Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹70.4 LAccepted-AOC NA | L-1 | Accepted-AOC 1 | |
| 2 | L-2₹39.3 L+₹74,898 (1.94%)Rejected-Finance HOUSE NO 214 WARD NO 2 TEHSIL SUJANPUR DISTT HAMIRPUR HP | HAMIRPUR | HIMACHAL PRADESH | 174304 | L-2 | Rejected-Finance 2 |
Tender Value
₹69.9 L
EMD Value
₹1.4 L
Closing Date
29 Apr 2026, 6:00 pmClosed
Executive Engineer
HPPWD Rooohru
RR Damage to link road
2026_PWD_134973_2
3123-3222 dated 21-4-26
Open Tender
Civil Works - Buildings
Percentage
120 days
offe
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,000
₹1.4 L
11 Jun 2026
22 Apr 2026
30 Apr 2026
22 Apr 2026
29 Apr 2026
22 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation for structure as per drawing and technical specification clause 305.1 I/c setting out ,construction of shoring and bracing removal of stums and other deletarious materials and disposal upto a lead of 50 metre, dressing of sides and bottom and back filling in tranches with excavated suitable material. | - | Per Cum | - | - |
| 2 | P/L Cement concrete 1:6:12 ( one cement : six sand : twelve graded stone aggregate forty millimeter nominal size)for plain/ reinforced concrete work in open foundation complete as per drawing and technical specification Clauses 802,803,1202& 1203. | - | Per Cum | - | - |
| 3 | Providing concrete for plain/reinforced concrete in open foundation complete as per drawing and technical specification clause 802,803,1202 & 1203. P.C.C. M-10 grade (1:3:6) ( For Sub Structure) | - | Per Cum | - | - |
| 4 | Providind concrete for plain/reinforced concrete in sub structure complete as per drawing and technical specification clause 802,804 805, 806,807,1202 & 1204. Nominal mix RCC/P.C.C. M-20 ( C.C. 1:2:4 ) | - | Per Cum | - | - |
| 5 | Providing and laying reinforced cement concrete M-20 in super structure as per drawings and technical specification clause 802,804,805,806,807,1202& 1204. | - | Per Cum | - | - |
| 6 | Providing and laying reinforced cement concrete M-30 in super structure as per drawings and technical specification clause 802,804,805,806,807,1202& 1204. | - | Per Cum | - | - |
| 7 | Providing concrete for plain/reinforced concrete in open foundation complete as per drawing and technical specification clause 802,803,1202 & 1203. P.C.C. M-10 grade (1:3:6) ( For Sub Structure) | - | Per Cum | - | - |
| 8 | Supplying fitting and placing HYSD bar reinforcement in super structure complete as per clause 1002, 1010 & 1202. | - | Per tonne | - | - |
| 9 | Providing weepholes in brick masonry/stone masonry/plain reinforced conrete abutment,wing wall, return wall with 100 mm dia. PVC pipe extending through the full width of the structures with slope of 1(v) : 20 (H) towards drawing face complete as per drawing and technical specification clauses 614,709,1204.3.7. | - | Each | - | - |
| 10 | Drainage spout complete as per drawing and technical specification clause 1209. | - | Each | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
SBD3.pdf
Tender Documents • 4.45 MB
BOQ_199724.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .