| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.3 LAdmitted-Finance | -27.11% | ₹4.3 L | L1 | Admitted-Finance |
| 2 | L2₹5.3 L+₹1.0 L (23.5%)Admitted-Finance | -10.00% | ₹5.3 L+₹1.0 L (23.5%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-Tender rejected due to not uploading of Undertaking ₹ 100/- during the CFY 2026-27) (T3/3) as per term & condition of SBD |
Tender Value
₹5.8 L
EMD Value
₹11,700
Closing Date
3 Aug 2026, 6:00 pmClosed
Ex. Engineer
Jal Shakti (PHE) Division Doda
Providing Laying and fixing of GI Pipes line for New Colony Lower Chakka Bhaderwah under District Capex Budget 2026-27 (JKSSR 2022)
2026_PHE_317201_4
e-NIT No. EE/JS(PHE)D/D/09 of 07/2026-27
Open Tender
Civil Works
Percentage
Doda
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Yes
Ex. Engineer
₹11,700
19 Aug 2026
23 Jul 2026
4 Aug 2026
23 Jul 2026
3 Aug 2026
23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed by Engineer incharge in all kind of soil. | 157.58 | Cum | 479.3 | ₹75,528.09 |
| 2 | Filling available excavated earth ( excluding rock) in trenches, plinth side of foundationetc. In layer not excedding 20cm in depth , lead upto 50mtr and lift upto 1.5mtr | 126.06 | Cum | 180.55 | ₹22,760.13 |
| 3 | Providing Laying and fitting of G.I. pipes (all classes) complete including cost of pipes, Excluding cost of Earthwork and refilling etc . G.I Pipe 15mm ϕ | 500 | Meter | 179.2 | ₹89,600 |
| 4 | Providing Laying and fitting of G.I. pipes (all classes) complete including cost of pipes, Excluding cost of Earthwork and refilling etc . G.I Pipe 20mm ϕ | 310 | Meter | 227.9 | ₹70,649 |
| 5 | Providing Laying and fitting of G.I. pipes (all classes) complete including cost of pipes, Excluding cost of Earthwork and refilling etc .. G.I Pipe 25mm ϕ | 450 | Meter | 311.95 | ₹1,40,377.5 |
| 6 | Providing Laying and fitting of G.I. pipes (all classes) complete including cost of pipes, Excluding cost of Earthwork and refilling etc . G.I Pipe 32mm ϕ | 90 | Meter | 384 | ₹34,560 |
| 7 | Providing Laying and fitting of G.I. pipes (all classes) complete including cost of pipes, Excluding cost of Earthwork and refilling etc . G.I Pipe 40mm ϕ | 60 | Meter | 434.65 | ₹26,079 |
| 8 | Providing Laying and fitting of G.I. pipes (all classes) complete including cost of pipes, Excluding cost of Earthwork and refilling etc . G.I Pipe 50mm ϕ | 12 | Meter | 532.8 | ₹6,393.6 |
| 9 | Providing Laying and fitting of G.I. pipes (all classes) complete including cost of pipes, Excluding cost of Earthwork and refilling etc . G.I Pipe 100mm ϕ | 12 | Meter | 1,255.15 | ₹15,061.8 |
| 10 | Providing Laying and fitting of HDPE pipes (PN16) complete including cost of pipes, Excluding cost of Earthwork and refilling etc 63mm ϕ nominal bore. | 300 | Meter | 219 | ₹65,700 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_1038427.xls
BOQ • 0.30 MB
Corrigendum.pdf
PDF • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .