Tender Value
₹16.9 L
EMD Value
₹16,920
Closing Date
8 Jun 2026, 5:00 pm3d left
COMMISSIONER, SMC
SAMBALPUR MUNICIPAL CORPORATION,DURGAPALI
Construction of Paver road and drain at i. Lane-01,Saraswati Vihar ii. P. Pandey to S.N Dani House connecting to Prakash Jena House, Ambira Nagar, Ward No 28
2026_ORULB_129864_5
13/SMC_SBP/2026-27
Open Tender
Civil Works - Others
SAMBALPUR MUNICIPAL CORPORATION
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹16,920
Yes
30 May 2026
30 May 2026
9 Jun 2026
30 May 2026
8 Jun 2026
30 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Dismantling of Cement Concrete Grade M-15 & M- 20 including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres | 28.2 | cum | 840 | ₹23,688 | BI01010001010000000000000515BI0099999817 |
| 2 | Removal of excavated dismantled materials away from work site by mechanical means within 5km lead including loading unloading etc complete. | - | cum | 320.6 | - | BI01010001010000000000000515BI0099999818 |
| 3 | Earthwork in excavation of foundation in hard or gravelly soil with initial lead & lift including rough dressing & levelling the bed etc. complete. | - | cum | 225.7 | - | BI01010001010000000000000515BI0099999819 |
| 4 | Supplying , filling Sand in F & P including cost, Conveyance & royalty of sand, cost of all labour, T & P, labour cess, watering, ramming etc. complete. | 15.9 | cum | 814.1 | ₹12,944.19 | BI01010001010000000000000515BI0099999820 |
| 5 | Cement Concrete (1:4:8) using 4cm size B.H.G. (C. B.) Metal including cost, conveyance , royalty & taxes of all materials etc. complete | 85.8 | cum | 5,376.9 | ₹4,61,338.02 | BI01010001010000000000000515BI0099999821 |
| 6 | P.C.C. work in (1:2:4) with 12mm size crusher brocken h.g. chips mixing with concrete mixture laying , compacting including cost of all material with taxes , watering, curing labour required for the work etc but excluding centring, shuttering . Complete as per direction of E-I-C.Cement concrete (1:2:4) using 12mm. size c.b.b.h.g chips including cost of all materials etc. complete. | 8.8 | cum | 7,382.2 | ₹64,963.36 | BI01010001010000000000000515BI0099999822 |
| 7 | R.C.C work M-20 grade with 20mm & down grade crusher broken hard Granite chips | 47.1 | cum | 5,656.3 | ₹2,66,411.73 | BI01010001010000000000000515BI0099999823 |
| 8 | Providing reinforcement for RCC work with cutting bending binding , placing in proper position as per design including cost of steel , binding wire and labour required for bending , binding . Complete as per direction of E-I-C. | 21.17 | Qntl | 8,527.3 | ₹1,80,522.94 | BI01010001010000000000000515BI0099999824 |
| 9 | Rigid smooth centring and shuttering for R.C.C. works including false work and dismantling then after casting including cost of materials complete in ground floor. Complete as per direction of E-I-C. | 435.8 | Sqm. | 248.1 | ₹1,08,121.98 | BI01010001010000000000000515BI0099999825 |
| 10 | Providing, spreading Quarry Rubbish in Sub-Base in layers not exceeding 22.5cm. including watering ,compacting to the required density in O.M.C. with rolling by Vibratory Roller as per O.P.W.D. specifications including cost, conveyance & royalty of all materials,cost of all labour, T & P, labour cess, watering, turfedging, hire & running charges of Vibratory Roller etc. complete. | 69.9 | cum | 1,398.45 | ₹97,751.66 | BI01010001010000000000000515BI0099999826 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_593116.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid