Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance R 1 DUDDHI KASHI MORE ANPARA ATP COLONY NEAR VIP GUEST VILLAGE TOWN ANPARA CITY SONBHADRA SONBHADRA UTTAR PRADESH 231225 INDIA | SONBHADRA | UTTAR PRADESH | 231225 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance AURI MOR ANPARA SONEBHADRA ANPARA SONBHADRA UTTAR PRADESH 231225 | SONBHADRA | UTTAR PRADESH | 231225 | Admitted-Finance |
Tender Value
₹43.1 L
EMD Value
₹86,000
Closing Date
26 Sept 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer, O and MC-V, BTPS, Anpara
Office of The S.E., O and MC-V, BTPS, Anpara
05/CHD-I/BTPS/2022-23
2022_RVUNL_726273_1
05/CHD-I/BTPS/2022-23
Open Tender
Miscellaneous Works
Fixed-rate
365 days
Anpara Thermal Power Station
AS PER TENDER DOCUMENTS
3 documents required · 3 mandatory
₹1,180
Dy. CAO, CFO and BO, BTPS, Anpara
₹86,000
14 Oct 2022
5 Sept 2022
27 Sept 2022
5 Sept 2022
26 Sept 2022
5 Sept 2022
5 Sept 2022 - 26 Sept 2022
Amount
Removal of spilled/scattered coal, coal dust, coal slurry etc. from Track Hopper to SCH in general shift
Removal of coal, coal dust, coal slurry etc. from all equipments of CHP from Track Hopper to SCH in General Shift
Miscellaneous works in shift from Track Hopper to SCH
Shifting of coal from one conveyor to another conveyor due to failure of belt or any other equipments from Track Hopper to SCH
Track Hopper area '0' meter cleaning including ventilation/ DE Fan house etc.
Removal of slurry from the sump pump pits situated at minus level of Track Hopper
Drain cleaning in CHP 2 x 500 MW area SS-1, TP-21, TP-22 and PCH
Drain cleaning in CHP 2 x 500 MW area TP-23, SCH and TP-41
Drain cleaning in CHP 2 x 500 MW area 0' meter Track Hopper
Drain cleaning in CHP 2 x 500 MW area Minus level of Track Hopper
Removal of hopper choking
Removal of huge surging of coal due to failure of Equipment
Removal of spilled/scattered coal, coal dust, coal slurry etc. from different locations of CHP after SCH to Bunker Bay in General Shift
Removal of coal, coal dust, coal slurry etc. from all equipments of CHP after SCH to Bunker Bay in General Shift
Miscellaneous work in shift after SCH to Bunker Bay
Shifting of coal from one conveyor to another conveyor due to failure of belt or any other equipments after SCH to Bunker Bay
Drain cleaning of CHP 2 x 500 MW area Compressor house, MSS
Drain cleaning of CHP 2 x 500 MW area SS-2, TP-24, TP-25
Drain cleaning of CHP 2 x 500 MW area C-32, Emergency Hopper
Drain cleaning of CHP 2 x 500 MW area TP-28, TP-42, TP-29, fan House
Shifting of overflow coal from coal stack yard
Cleaning/ sweeping, up keeping of SS1, SS-2, MSS, Compressor Room and Office Buildings
Cleaning/ sweeping, up keeping of Control Room, Battery Room, JE site office, BTPS
Toilet/ Bathroom cleaning MSS, SS-1, SS-2, T/H Control Room
Toilet/ Bathroom cleaning CHP, 2 x 500 MW area
Toilet/ Bathroom cleaning Blockage removal of toilet seat
Removal of huge surging of coal due to failure of Equipment
Transportation of coal dust/ slurry from different places of CHP (2x500 MW) to coal stack yard within radial distance of 2 km
Transportation of coal from reject chutes of Primary Crushers of CHP (2x500 MW) to the cola stack yard within a radial distance of 2 km
Segregation of stones/ other foreign material from the reject of Primary Crusher of CHP( 2x500 MW) and transportation of stone to other site within a radial distance of 2 km
Collection and stacking of spilled coal on ground under different structure/ overhead conveyors of CHP (2x500 MW) and its transportation to coal stack yards
Transportation of coal from coal bunker to coal stack yard
Cleaning/ Upkeeping of Cable Trenches Main Trench to SS-2
Cleaning/ Upkeeping of Cable Trenches SS-2 to TP-25
Cleaning/ Upkeeping of Cable Trenches Main Trench to TP-24
Cleaning/ Upkeeping of Cable Trenches Main Trench to TP-23
Cleaning/ Upkeeping of Cable Trenches Main Trench to compressor room
Cleaning/ Upkeeping of Cable Trenches Main Trench to MSS, Double Trench
Cleaning/ Upkeeping of Cable Trenches Main Trench to MSS
Cleaning/ Upkeeping of Cable Trenches Main Trench to TP-41
Cleaning/ Upkeeping of Cable Trenches Main Trench to SCH
Cleaning/ Upkeeping of Cable Trenches Trench inside SCH building
Cleaning/ Upkeeping of Cable Trenches Main Trench to Secondary yard
Cleaning/ Upkeeping of Cable Trenches Main Trench to PCH
Cleaning/ Upkeeping of Cable Trenches Main Trench to TP-21 to SS-1, Double Trench
Cleaning/ Upkeeping of Cable Trenches TP-21 to Track Hopper
Cleaning/ Upkeeping of Cable Trenches SCH to TP-21
Cleaning/ Upkeeping of Cable Trenches SCH to TP-24
Cleaning/ Upkeeping of Cable Trenches SCH to SS-2
Cleaning/ Upkeeping of Cable Trenches Secondary yard to Sump Pump station 44
Cleaning/ Upkeeping of Cable Trenches Sump Pump station 44 to TP-42
Cleaning/ Upkeeping of Cable Trenches Track Hopper (Tail end) to Weigh Bridge
Cleaning/ Upkeeping of Cable Trenches Cable trench pit of S/R Machine, Cable trench pit of T/H (Tail end) to Weigh Bridge
M/S RAJENDRA PRASAD CONTRACTOR
M/S MAHENDRA SINGH AND CO.
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .