| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAccepted-AOC | ₹2.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.7 LRejected-AOC | ₹2.7 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | MURUGAN CONSTRUCTIONS L1 | KJ Contractor L2 |
|---|---|---|---|---|---|
| 1.00Uthukadu Medu to Ariyampalayam Road Km 0/0-0/740 H/O Irugalur | |||||
| 2.00 | Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by the departmental officers including all incidental charges etc., complete. Km 0/0- 0/740 | 264 | m2 | 6 ₹1,584 | 19 ₹5,016 |
| 3.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5 Km 0/0-0/740 | 26.19 | m3 | 2,863 ₹74,981.97 | 3,896 ₹1.0 L |
| 4.00 | Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction . Km 0/0- 0/740 | 29.25 | m2 | 341 ₹9,974.25 | 536 ₹15,678 |
| 5.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., . Km 0/0- 0/740 | 261.75 | m2 | 19.2 ₹5,025.60 | 19.22 ₹5,030.84 |
| 6.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. . Km 0/0- 0/740 | 261.75 | m2 | 83.8 ₹21,934.65 | 83.84 ₹21,945.12 |
| 7.00 | BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as
per specification using CMP as per clause 507 of MORTH Rev-5 Km 0/0- 0/740 | 6.55 | m3 | 11,580.65 ₹75,853.26 | 11,580.65 ₹75,853.26 |
| 8.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 34,084 ₹34,084 | 40,601 ₹40,601 |
Tender Value
₹2.3 L
EMD Value
₹2,500
Closing Date
10 Nov 2025, 3:00 pmClosed
BDO (BP)
BDO office Sankari
Uthukadu Medu to Ariyampalayam Road Km 0/0-0/740 H/O Irugalur Panchayat Sankari Block at Salem District - Rural Road Maintenance Scheme 2025-26 Pothole Repairs Work No. 02
2025_RDTN_617164_2
Roc.No.3070/2025/A2
Open Tender
Civil Works - Roads
90 days
BDO office Sankari
As per tender document
2 documents required · 2 mandatory
₹0
₹2,500
12 Mar 2026
25 Oct 2025
10 Nov 2025
25 Oct 2025
10 Nov 2025
25 Oct 2025
Amount
Uthukadu Medu to Ariyampalayam Road Km 0/0-0/740 H/O Irugalur
Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by the departmental officers including all incidental charges etc., complete. Km 0/0- 0/740
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5 Km 0/0-0/740
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction . Km 0/0- 0/740
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., . Km 0/0- 0/740
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. . Km 0/0- 0/740
BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 Km 0/0- 0/740
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
KJ Contractor (BID ID -1505273)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_737544.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
02.pdf
Tender Documents • 1.00 MB
BOQ_737544.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid