members including conveying from stacked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges including hire charges for chain and pully block etc., including hire charges of scaffolding materials complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Paving alround
Providing and constructing burnt brick masanry for basement and superstructure with approved quality of non-modula bricks of standard size of class designation 3.5 Newtons per Sqmm with cemenet mortor 1:6 including cost of materials, labour charges ,lead, lift, loading,unloading etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work.
Providing and Constructing Vimana Gopura to Sri Ganapathi temple at Bannur , Mysore District as per ancient style of such a manner that sculptures, ornamental flower, stucco figures, small domes of different sizes pillars at alternate height and width has to be constructed with a most care. After completion of brick masonry work of Vimana Gopura, structures are to be designed and these structures has to be finished by doing cornice work in cement mortar 1:3, necessary formwork, scaffolding has to be provided in such a manner by giving sufficient space for easy movement of pilgrims, for conveyence of construction materials from ground level up to the Vimana Gopura top, and also making provision for easy approch for inspection by the higher Authorities and officer in charge of work. The sacffolding should be removed after completion of Gopura work proper curing is to done for entire Vimana Gopura structure until painting work. (Minimum 30-45 days curing is required) including cost of materials, labour charges,lead, lift, loading,unloading etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work.
After proper curing of masonry work and plastering work water proof cement painting using ISI make materials one coat primer and 2 coat of water proof cement painting is to be done as per the direction of Higher Authorities. Proper curing s to be done and proper care is to be taken before and during the Execution of Vimana Gopura work, the entire work should be completed with in stipulated period in all respect as per the direction of the competent Authorities from time to time. (Full work) Construction of Brick masonry hara alround the porch including 11 nos prabavali 1m height including cost of materials, labour charges ,lead, lift, loading,unloading etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work.
Providing & laying Flooring using pre-polished water cut / gangsaw 19mm thick grey granite of width not lessthan 1200mm laid over bed of 20mm thick 1:4 C.M & jointed with neat cement slury mixed with pigment to match shade of granite slabs including laying POP on finished surface & cleaning the surface including cost of materials & labourers etc., including cost of materials, labour charges ,lead, lift, loading,unloading etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work.
Providing Mathi/Nandi wood frame door of size 0.9 X2.0 m, windows clere story windows, ventilators, and other frames wrought frames or assembled including making plaster grooves but including cost of materials labour team of HOM of machinery complete as per specification including cost of materials, labour charges ,lead, lift, loading,unloading etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work.
Providing flush pointing to square rubble , course or uncoursed stone masonry with cement mortat 1:3, 20mm deep , after raking joints to depth of 20mm nicely lining including cost of materials, labour, curing, including cost of materials, labour charges ,lead, lift, loading,unloading etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work.
Providing flush pointing to stone slabs pavements with cement mortat 1:3, after raking joints ,nicely lining including cost of materials, labour, curing, including cost of materials, labour charges ,lead, lift, loading,unloading etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Paving alround
2. Sri BisilumarammaTemple Earthwork in surface excavation for foundation of buildings, culverts water supply, sanitary lines and electrical conduits either in pits or in trenches 1.5m. and above width, in hard soil not exceeding 1.5m. in depth including dressing the bottom and sides of pits and trenches stacking the excavated soil clear from edges of excavation with lead after breaking of clods with all lifts and lead including all labour, hire charges of all machineries with all other incidental charges etc., complete and as per the direction of the Engineer-In-Charge for successful completion of work.
Providing and laying in position plain cement concrete of mix M 1:4:8 with OPC cement @ 180kgs, with 40mm and down size graded granite metal coarse aggregates @ 0.85cum and fine aggregates @ 0.57cum machine mixed, machine mixed, concrete laid in layers not exceeding 15cms thick well compacted, in foundation and plinth, including cost of all materials, labour HOM of machinery, curing, complete as per specifications. with all lifts and lead including all labour, hire charges of all machineries with all other incidental charges etc., complete and as per the direction of the Engineer-In-Charge for successful completion of work.
Providing and constructing granite/trap/basalt rubble stone masonry in foundation with cement mortor 1:6 stones hammered dressed in courses not less than 20cm high , bond stones at 2m. part in each course including cost of materials, labour, curing, c complete as per specifications. with all lifts and lead including all labour, hire charges of all machineries with all other incidental charges etc., complete and as per the direction of the Engineer-In-Charge for successful completion of work.
Providing and laying in position plain cement concrete of M20 with OPC cement @ 240Kgs., with 20mm and down size graded granite metal coarse aggregates @ 0.878 cum and fine aggregates @ 0.459 cum machine mixed, concrete laid in layers not exceeding 15cms thick well compacted, in foundation and plinth, including cost of all materials, labour, HOM of machinery, curing complete as per specifications. with all lifts and lead including all labour, hire charges of all machineries with all other incidental charges etc., complete and as per the direction of the Engineer-In-Charge for successful completion of work.(KSRB-4-1.6)
Providing ,supplying from Daddaballapura Quarry to workspot in Bannur Town and laying including quarrying of Doddaballapura stone slabs complete as per drawing, including hiring charges for chain and pully block transportation cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work Adhisthana courses
Providing Dressing to stone members four line dressing for face and two line dressing to have fine joints complete as per drawing, including hiring charges HOM, cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Wall
Providing Dressing to stone members four line dressing for face and two line dressing to have fine joints complete as per drawing, including hiring charges HOM, cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work.Door Base
Providing Dressing to stone members four line dressing for face and two line dressing to have fine joints complete as per drawing, including hiring charges HOM, cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Door jams
Providing Dressing to stone members four line dressing for face and two line dressing to have fine joints complete as per drawing, including hiring charges HOM, cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work.Door Lintel
Providing Dressing to stone members four line dressing for face and two line dressing to have fine joints complete as per drawing, including hiring charges HOM, cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Flooring slabs
Providing Dressing to stone members four line dressing for face and two line dressing to have fine joints complete as per drawing, including hiring charges HOM, cost of all materials, labour, loading, unloading, lead, lift, transporting, etc., complete as per specifications with all other incidental charges and as per the direction of the Engineer-In-Charge for successful completion of work. Coping stones
Constructing newly dressed stone members including conveying from stacked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges including hire charges for chain and pully block etc., complete including hire charges of scaffolding materials and as directed by the engineer in charge of work. Wall
Constructing newly dressed stone members including conveying from stacked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges including hire charges for chain and pully block etc., complete including hire charges of scaffolding materials and as directed by the engineer in charge of work. Door base
Constructing newly dressed stone members including conveying from stacked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges including hire charges for chain and pully block etc., complete including hire charges of scaffolding materials and as directed by the engineer in charge of work. Door jam
Constructing newly dressed stone members including conveying from stacked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges including hire charges for chain and pully block etc., complete including hire charges of scaffolding materials and as directed by the engineer in charge of work. Door Lintel
Constructing newly dressed stone members including conveying from stacked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges including hire charges for chain and pully block etc., complete including hire charges of scaffolding materials and as directed by the engineer in charge of work. Flooring Slabs
Constructing newly dressed stone members including conveying from stacked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges including hire charges for chain and pully block etc., complete including hire charges of scaffolding materials and as directed by the engineer in charge of work. Coping Stones
Providing and constructing brick masonry parapet wall of size 0.45m x 0.45cm in C.M1:4 with 1 no prabavali of size 1.60m breadth and 1.10m height including ornamental flowers stucco figures,sculptures and small domes and conice work as per drawing using good quality bricks including scaffolding,curing etc., complete including hire charges of scaffolding materials and as directed by the engineer in charge of work.
Providing Mathi/Nandi wood frame door of size 0.9 X 2.0m, windows clere story windows, ventilators, and other frames wrought frames or assembled including making plaster grooves but including cost of materials labour team of HOM of machinery complete as per specification including scaffolding, etc., complete as per specifications. with all lifts and lead including all labour, hire charges of all machineries with all other incidental charges etc., complete and as per the direction of the Engineer-In-Charge for successful completion of work.
Providing flush pointing to square rubble , course or uncoursed stone masonry with cement mortar 1:3, 20mm deep , after raking joints to depth of 20mm nicely lining including cost of materials, labour, curing, complete as per specifications. with all lifts and lead including all labour, hire charges of all machineries with all other incidental charges etc., and as per the direction of the Engineer-In-Charge for successful completion of work.
Providing flush pointing to stone slabs pavements with cement mortat 1:3, after raking joints ,nicely lining including cost of materials, labour, curing, completecomplete as per specifications. with all lifts and lead including all labour, hire charges of all machineries with all other incidental charges etc., and as per the direction of the Engineer-In-Charge for successful completion of work.
Bidder Name
K KRISHNAMOORTHY BHAT
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
temple3.pdf
Tender Documents • 1.15 MB
BOQ_562568.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .