Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Finance | ₹1.7 L | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Target Enterprises L1 |
|---|---|---|---|---|
| 1.00 | Operation and maintenance of tube wells- Regular operation of tube wells installed with pumping machineries with round the clock monitoring, including complete repair and maintenance of pump set with cost of material and labour required for repairing and rewinding, lowering and un-lowering etc. The scope of work also includes repair and maintenance of panel board, main switches, kit-Kates, Electric connections, service cable and submersible cables inclusive of cost of material and labour required for uninterrupted functioning of tube wells. It is also inclusive of complete repair and maintenance of pipes connected with pump and motor, its replacement, if required, regular up keeping of log book etc. and other works as mentioned in tender document or scope of work complete in all respect and as directed by engineer in-charge. | 36 | per tube well per month | 3,650 ₹1.3 L |
| 2.00 | Operation and maintenance of pump houses- Regular operation and maintenance of pump houses located at WSS Complexe. The work includes operation of distribution line main valves for daily supply of water of the Industrial Area at supply times specified by corporation. Regular Operation of pump house installed with existing centrifugal , Monoblock pump , motors, with round the clock monitoring, including complete repair and maintenance of pump sets, connecting suction, delivery pipes jointing material, panel, main switches, kit-Kates, Electric connections, service cable including cost of material and labour required for repairing or rewinding, removal and replacement etc. for uninterrupted functioning of Electric Panels and Pump sets with regular up-keeping of log books, repair of leakages in pump glans and MS, CI, AC Pipeline system inside of WSS Campus complete, Regular chemical dosing in CWR maintaining general cleanliness at pump house and WSS Campus complete in all respect as directed by Engineer in-charge. | 12 | per pump house per month | 2,000 ₹24,000 |
| 3.00 | Maintenance of Distribution and Rising Main Pipe Line Network - Repair and maintenance of existing distribution and rising main pipe line system consisting of AC Pressure Pipeline , PVC, UPVC, HDPE, CI, DI Lines for maintaining smooth water supply in area covered under the scope of work. The scope of work includes timely repairing of leakage in all existing distribution and rising main pipeline of all sizes by digging out suitable size of pit in soft and loose soil or hard soil including cutting of Bituminous or Cement Concrete or WBM or WMM surface at any site of work at no extra cost. It is also inclusive of cutting of pipe ends, fixing of pipe pieces with jointing material to make repair leak proof and refilling the pit or trench by excavated soil by ramming it at all sides of pipes and up to ground level. Contractor will do dewatering at his own level by making necessary arrangements, if required. Contractor will use their own T and P, including the pipe line and jointing materials however sluice valves shall be provided by the Corporation but the contractor shall have to deposit the damaged material in RIICO store. But no additional payment shall be made on account of transportation. Total Length of existing distribution/rising main pipe line- 10 Kms | 12 | Per Month | 1,500 ₹18,000 |
Tender Value
₹2.5 L
EMD Value
₹5,040
Closing Date
11 May 2026, 6:00 pmClosed
Unit Head, RIICO, Sikar
Unit Head, RIICO, SIKAR
Operation and Maintenance of Water Supply With material at Ind. area SKS Reengus
2026_RIICO_555724_1
3/2026-27/287
Open Tender
Civil Works
365 days
Reengus
As per tender documents and Special Conditions
3 documents required · 3 mandatory
₹236
RIICO, SIKAR
₹5,040
12 May 2026
4 May 2026
12 May 2026
4 May 2026
11 May 2026
4 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Operation and maintenance of tube wells- Regular operation of tube wells installed with pumping machineries with round the clock monitoring, including complete repair and maintenance of pump set with cost of material and labour required for repairing and rewinding, lowering and un-lowering etc. The scope of work also includes repair and maintenance of panel board, main switches, kit-Kates, Electric connections, service cable and submersible cables inclusive of cost of material and labour required for uninterrupted functioning of tube wells. It is also inclusive of complete repair and maintenance of pipes connected with pump and motor, its replacement, if required, regular up keeping of log book etc. and other works as mentioned in tender document or scope of work complete in all respect and as directed by engineer in-charge. | - | per tube well per month | 100 | - | BI01010001010000000000000515BI0100001113 |
| 2 | Operation and maintenance of pump houses- Regular operation and maintenance of pump houses located at WSS Complexe. The work includes operation of distribution line main valves for daily supply of water of the Industrial Area at supply times specified by corporation. Regular Operation of pump house installed with existing centrifugal , Monoblock pump , motors, with round the clock monitoring, including complete repair and maintenance of pump sets, connecting suction, delivery pipes jointing material, panel, main switches, kit-Kates, Electric connections, service cable including cost of material and labour required for repairing or rewinding, removal and replacement etc. for uninterrupted functioning of Electric Panels and Pump sets with regular up-keeping of log books, repair of leakages in pump glans and MS, CI, AC Pipeline system inside of WSS Campus complete, Regular chemical dosing in CWR maintaining general cleanliness at pump house and WSS Campus complete in all respect as directed by Engineer in-charge. | - | per pump house per month | 100 | - | BI01010001010000000000000515BI0100001114 |
| 3 | Maintenance of Distribution and Rising Main Pipe Line Network - Repair and maintenance of existing distribution and rising main pipe line system consisting of AC Pressure Pipeline , PVC, UPVC, HDPE, CI, DI Lines for maintaining smooth water supply in area covered under the scope of work. The scope of work includes timely repairing of leakage in all existing distribution and rising main pipeline of all sizes by digging out suitable size of pit in soft and loose soil or hard soil including cutting of Bituminous or Cement Concrete or WBM or WMM surface at any site of work at no extra cost. It is also inclusive of cutting of pipe ends, fixing of pipe pieces with jointing material to make repair leak proof and refilling the pit or trench by excavated soil by ramming it at all sides of pipes and up to ground level. Contractor will do dewatering at his own level by making necessary arrangements, if required. Contractor will use their own T and P, including the pipe line and jointing materials however sluice valves shall be provided by the Corporation but the contractor shall have to deposit the damaged material in RIICO store. But no additional payment shall be made on account of transportation. Total Length of existing distribution/rising main pipe line- 10 Kms | - | Per Month | 10 | - | BI01010001010000000000000515BI0100001115 |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
Reengus.pdf
Tender Documents • 0.20 MB
BOQ_989631.xls
BOQ • 0.31 MB
WSSConditions.pdf
Additional Documents • 0.18 MB
Download all tender documents and submit your bid