Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.1 LAccepted-AOC 142 SECTOR 16 AVAS VIKAS COLONY FRONT OF RAILWAY LINE SIKANDRA AGRA AGRA UTTAR PRADESH 282007 | AGRA | UTTAR PRADESH | 282007 | ₹46.1 L | L1 | Accepted-AOC aoc |
| 2 | L2₹46.1 LRejected-Finance GSTIN: 09ECMPP2509H1ZA | ₹46.1 L | L2 | Rejected-Finance a |
| 3 | L3₹67.3 LRejected-Finance GSTIN: 09AANPU2444F1ZEMAHUADABAR PACHAT MISHROLIYA DISTRICT GORAKHPUR UTTAR PRADESH | GORAKHPUR | UTTAR PRADESH | 273001 | ₹67.3 L | L3 | Rejected-Finance a |
Tender Value
₹75 L
EMD Value
₹5.8 L
Closing Date
30 Apr 2026, 12:00 pmClosed
SE BASTI CIRCLE PWD BASTI
O/o SE BASTI CIRCLE PWD BASTI
CONSTRUCTION OF PANTOON BRIDGE AT MUDIYARI CHAURA GHAT ON KUANO RIVER IN PAULI BLOCK IN DISTT SANT KABIR
2026_CEUBZ_1141209_1
1444/4-E-Nivida-Basti Circle/2026 Dt. 11.03.2026
Open Tender
Civil Works - Roads
120 days
BASTI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
Yes
₹5.8 L
Yes
O/o SE BASTI CIRCLE PWD BASTI
3 Jun 2026
24 Apr 2026
30 Apr 2026
24 Apr 2026
30 Apr 2026
24 Apr 2026
27 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Cartage of Pantoon by Truck/Tailor from Prayagraj (Allahabad) ghat site to Mudiyari Chaura ghat site including loading unloading with the help of crane, labour, T&P etc complete. as per direction of E/I excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes | - | Nos | - | - | |
Cartage of Railing post from Prayagraj (Allahabad) ghat site to Mudiyari Chaura ghat site (store) including cost of loading, unloading, stacking and its cartage up to site including cost of all labour, T&P etc required for proper completion of the work.excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes | - | Nos | - | - | |
Cartage of R.S. Joist 5.20 mtr long from Prayagraj (Allahabad) ghat site to Mudiyari Chaura ghat site (store) including cost of loading, unloading, stacking and its cartage up to site including cost of all labour, T&P etc required for proper completion of the work. excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes | - | MT | - | - | |
Cartage of manhole cover from Prayagraj (Allahabad) ghat site to Mudiyari Chaura ghat site (store) including cost of loading, unloading, stacking and its cartage up to site including cost of all labour, T&P etc required for proper completion of the work. excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes | - | Nos | - | - | |
Cartage of chequerred plate from Prayagraj (Allahabad) ghat site to Mudiyari Chaura ghat site (store) including cost of loading, unloading, stacking and its cartage up to site including cost of all labour, T&P etc required for proper completion of the work. excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes | - | Nos | - | - | |
Cartage of iron anchor from Prayagraj (Allahabad) ghat site to Mudiyari Chaura ghat site (store) including cost of loading, unloading, stacking and its cartage up to site including cost of all labour, T&P etc required for proper completion of the work. excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes | - | Nos | - | - | |
Cartage of sal sliper / Sal edging from Prayagraj (Allahabad) ghat site to Mudiyari Chaura ghat site (store) including cost of loading, unloading, stacking and its cartage up to site including cost of all labour, T&P etc required for proper completion of the work. excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes | - | MT | - | - | |
Local shifting of Pantoon within 500m with the help of crain excluding G.S.T.excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. | - | Nos | - | - | |
Dragging the Pantoon pair from dry bed to the river water and making pair and anchoring them in the down stream side of Pantoon bridge excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes . | - | Nos. Pair | - | - | |
During carring the pantoon pair from place of anchoring (D/s side bridge) in water and to cross the dry bed/ shailow water on the way up to the aling ment disconnecting the pantoon pair and rolling the pantoon and fixing the alingment after excluding G.S.T.excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. | - | Nos. Pair | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.36 MB
Tendernotice_2.pdf
PDF • 0.93 MB
PANTOON.pdf
Tender Documents • 3.89 MB
BOQ_2131130.xls
BOQ • 0.44 MB