| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.6 LAccepted-Finance C O ANISH KUMAR GOYAL PURENAH PARA ROAD WARD NO 5 SAKTI SAKTI CHHATTISGARH 495689 UDYAM CG 32 0004643 | JANJGIR CHAMPA | CHHATTISGARH | 495689 | ₹44.6 L | L1 | Accepted-Finance first lowest |
| 2 | L2₹47.2 LRejected-Finance | ₹47.2 L | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical document incomplete |
| Sl No | Description | Qty | Unit | M/S MAA SHARDA CONSTRUCTION AND SUPPLIERS L1 | NIRANJAN SINGH CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | E/W excavation in foundation M.K.R. soil including initial lead and lift as per proper completion of work. | 487.42 | cum | 95.22 ₹46,412.13 | 90 ₹43,867.8 Lowest |
| 2.00 | Supplying & Laying coarse sand in foundation with all cost of material, labour, T&P etc required for completion of work. | 66.15 | cum | 1,472.37 ₹97,397.28 | 1,450 ₹95,917.5 Lowest |
| 3.00 | Laying P.C.C. 1:3:6 (M-10) in foundation with all cost of sand, cement & stone ballast T&P etc required for completion of work. | 111.87 | cum | 3,372.84 ₹3,77,319.61 Lowest | 3,600 ₹4,02,732 |
| 4.00 | Laying R.C.C. 1:1:2 (M-25) in slab with all cost of sand, cement & stone ballast T&P etc required for completion of work. | 227.77 | cum | 5,639.81 ₹12,84,579.52 | 5,200 ₹11,84,404 Lowest |
| 5.00 | Laying C.C. 1:2:4 (M-15) in slab with all cost of sand, cement & stone ballast T&P etc required for completion of work. | 34.94 | cum | 4,013 ₹1,40,214.22 Lowest | 4,300 ₹1,50,242 |
| 6.00 | Steel reinforcement for R.C.C. work including cutting, bending, binding with G.I. wire and placing in position with cost of steel reinforcement. | 30.93 | MT | 51,452 ₹15,91,616.17 Lowest | 61,000 ₹18,86,974 |
| 7.00 | Centering & shuttering for R.C.C. work with all cost of labour material T&P etc. required for completion of work. | 992.45 | Sqm | 653.76 ₹6,48,824.11 Lowest | 750 ₹7,44,337.5 |
| 8.00 | Laying and fixing joint filler board 20 mm including cost of sealing compound labour, T&P etc required for proper completion of work. | 32.52 | RM | 624.16 ₹20,297.68 Lowest | 650 ₹21,138 |
| 9.00 | Providing & Fixing drainage spout pipe of G.I. 100 mm dia including cost of labour T&P etc required for proper completion of work. | 10 | No | 1,228.31 ₹12,283.1 Lowest | 1,400 ₹14,000 |
| 10.00 | E/W in filling in MKR soil for making diaversion with lead up to initial 30 m T&P etc required for proper completion of work. | 1,038.67 | cum | 212.85 ₹2,21,080.91 | 150 ₹1,55,800.5 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
11 Jun 2026, 3:30 pmClosed
SE ICC MAHOBA
OFFICE OF THE SE ICC BAZARIYA MAHOBA
Making Canal Crossing at Km. 49.300 of Kabrai Main Canal (Lot 1)
2026_UPIDC_1153976_1
02/SE/2026-27
Open Tender
Civil Works
Item Rate
270 days
HAMIRPUR
AS PER TENDER NIT AND TENDER DOCUMENT
2 documents required · 2 mandatory
₹3,372
₹1.1 L
25 Aug 2026
26 May 2026
11 Jun 2026
26 May 2026
11 Jun 2026
26 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W excavation in foundation M.K.R. soil including initial lead and lift as per proper completion of work. | 487.42 | cum | 119.5 | ₹58,246.69 |
| 2 | Supplying & Laying coarse sand in foundation with all cost of material, labour, T&P etc required for completion of work. | 66.15 | cum | 1,841.29 | ₹1,21,801.33 |
| 3 | Laying P.C.C. 1:3:6 (M-10) in foundation with all cost of sand, cement & stone ballast T&P etc required for completion of work. | 111.87 | cum | 4,285.22 | ₹4,79,387.56 |
| 4 | Laying R.C.C. 1:1:2 (M-25) in slab with all cost of sand, cement & stone ballast T&P etc required for completion of work. | 227.77 | cum | 7,226.35 | ₹16,45,945.74 |
| 5 | Laying C.C. 1:2:4 (M-15) in slab with all cost of sand, cement & stone ballast T&P etc required for completion of work. | 34.94 | cum | 5,115.38 | ₹1,78,731.38 |
| 6 | Steel reinforcement for R.C.C. work including cutting, bending, binding with G.I. wire and placing in position with cost of steel reinforcement. | - | MT | 69,002 | - |
| 7 | Centering & shuttering for R.C.C. work with all cost of labour material T&P etc. required for completion of work. | 992.45 | Sqm | 817 | ₹8,10,831.65 |
| 8 | Laying and fixing joint filler board 20 mm including cost of sealing compound labour, T&P etc required for proper completion of work. | 32.52 | RM | 781.2 | ₹25,404.62 |
| 9 | Providing & Fixing drainage spout pipe of G.I. 100 mm dia including cost of labour T&P etc required for proper completion of work. | 10 | No | 1,539 | ₹15,390 |
| 10 | E/W in filling in MKR soil for making diaversion with lead up to initial 30 m T&P etc required for proper completion of work. | 1,038.67 | cum | 265.76 | ₹2,76,036.94 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.39 MB
LOTTD1.pdf
Tender Documents • 2.04 MB
BOQ_2161657.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].