| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 LAccepted-Finance R O VILLAGE POST OFFICE ICHHI TEHSIL KANGRA DISTT KANGRA H P | ₹6.2 L | L1 | Accepted-Finance L1 |
| 2 | L2₹6.5 L+₹29,544.62 (4.74%)Rejected-Finance | ₹6.5 L+₹29,544.62 (4.74%) | L2 | Rejected-Finance L2 |
Tender Value
₹6.6 L
EMD Value
₹13,500
Closing Date
23 Jul 2026, 2:30 pmClosed
Executive Engineer NH Division HPPWD Hamirpur
Executive Engineer NH Division HPPWD Hamirpur
Restoration of Road damages on NH303 Nagrota Bagwan Ranital Mubarikpur road in Km 00 to 390 SH Construction of Rain shelter at RD 7400 at Village Bhadred hilly side
2026_PWD_139249_1
PW-NHD-GA-Tender/2025-26- 2409 Dated 01.07.2026
Open Tender
Civil Works - Buildings
Percentage
30 days
Hamirpur
Please refer Tender documents.
11 documents required · 11 mandatory
₹350
₹13,500
20 Aug 2026
17 Jul 2026
23 Jul 2026
17 Jul 2026
23 Jul 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation for all type of road structure such as retaining walls, breast walls, culverts, drains and parapets etcetra. in all type of classification of soil comprising of ordinary soil, ordinary rock, hard rocks, chiseling/ wedging out of rock (where blasting is prohibited) as per drawings and MORT&H specification clause 305.1 and as per direction of the Engineer-in-charge including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal of materials upto all lead and lift, including dressing of sides and bottom and back filling in trenches with excavated suitable approved material to the original surface in layers not exceeding 150mm (One hundred fifty millimetre) compacted thickness including shoring and structting and pumping and bailing out water (surface and sub soil water upto any depth and any quantum of water including cleaning of slush which may arise out during dewatering as per the direction of the Engineer-in-Charge and carriage of material within all leads and lifts and other incidentals charges. | 54.36 | Per Cubic metre | 200 | ₹10,872 |
| 2 | Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specfication clause 802,803,1202, & 1203. PCC Grade M10 (Nominal mix 1:3:6) including entire carriage of material with in all leads amd lifts and other incidental charges.The rates are inclusive octroi , royality , Malkana, toll tax, Sale tax, Good service tax, labour cess or other taxes imposed by the Government. | 17.7 | Per Cubic metre | 4,900 | ₹86,730 |
| 3 | Providing weep holes in brick masonry/ plain /reinforced concrete abutment wing wall/ return wall etc.with 100mm dia (One Hundred Millimeters) PVC pipe extended through the full width of the structure with slope of 1(V) 20H towards drainage face complete as per drawing and technical specification clauses 614, 709, 1204.3.7 including carriage of material with in all leads and lifts as per the direction of Engineer-in-Charge.The rates are inclusive octroi , royality , Malkana, toll tax, Sale tax, Good service tax, labour cess or other taxes imposed by the Government. | 7 | Each | 250 | ₹1,750 |
| 4 | Providing plain/ reinforced concrete PCC M-15 (1:2:5:5 )( One Cement: two point five sand: five aggregate) in open foundation complete as per drawings and technical specifications clause 802 ,803,1202 and 1203 including the cost of centering, shuttering and finishing as per direction of Engineer-in-Charge including entire carriage of material within all leads and lifts and other incidentals.The rates are inclusive octroi , royality , Malkana, toll tax, Sale tax, Good service tax, labour cess or other taxes imposed by the Government. | 2.35 | Per Cubic metre | 5,100 | ₹11,985 |
| 5 | Providing and laying All works upto plinth level in position machine batched and machine mixed design mix M-25 (1:1.5:3) (one: cement, one point five: sand, three : graded stone) for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability within all leads, lifts and other incidentals complete as per the direction of Engineer-in-charge.The rates are inclusive octroi , royality , Malkana, toll tax, Sale tax, Good service tax, labour cess or other taxes imposed by the Government | 2.83 | Per Cubic metre | 6,200 | ₹17,546 |
| 6 | Centering and shuttering including strutting, propping etcetra. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers within all leads, lifts and other incidentals complete as per the direction of Engineer-in-charge.The rates are inclusive octroi , royality , Malkana, toll tax, Sale tax, Good service tax, labour cess or other taxes imposed by the Government. | 20.5 | Per square metre | 250 | ₹5,125 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (one cement : one point five coarse sand : three graded stone aggregate) 20mm (twenty milimetre) nominal size. within all leads, lifts and other incidentals complete as per the direction of Engineer-in-charge.The rates are inclusive octroi , royality , Malkana, toll tax, Sale tax, Good service tax, labour cess or other taxes imposed by the Government. | 4.87 | Per Cubic metre | 6,200 | ₹30,194 |
| 8 | Steel reinforcement Thermo-Mechanically Treated bars of grade Fe-500D or more. for Reinforced cement concrete work ready to use "cut and bend" rebars of approved make from factory/workshop to construction site including placing in position and binding all complete upto plinth level. within all leads, lifts and other incidentals complete as per the direction of Engineer-in-charge.The rates are inclusive octroi , royality , Malkana, toll tax, Sale tax, Good service tax, labour cess or other taxes imposed by the Government. | 608.75 | Per kilogramme | 85 | ₹51,743.75 |
| 9 | Brick work with Cement mortar 1:6 (one cement : six coarse sand) common burnt clay F.P.S. (non modular) bricks of class designation 7.5 (seven point five) in foundation and plinth in: within all leads and lifts and other incidentals complete as per the direction of Engineer-in-charge.The rates are inclusive octroi , royality , Malkana, toll tax, Sale tax, Good service tax, labour cess or other taxes imposed by the Government. | 5.93 | Per Cubic metre | 8,500 | ₹50,405 |
| 10 | 12 mm (twelve milimetre)cement plaster of mix : 1:4 (one cement: four fine sand) within all leads, lifts and other incidentals complete as per the direction of Engineer-in-charge.The rates are inclusive octroi , royality , Malkana, toll tax, Sale tax, Good service tax, labour cess or other taxes imposed by the Government. | 18.24 | Per square metre | 300 | ₹5,472 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
SBD.pdf
Tender Documents • 3.01 MB
BOQ_206336.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .